Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Eprocure
Opening Date13 Nov 2019
Closing Date3 Dec 2019
Tender Amount₹ 1,06,62,000 
Notes
Download

Costs

Summary

Dharmapuri District - Upgradation / Strengthening / Renewal Of Roads 1 Nos In Package No. Tn04- 11 Sfc Pu- 2018-19 Palacode Block P11

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A

1302.75

-

-

... More
Collection and suply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compation with power roller etc complete

-

-

-

... More
Km.0/0-1/0

253.8

-

-

... More
Km.1/0-2/05

267.3

-

-

... More
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) WBM Grade II

-

-

-

... More
Km.0/0-1/0

208.89

-

-

... More
Km.1/0-2/05

217.75

-

-

... More
Providing and laying water bound macadam 75 mm consolidated thickenss with Grade III metal using 1.00 cum of 63 mm to .11.20 mm IRC size HBG Metal with 0.24 cum of Gravel for blindage per 10 Sqm. Including cost and coveyance of all materials to work site and stacking them at the site to departmental gauge for pre-measurement and labour charges for spreading metal and gravel, hand packing to camber, watering with all loads for water and compaction by 80.100 km power roller including hire charges and fuel charges for power employed including necessary earthern bund to protect edges, lighting, guarding, barricadings and maintenance of diversion etc. complete as per clause 404 of most Specification.

-

-

-

... More
Km.0/0-1/0

208.89

-

-

... More
Km.1/0-2/05

217.75

-

-

... More
Providing and laying TACK COAT over the WBM surface using 4.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.

-

-

-

... More
Km.0/0-2/05

5740.8

-

-

... More
Providing and laying premix carpet with seal coat type A for 20mm thickness using 0.18 Cum of 13.20 mm IRC size HGB metal and 0.09 cum of 11.20 mm IRC size HGB metal with and 0.09Cum of 6.70 mm IRC size HGB metal 24.40 kg of 60/70 bitumen for premixing 10 Sqm of Premix carpet including cost and conveyance of all materials to the work site and stacking them to the departmental metric gauge for Premeasurement, heating the bitumen in bitumen boiler, heating the aggregate and mixing them with bitumen in mini hot mix plant for premix carpet only, rolling by 80-100 KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet, application of bitumen for seal coat separately over premix carpet etc., including hire charges and fuel charges for Mini hot mix Plant, bitumen boiler, power roller and all other tools and plants employed but excluding cost of primer/tack cost etc., complete as per clause 509 of MOST specification..

-

-

-

... More
Km.0/0-1/0

2820

-

-

... More
Km.1/0-2/05

2920.8

-

-

... More
1.50m Span Culvert @ Ch.0/110 m

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation.

70.27

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.

9.06

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

70.24

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification. Centering

-

-

-

... More
Culvert

135.37

-

-

... More
Deck Slab

9.88

-

-

... More
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum

2.69

-

-

... More
Reinforcement Concrete 1: 1 .5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed.

2.65

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

0.24

-

-

... More
Provision for Bitument Pad

4.878

-

-

... More
1.50m Span Culvert @ Ch.0/400 m

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation.

70.27

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.

9.06

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

70.24

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification. Centering

-

-

-

... More
Culvert

135.37

-

-

... More
Deck Slab

9.88

-

-

... More
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum

2.69

-

-

... More
Reinforcement Concrete 1: 1 .5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed.

2.65

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

0.24

-

-

... More
Provision for Bitument Pad

4.878

-

-

... More
1.50m Span Culvert @ Ch.0/790 m

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation.

70.27

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.

9.06

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

70.24

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification. Centering

-

-

-

... More
Culvert

135.37

-

-

... More
Deck Slab

9.88

-

-

... More
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum

2.69

-

-

... More
Reinforcement Concrete 1: 1 .5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed.

2.65

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

0.24

-

-

... More
Provision for Bitument Pad

4.878

-

-

... More
1.50m Span Culvert @ Ch.0/970 m

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation.

70.27

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.

9.06

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

70.24

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification. Centering

-

-

-

... More
Culvert

135.37

-

-

... More
Deck Slab

9.88

-

-

... More
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum

2.69

-

-

... More
Reinforcement Concrete 1: 1 .5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed.

2.65

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

0.24

-

-

... More
Provision for Bitument Pad

4.878

-

-

... More
1.50m Span Culvert @ Ch.1/278 m

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation.

70.27

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.

9.06

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

70.24

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification. Centering

-

-

-

... More
Culvert

135.37

-

-

... More
Deck Slab

9.88

-

-

... More
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum

2.69

-

-

... More
Reinforcement Concrete 1: 1 .5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed.

2.65

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

0.24

-

-

... More
Provision for Bitument Pad

4.878

-

-

... More
1.50m Span Culvert @ Ch.1/784 m

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation.

70.27

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.

9.06

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

70.24

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification. Centering

-

-

-

... More
Culvert

135.37

-

-

... More
Deck Slab

9.88

-

-

... More
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum

2.69

-

-

... More
Reinforcement Concrete 1: 1 .5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed.

2.65

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

0.24

-

-

... More
Provision for Bitument Pad

4.878

-

-

... More
5.00 m Span Culvert @ Ch.1/508 m

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation.

121.47

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.

15.19

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.

113.06

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification. Centering

-

-

-

... More
Culvert

191.96

-

-

... More
Deck Slab

34.99

-

-

... More
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum

5.31

-

-

... More
Reinforcement Concrete 1: 1 .5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed.

14.96

-

-

... More
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works

2.25

-

-

... More
Provision for Bitument Pad

15.12

-

-

... More
Provision for Weepholes

7.5

-

-

... More
Collection and suply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compation with power roller etc complete

43.55

-

-

... More
Hardbed @ Ch.0/490-0/520 m

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation

46.17

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification

6.16

-

-

... More
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification

36.07

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification

127.53

-

-

... More
Granular Sub-base / base / surface course with local materials (Table 400.13) by mix in place method normal construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at once and compacting with smooth wheel roller to achive the desired density complete as per speficaition

22.78

-

-

... More
WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam speficaition including spreading in uniforms thickness, hard packing , rolling with three wheel 80-100kN static roller in stages to proper grade and camber, spplying and brooming, crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specifacation Clause 405

11.39

-

-

... More
Constuction of Unreinforced Dowel Jointed at Expansion & Consturciton Joint thickness as per Design, Over a preapared sub base with 43 Grade cement M30 grade etc.,

35.04

-

-

... More
Provision of Bitumen Pad

10.757

-

-

... More
Hardbed @ Ch.0/680-0/710 m

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation

46.17

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification

6.16

-

-

... More
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification

36.07

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification

127.53

-

-

... More
Granular Sub-base / base / surface course with local materials (Table 400.13) by mix in place method normal construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at once and compacting with smooth wheel roller to achive the desired density complete as per speficaition

22.78

-

-

... More
WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam speficaition including spreading in uniforms thickness, hard packing , rolling with three wheel 80-100kN static roller in stages to proper grade and camber, spplying and brooming, crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specifacation Clause 405

11.39

-

-

... More
Constuction of Unreinforced Dowel Jointed at Expansion & Consturciton Joint thickness as per Design, Over a preapared sub base with 43 Grade cement M30 grade etc.,

35.04

-

-

... More
Provision of Bitumen Pad

10.757

-

-

... More
Hardbed @ Ch.1/720-1/760 m

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation

69.62

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification

9.28

-

-

... More
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification

52.47

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification

163.8

-

-

... More
Granular Sub-base / base / surface course with local materials (Table 400.13) by mix in place method normal construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at once and compacting with smooth wheel roller to achive the desired density complete as per speficaition

30.58

-

-

... More
WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam speficaition including spreading in uniforms thickness, hard packing , rolling with three wheel 80-100kN static roller in stages to proper grade and camber, spplying and brooming, crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specifacation Clause 405

15.29

-

-

... More
Constuction of Unreinforced Dowel Jointed at Expansion & Consturciton Joint thickness as per Design, Over a preapared sub base with 43 Grade cement M30 grade etc.,

47.04

-

-

... More
Provision of Bitumen Pad

10.757

-

-

... More
Hardbed @ Ch.1/9-1/93 m

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation

53.87

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification

7.18

-

-

... More
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification

40.77

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification

127.8

-

-

... More
Granular Sub-base / base / surface course with local materials (Table 400.13) by mix in place method normal construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at once and compacting with smooth wheel roller to achive the desired density complete as per speficaition

22.78

-

-

... More
WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam speficaition including spreading in uniforms thickness, hard packing , rolling with three wheel 80-100kN static roller in stages to proper grade and camber, spplying and brooming, crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specifacation Clause 405

11.39

-

-

... More
Constuction of Unreinforced Dowel Jointed at Expansion & Consturciton Joint thickness as per Design, Over a preapared sub base with 43 Grade cement M30 grade etc.,

35.04

-

-

... More
Provision of Bitumen Pad

10.757

-

-

... More
Retainingwall @ Ch.1/860 m

-

-

-

... More
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring,strutting and balling out water whereever necessary and refilling the sides of foundation

15

-

-

... More
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification

3

-

-

... More
Cement concrete 1:3:6 [one cement three sand and six jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification

39.95

-

-

... More
Supplying erecting and shuttering including necessarysupports for plane surfaces in foundation and basement and in all floors for slabs and beams complying with standard specification

88.75

-

-

... More
Provision of Name Board

1

-

-

... More
Provision of HM Stone

8

-

-

... More
Provision of KM Stone

2

-

-

... More
Provision of Sign Board

5

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.