National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Jan 2024
Closing Date23 Jan 2024
Tender Amount₹ 6,28,21,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road C

2160

11664

5.4

... More
Construction of Granular sub-base Grade-V 150 mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete Specification Number as per MORTH Rev.V 111,112,401,900).

-

-

-

... More
Road A

1466

2123632

1448.59

... More
Road B

1335

1863379

1395.79

... More
Road C

698

1004973

1439.79

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm. thick in two layers of 125mm each thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to the site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete (Specification Number as per MORTH Rev.V 111,112,406,900).

-

-

-

... More
Road A

2463

4357564

1769.21

... More
Road B

2245

3971876

1769.21

... More
Road C

1184

2094744

1769.21

... More
Providing and laying of prime coat over WBM/WMM surface using 7 kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc, complete Specification Number as per MORTH Rev.V 111,112,502,900)

-

-

-

... More
Road A

9851

744243

75.55

... More
Road B

8979

678453

75.56

... More
Road C

4733

357436

75.52

... More
Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete .Specification Number as per MORTH Rev.V 111,112,503,900).

-

-

-

... More
Road A

9851

167368

16.99

... More
Road B

8979

152553

16.99

... More
Road C

4733

80366

16.98

... More
Providing and laying 50mm consolidated thick Bituminous macadam using 0.2cum of 26.5-13.2mm, 0.43cum of 13.22-2.36mm and 0.08 cum of 2.36mm and blow size IRC metal with 37 kg of VG30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross section and consolidated by 8-10 tone vibrator roller to the require density etc including labour for attending the paver to site, etc including hire charges and fuel charges for 20-30 ton CMP with bitumen boiler, tipper trucks, paver finisher / vibrator roller and all other tools and plants required including fuel and all other incidental charges etc complete as per specification using CMP (Specification Number as per MORTH Rev.V 111,112,504,900).

-

-

-

... More
Road A

493

3880442

7871.08

... More
Road B

449

3537706

7879.08

... More
Road C

237

1863080

7861.1

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 30mm with mechanical paver finisher to the specified grades and cross sections and consolidatedby8-10tonne with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP.(Specification Number as per MORTH Rev.V 111,112,507,900).

-

-

-

... More
Road A

296

3019430

10200.78

... More
Road B

270

2757874

10214.35

... More
Road C

142

1446099

10183.8

... More
Carted earth including cost and conveyance an average lead of 3 km to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for formation of side berms in accordance with standard specifications as per MORT&H Vth rev.304, 305.

-

-

-

... More
Road A

2448

476184

194.52

... More
Road B

2016

392152

194.52

... More
Road C

1218

236925

194.52

... More
Providing R.C.C M-15 grade precast KM stone of standard design as per IRC-8-1980 and fixing in position including painting and printing etc., complete.(as per MORT&H specification No:805)

-

-

-

... More
Road A

2

1812

906

... More
Road B

2

1812

906

... More
Road C

1

906

906

... More
Providing R.C.C M-15 grade precast HM stone of standard design as per IRC-8-1980 and fixing in position including painting and printing etc., complete.(as per MORT&H specification No:805)

-

-

-

... More
Road A

11

2816

256

... More
Road B

10

2560

256

... More
Road C

5

1280

256

... More
Direction and Place Identification signs - Type - IV Providing and erecting direction and place identification Retro - Reflectorised sign made out of high intensity Prismatic Grade Sheeting confiming to TYPE- IV standards of IRC:67-2012 and ASTM D 4956-09, specification and fixed over 2mm thick aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mmm mild steel angle post 75x75x6mm with a clear height of not less than 2.10m from the ground level bottom of the sign board and 0.60 m below ground level . The sign post should be painted as per IRC 67-2012and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmx45cmx60cm size including cost and conveyance of all materail, equipment, machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by engineer in charge. High intensity Retro Reflectro Sheet shall consist of minimmum coefficient of Retro reflection as per table 6.6 of IRC 67- 2012. The Retro-reflective sheeting shall be covered under 7 years warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per of IRC 67:2012 Specification (as per MoRT&H Specification. No.801) for Scheme board (More than 0.90 sqm)

-

-

-

... More
Road A

1.08

12749

11805

... More
Road B

1.08

12749

11805

... More
Road C

1.08

12749

11805

... More
Box Culvert Dismantling the existing RR Masonry in the existing and clearing away from the work site and carefully stacking the usefull materials for re-use on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per MORT&H Vth specification No.202

-

-

-

... More
Road A Km.0/2

22.95

5907

257.4

... More
Dismantling the existing Cut Stone culvert and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per MOR&H Vth specification No.202.

-

-

-

... More
Road A Km.0/2

7.15

3334

466.3

... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT as per MORT&H Vth specification No.304

-

-

-

... More
Road A Km.0/2

60.16

16489

274.1

... More
Plain Cement Concrete M-15 Grade, Nominal Mix, 1:2:4, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of form work, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in depths and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for Leveling course for Box culvert as per MORT&H Vth specification No.1000, 1500, 1700, 2200.

-

-

-

... More
Road A Km.0/2

4.78

27812

5818.57

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork and centering, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Bottom of Slab, Side Walls and Top Slab of Box Culvert as per MORT&H Vth specification No.1000, 1500, 1700, 2200.

-

-

-

... More
Road A Km.0/2

31.53

362146

11485.77

... More
Vibrated Cement Concrete M20 nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Stem of Wing Wall and Parapet over Box Culvert as per MORT&H Vth specification No.1000, 1500, 1700, 2200

-

-

-

... More
Road A Km.0/2

34.27

266264

7769.6

... More
Supply and fabrication of Fe.500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per MORT&H Vth specification No.1600

-

-

-

... More
Road A Km.0/2

2.06

195296

94804.27

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., excluding steel complete for wearing coat of 75mm uniform thickness over deck slab as per MORTH Rev. V Specification No.1000, 1500, 1700, 2702.

-

-

-

... More
Road A Km.0/2

17.16

11902

693.6

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Earth with a lead of 5km for formation of Diversion road for 100% compaction as per MOR&H Vth specification No.111, 112, 304, 305.

-

-

-

... More
Road A Km.0/2

212

41238

194.52

... More
Construction of granular sub - base Gr-V of 150 mm thick by providing close graded Material, mixing in a mechanical mix plantat OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density for Diversion Road complete as per clause 401 (Specification Number as per MORTH Rev.V 111,112,401,900).

-

-

-

... More
Road A Km.0/2

16.88

24452

1448.59

... More
Retaining Wall Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RETAINING WALLS. as per sec.111,112,304 of MORTH specification rev.5

-

-

-

... More
Road A Km.2/2

222

55966

252.1

... More
Road B Km.0/2 & 0/4

167

42100

252.1

... More
Road C Km.0/8 - 1/0

486

122520

252.1

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for FOOTINGS OF RETAINING WALLS. as per sec.1000,1500,1700,2100,2200 of MORTH specification rev.5

-

-

-

... More
Road A Km.2/2

45

271312

6029.17

... More
Road B Km.0/2 & 0/4

34

197970

5822.67

... More
Road C Km.0/8 - 1/0

98

590858

6029.17

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for STEM OF RETAINING WALLS. Below the sill Level as per sec.1000,1500,1700,2200 of MORTH specification rev.5

-

-

-

... More
Road A Km.2/2

122

845279

6928.52

... More
Road B Km.0/2 & 0/4

92

621230

6752.51

... More
Road C Km.0/8 - 1/0

251

1802074

7179.58

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for STEM OF RETAINING WALLS. Above the sill level as per sec.1000,1500,1700,2200 of MORTH specification rev.5

-

-

-

... More
Road A Km.2/2

118

981496

8317.77

... More
Road B Km.0/2 & 0/4

89

724791

8143.73

... More
Road C Km.0/8 - 1/0

164

1379115

8409.24

... More
Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill IN THE ABUTMENTS AND WINGS. as per sec.2706 of MORTH specification rev.5

-

-

-

... More
Road A Km.2/2

86

15265

177.5

... More
Road B Km.0/2 & 0/4

63

11182

177.5

... More
Road C Km.0/8 - 1/0

106

18815

177.5

... More
Vibrated Cement Concrete of Grade M-20, Nominal Mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for Broken Parapet as per sec.1000,1500,1700,2200,2300 of MORTH specification rev.5

-

-

-

... More
Road A Km.2/2

8

86373

10796.68

... More
Road B Km.0/2 & 0/4

6

63541

10590.18

... More
Road C Km.0/8 - 1/0

22

237526

10796.68

... More
CC Pavement Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring, structing, walling and forming protective bunds wherever necessary, etc., complete as per the relevant standard specification for Cut off wall

-

-

-

... More
Road B Km.0/2

17

1904

112.05

... More
Road C Km.0/0 - 0/075

21

2353

112.05

... More
Construction of Granular sub-base Grade-V 150 mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete Specification Number as per MORTH Rev.V 111,112,401,900).

-

-

-

... More
Road B Km.0/2

50

71989

1439.79

... More
Road C Km.0/0 - 0/075

62

89266

1439.79

... More
Cement Concrete of Grade M10 (nominal mix 1:3:6) using 40 mm ISS HBG metal including cost and conveyance all materials to site including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidetal charges etc., complete as per Standard Specification for levelling course below Cement Concrete Pavement.

-

-

-

... More
Road B Km.0/2

33

157139

4761.8

... More
Road C Km.0/0 - 0/075

42

199995

4761.8

... More
Vibrated Cement Concrete of Grade M20 using 40 mm ISS HBG metal including cost and conveyance all materials to site including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidetal charges etc., complete, as per relevant standard specifications for cut off wall.

-

-

-

... More
Road B Km.0/2

35

314442

8984.08

... More
Road C Km.0/0 - 0/075

43

394471

9173.76

... More
Vibrated Cement concrete of M30 Grade (Design mix) using ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site and including labour charges for mixing, transporting, laying, curing concrete, hire charges for tools and plants including all other incidental charges etc., complete as per relevant standard specifications for CC Pavement.

-

-

-

... More
Road B Km.0/2

83

587191

7074.6

... More
Road C Km.0/0 - 0/075

104

755743

7266.76

... More
Supply and fabrication of Steel including cost of steel at site and cost of fabrication labour charges for cleaning the rods, straightening, cutting, bending, tying grills and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire.

-

-

-

... More
Road B Km.0/2

0.49

46454

94804.27

... More
Road C Km.0/0 - 0/075

0.62

58778

94804.27

... More
Providing and fixing of Separable impermeable plastic sheet of thickness 125 micron including sealant including cost and conveyance of all materials to work site and labour charges for fixing etc., complete.

-

-

-

... More
Road B Km.0/2

330

3300

10

... More
Road C Km.0/0 - 0/075

413

4130

10

... More
Providing expansion and contraction joints in both the longitudinal and transverse direction using bituminous pads of 20mm thickness including all cost, conveyance and all labour charges for fixing them in position as per the standard specification.

-

-

-

... More
Road B Km.0/2

32

640

20

... More
Road C Km.0/0 - 0/075

40

800

20

... More
Box Culvert Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT as per MORT&H Vth specification No.304

-

-

-

... More
Road B Km.0/2 & 0/4

120.32

32979

274.1

... More
Plain Cement Concrete M-15 Grade, Nominal Mix, 1:2:4, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of form work, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in depths and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for Leveling course for Box culvert as per MORT&H Vth specification No.1000, 1500, 1700, 2200.

-

-

-

... More
Road B Km.0/2 & 0/4

9.55

53852

5638.96

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork and centering, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Bottom of Slab, Side Walls and Top Slab of Box Culvert as per MORT&H Vth specification No.1000, 1500, 1700, 2200.

-

-

-

... More
Road B Km.0/2 & 0/4

63.06

712967

11306.17

... More
Vibrated Cement Concrete M20 nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Stem of Wing Wall and Parapet over Box Culvert as per MORT&H Vth specification No.1000, 1500, 1700, 2200

-

-

-

... More
Road B Km.0/2 & 0/4

68.54

520217

7589.99

... More
Supply and fabrication of Fe.500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per MORT&H Vth specification No.1600

-

-

-

... More
Road B Km.0/2 & 0/4

4.12

390593

94804.27

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., excluding steel complete for wearing coat of 75mm uniform thickness over deck slab as per MORTH Rev. V Specification No.1000, 1500, 1700, 2702.

-

-

-

... More
Road B Km.0/2 & 0/4

34.32

23334

679.9

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Earth with a lead of 5km for formation of Diversion road for 100% compaction as per MOR&H Vth specification No.111, 112, 304, 305.

-

-

-

... More
Road B Km.0/2 & 0/4

423

82281

194.52

... More
Construction of granular sub - base Gr-V of 150 mm thick by providing close graded Material, mixing in a mechanical mix plantat OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density for Diversion Road complete as per clause 401 (Specification Number as per MORTH Rev.V 111,112,401,900).

-

-

-

... More
Road B Km.0/2 & 0/4

33.75

47107

1395.79

... More
CC Drain Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring strutting, walling and forming protective bunds whereever necessary etc., complete as per relevent standard specification for CC Drain .

-

-

-

... More
Road B Km.0/0 - 0/4

536

60058

112.05

... More
Vibrated Cement Concrete of Grade M-15( Nominal Mix, 1:2:4), using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges such as bailing out water, maintaining of protective bunds,cofferdams,shoring,structing etc; complete as per relevant standard specifications, for Levelling course

-

-

-

... More
Road B Km.0/0 - 0/4

51

287586

5638.96

... More
Vibrated Cement Concrete of Grade M-20 Nominal Mix, 1:2:4), using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges such as bailing out water, maintaining of protective bunds,cofferdams,shoring,structing etc; complete as per relevant standard specifications, for CC DRAIN (Base slab & Side wall)

-

-

-

... More
Road B Km.0/0 - 0/4

203

2350137

11577.03

... More
Vibrated Reinforced Cement Concrete of Grade M-20( Nominal Mix, ), using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges such as bailing out water, maintaining of protective bunds,cofferdams,shoring,structing etc; complete as per relevant standard specifications, for COVER SLAB OF CC SIDE DRAIN

-

-

-

... More
Road B Km.0/0 - 0/4

68

934317

13739.96

... More
Providing and fixing Class I PVC pipes of 110mm dia of required lengths in drain, to drain the water including costs and conveyance of all materials to work site and labour charges for fixing, for drainage arrangement.

-

-

-

... More
Road B Km.0/0 - 0/4

6

1065

177.5

... More
Supplying and Fabrication of steel Fe-500 for all RCC items including cost and conveyance of all materials to site including cost of steel at site including cost of formwork, soft water, labor charges for bending, tying working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for COVER SLAB OF CC SIDE DRAIN

-

-

-

... More
Road B Km.0/0 - 0/4

7.5

711032

94804.27

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

53237308.93

... More
GST 18% for above SubTotal Amount

1

9582715

9582715.61

... More
Total in Figures (SubTotal + GST)

-

62820024

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.