National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Jan 2024
Closing Date23 Jan 2024
Tender Amount₹ 5,58,60,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road C

1980

10692

5.4

... More
Road D

2880

15552

5.4

... More
Road E

1800

9720

5.4

... More
Picking 5cm to 10cm old B.T surface andsectioning and to bring to camber and super elevation as directed by the departmental officers including labour charges for picking including hire charges for all tools and equipments employed and all other incidental charges etc., complete as per standard specification.(Specification Number as per MORTH Rev.V 202)

-

-

-

... More
Road A

1401

27837

19.87

... More
Road B

2085

41428

19.87

... More
Road C

1880

37355

19.87

... More
Road D

1997

39680

19.87

... More
Road E

1280

25433

19.87

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including pre mixing the materials with water at OMC in mechnanical mix plant conveyance of mixed material by tipper to site laying in uniform layers using pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 (Specification Number as per MORTH Rev.V 111,112,406,900).

-

-

-

... More
Road A

1051

1859439

1769.21

... More
Road B

1564

2767044

1769.21

... More
Road C

1410

2494586

1769.21

... More
Road D

1498

2650276

1769.21

... More
Road E

960

1698441

1769.21

... More
Providing and laying prime coat over WBM/WMM surface using 7 kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc, complete as per clause 502 of MORTH Rev.5 .(Specification Number as per MORTH Rev.V 111,112,502,900)

-

-

-

... More
Road A

4201

317049

75.47

... More
Road B

6254

472114

75.49

... More
Road C

5638

425612

75.49

... More
Road D

5991

452140

75.47

... More
Road E

3840

289804

75.47

... More
Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5..(Specification Number as per MORTH Rev.V 111,112,503,900).

-

-

-

... More
Road A

4201

71248

16.96

... More
Road B

6254

106130

16.97

... More
Road C

5638

95676

16.97

... More
Road D

5991

101607

16.96

... More
Road E

3840

65126

16.96

... More
Providing and laying 50mm consolidated thick bituminous macadam using 0.2cum of 26.5-13.2mm, 0.43cum of 13.20-2.36mm and 0.08 cum of 2.36mm and blow size IRC metal with 37 kg of VG30 Grade Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross section and consolidated by 8-10 tone vibrator roller to the require density etc including labour for attending the paver to site, etc including hire charges and fuel charges for 20-30 ton CMP with bitumen boiler, tipper trucks, paver finisher / vibrator roller and all other tools and plants required including fuel and all other incidental charges etc complete as per specification using CMP as per clause 504 of MORTH.Rev.5.(Specification Number as per MORTH Rev.V 111,112,504,900).

-

-

-

... More
Road A

211

1656497

7850.7

... More
Road B

313

2459272

7857.1

... More
Road C

282

2215702

7857.1

... More
Road D

300

2355210

7850.7

... More
Road E

192

1507334

7850.7

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to Paver site, spreading the mix to uniform thickness of 30mm with mechanical paver finisher to the specified grades and cross sections and consolidatedby8-10tonne Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.(Specification Number as per MORTH Rev.V 111,112,507,900).

-

-

-

... More
Road A

127

1291101

10166.15

... More
Road B

188

1913276

10177

... More
Road C

170

1730090

10177

... More
Road D

180

1829907

10166.15

... More
Road E

116

1179273

10166.15

... More
Collection and Supply of Carted earth including cost and conveyance an average lead of 5km to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the engineer with initial lift including all labour charges and consolidation with power roller incliding all tools and plants and all other incidental charges etc., complete for formation of side berms in accordance with standard specification as per MORT&H Rev-5 111,112,408 & 900

-

-

-

... More
Road A

733

162396

221.55

... More
Road B

1958

433794

221.55

... More
Road C

1283

284248

221.55

... More
Road D

1055

233735

221.55

... More
Road E

1010

223765

221.55

... More
Vibrated Cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite including cost of cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, form work, cost of pre moulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over Bridge for as per MORT&H specification No.1000,1500,1700 & 2702 (Road B)

128

87948

687.1

... More
Providing RCC M15 grade precast KM stone of standard design as per IRC 8-1980 and fixing in position including painting and printing etc complete (as per MORT&H specification No.805).

-

-

-

... More
Road A

1

906

906

... More
Road B

1

906

906

... More
Road C

1

906

906

... More
Road D

1

906

906

... More
Road E

1

906

906

... More
Provididing RCC M15 Grade Precast HM stone of standard desing as per IRC 8-1980 and fixing in position including painting and printing ect., complete (as per MORTH SPECIFICATION No.805)

-

-

-

... More
Road A

4

1024

256

... More
Road B

7

1792

256

... More
Road C

6

1536

256

... More
Road D

7

1792

256

... More
Road E

6

1536

256

... More
Provision for Scheme Board Direction and Place Identification signs - Type IV. Providing and erecting Direction and place Identification Retro reflectorised sign made out of high Intensity Prismatic Grade sheeting confirming to type IV standards of IRC - 67: 2012 and ASTM D 4956-09. Specification and fixed over 2 mm thick Aluminium sheet fixed over a back supporting frame of 25mm x 25mm x 3mm Mild steel angel and supported on a mild steel angel post 75 X 75 X 6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painte as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cm X 45cm X 60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro Reflectro sheet shall consist of minimum co efficient of Retro - reflection as per Table 6.6 of IRC67-2012. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67.2012. (as per MORT & H Specification No 801) (For Sign having area more than 0.95qm) TYPE -IV

-

-

-

... More
Road A

1.08

12749

11805

... More
Road B

1.08

12749

11805

... More
Road C

1.08

12749

11805

... More
Road D

1.08

12749

11805

... More
Road E

1.08

12749

11805

... More
SUB ESTIMATE - TWO CELL BOX CULVERT Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT MORT&H No.304,111,112

-

-

-

... More
Road E at Km 1/2

127

34810

274.1

... More
Plain Cement Concrete M-15 Grade, Nominal Mix, 1:2:4, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of form work, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in depths and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for Leveling course for BOX CULVERT MORHT No.1000,1500,1700,2100 & 2200

-

-

-

... More
Road E at Km 1/2

9

51316

5701.87

... More
Vibrated Cement Concrete of grade M-20 Nominal Mix (1:1.5:3) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including form work and centering, using soft water, labour charges for mixing, transporting and placing in position, compacting, finishing and curing, working at depths, hire charges for tools and plants and incidental charges, etc., complete as per standard specifications Stem and Footing of Retaining wall as per MORT&H Specificaton No.1000, 1500, 1700, 2200, 2300

-

-

-

... More
Road E at Km 1/2

53

419437

7913.92

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork and centering, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Bottom of Slab, Side Wall and Top Slab of Box culvert as per MORT&H specification No.1000,1500,1700,2200 & 2300

-

-

-

... More
Road E at Km 1/2

57

611673

10731.12

... More
Supply and fabrication of Fe.500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete, as per MORT&H specification No.1600

-

-

-

... More
Road E at Km 1/2

3.5

331814

94804.27

... More
Vibrated Cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite including cost of cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, form work, cost of pre moulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over Box culvert Top slab for as per MORT&H specification No.1000,1500,1700 & 2702

-

-

-

... More
Road E at Km 1/2

34

23279

684.7

... More
Dismantling the existing Random Rubble Masonry in Cement mortar walls upto 3m hight in the existing culvert and clearing away from the work site and carefully stacking the usefull materials for re-use on the road side as directed by the departmental officers including all labour and incidental charges etc., complete. as per MORTH spec.202,111,112

-

-

-

... More
Road E at Km 1/2

25

6435

257.4

... More
Dismantling the Plain Cement Concrete in the Existing culvert and clearing away from the site and carefully stacking the useful materilas for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., Complete as per MORTH spec.202,111,112

-

-

-

... More
Road E at Km 1/2

23

10166

442

... More
DIVERSION ROAD Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Earth with a lead of 5km for formation of Diversion road for 95% compaction.

-

-

-

... More
Road E at Km 1/2

215

47633

221.55

... More
Construction of Granular sub-base Grade-V 150mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 111,112,401,900

-

-

-

... More
Road E at Km 1/2

23

32103

1395.79

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to the site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111,112,406,900 of MORTH Rev-5

-

-

-

... More
Road E at Km 1/2

23

40691

1769.21

... More
SUB ESTIMATE - SINGLE CELL BOX CULVERT Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT MORT&H No.304,111,112

-

-

-

... More
Road B at Km 1/2(i),(ii)

188

51530

274.1

... More
Road C at Km 1/2(i),(ii),(iii)

282

77296

274.1

... More
Road D at Km 1/4

94

25765

274.1

... More
Road E at Km 0/4 & 0/6

188

51530

274.1

... More
Plain Cement Concrete M-15 Grade, Nominal Mix, 1:2:4, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of form work, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in depths and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for Leveling course MORHT No.1000,1500,1700,2100 & 2200

-

-

-

... More
Road B at Km 1/2(i),(ii)

10

57490

5749.05

... More
Road C at Km 1/2(i),(ii),(iii)

15

86471

5764.78

... More
Road D at Km 1/4

5

28509

5701.87

... More
Road E at Km 0/4 & 0/6

10

56861

5686.14

... More
Vibrated Cement Concrete of grade M-20 Nominal Mix (1:1.5:3) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including form work and centering, using soft water, labour charges for mixing, transporting and placing in position, compacting, finishing and curing, working at depths, hire charges for tools and plants and incidental charges, etc., complete as per standard specifications Stem and Footing of Retainng Wall as per MORT&H Specificaton No.1000, 1500, 1700, 2200, 2300

-

-

-

... More
Road B at Km 1/2(i),(ii)

97

758746

7822.13

... More
Road C at Km 1/2(i),(ii),(iii)

145

1136488

7837.85

... More
Road D at Km 1/4

49

380976

7775.03

... More
Road E at Km 0/4 & 0/6

97

752634

7759.12

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork and centering, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Bottom of Slab, Side Wall and Top Slab of Box culvert as per MORT&H specification No.1000,1500,1700,2200 & 2300

-

-

-

... More
Road B at Km 1/2(i),(ii)

64

730527

11414.49

... More
Road C at Km 1/2(i),(ii),(iii)

95

1085870

11430.22

... More
Road D at Km 1/4

32

363753

11367.31

... More
Road E at Km 0/4 & 0/6

64

726501

11351.58

... More
Supply and fabrication of Fe.500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete, as per MORT&H specification No.1600

-

-

-

... More
Road B at Km 1/2(i),(ii)

4.2

398177

94804.27

... More
Road C at Km 1/2(i),(ii),(iii)

6.3

597266

94804.27

... More
Road D at Km 1/4

2.1

199088

94804.27

... More
Road E at Km 0/4 & 0/6

4.2

398177

94804.27

... More
Vibrated Cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite including cost of cement at site including all labour charges for mixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, form work, cost of pre moulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over Box culvert Top slab for as per MORT&H specification No.1000,1500,1700 & 2702

-

-

-

... More
Road B at Km 1/2(i),(ii)

35

24090

688.3

... More
Road C at Km 1/2(i),(ii),(iii)

52

35854

689.5

... More
Road D at Km 1/4

18

12324

684.7

... More
Road E at Km 0/4 & 0/6

35

23922

683.5

... More
Dismantling the existing Random Ruble Masonry in Cement mortar walls upto 3m hight in the existing culvert and clearing away from the work site and carefully stacking the usefull materials for re-use on the road side as directed by the departmental officers including all labour and incidental charges etc., complete. as per MORTH spec.202,111,112

-

-

-

... More
Road D at Km 1/4

14.5

3732

257.4

... More
Road E at Km 0/4 & 0/6

29

7464

257.4

... More
Dismantling the existing Cut stone slab over culvert upto 3.3mt in the existing culvert and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc. complete . as per MORTH spec.202,111,112

-

-

-

... More
Road D at Km 1/4

13

6061

466.3

... More
Road E at Km 0/4 & 0/6

25

11657

466.3

... More
Dismantling the Plain Cement Concrete in the Existing culvert and clearing away from the site and carefully stacking the useful materilas for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., Complete as per MORTH spec.202,111,112

-

-

-

... More
Road B at Km 1/2(i),(ii)

13

5746

442

... More
Road C at Km 1/2(i),(ii),(iii)

41

18122

442

... More
Road D at Km 1/4

4.5

1989

442

... More
Road E at Km 0/4 & 0/6

9

3978

442

... More
DIVERSION ROAD Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Earth with a lead of 5km for formation of Diversion road for 95% compaction.

-

-

-

... More
Road B at Km 1/2(i),(ii)

323

71560

221.55

... More
Road C at Km 1/2(i),(ii),(iii)

484

107230

221.55

... More
Road D at Km 1/4

162

35891

221.55

... More
Road E at Km 0/4 & 0/6

323

71560

221.55

... More
Construction of Granular sub-base Grade-V 150mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 111,112,401,900

-

-

-

... More
Road B at Km 1/2(i),(ii)

34

48055

1413.39

... More
Road C at Km 1/2(i),(ii),(iii)

51

72531

1422.19

... More
Road D at Km 1/4

17

23803

1400.19

... More
Road E at Km 0/4 & 0/6

34

47456

1395.79

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to the site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111,112,406,900 of MORTH Rev-5

-

-

-

... More
Road B at Km 1/2(i),(ii)

34

60153

1769.21

... More
Road C at Km 1/2(i),(ii),(iii)

51

90229

1769.21

... More
Road D at Km 1/4

17

30076

1769.21

... More
Road E at Km 0/4 & 0/6

34

60153

1769.21

... More
SUB ESTIMATE - PCC RETAINING WALL (Road C At Km 1/0) Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification 111,112,304 for FOUNDATION OF RETAINING WALL

140

35294

252.1

... More
Vibrated Cement Concrete M20 nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for as per relevent standard specification for Footing of retaining walls MORTH No.1000,1500,1700,2100 & 2200

35

208197

5948.49

... More
Vibrated Cement Concrete M20 nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for as per relevent standard specification for Stem of retaining walls MORTH No.1000,1500,1700,2100 & 2200

124

995675

8029.64

... More
Providing and fixing PVC seepage pipes of 100mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing, etc. complete to drain the backfill in between abutment and wings MORHT No.2706

63

11182

177.5

... More
SUB ESTIMATE - PCC PARAPET WALL Vibrated Cement Concrete M20 nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for as per relevent standard specification for Parapet wall MORHT No.1000,1500,1700 & 2200

-

-

-

... More
Road C at Km 0/2

12

119397

9949.8

... More
Road E at Km 0/4 & 0/6

4.5

40403

8978.57

... More
SUB ESTIMATE - Wearing Coat Over Existing Road Vibrated Cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite including cost of cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, form work, cost of pre moulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over Existing Road for as per MORT&H specification No.1000,1500,1700 & 2702

-

-

-

... More
Road E at Km 1/4

2550

1745985

684.7

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

47338191.78

... More
GST 18% for above SubTotal Amount

1

8520874

8520874.52

... More
Total in Figures (SubTotal + GST)

-

55859066

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.