National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Eprocure
Opening Date13 Nov 2019
Closing Date13 Dec 2019
Tender Amount₹ 12,85,15,178 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road - D

10560

-

3.9

... More
Road - E

6840

-

3.9

... More
Picking the existing BT surface, leveling and sectioning in accordance with specifications and as directed by the Engineer as per MORTH Vth Revision 111, 112, 202, 305.4.3, 501

-

-

-

... More
Road - A

4119

-

12.99

... More
Road - B

3969

-

12.99

... More
Road - C

7568.19

-

12.99

... More
Road - D

5745

-

12.99

... More
Road - E

3636

-

12.99

... More
Road - F

4104.87

-

12.99

... More
Road - G

2548.05

-

12.99

... More
Providing and laying granular Sub-base as per table No.400-1/400-2 and Grading V of MORT&H Revision V with and any other Granular Material or a combination those of for required thick to give a CBR of 30 on prepared sub-grade in accordance with the requirements of the specification as per MORTH Vth Revision 111, 112, 401, 900

-

-

-

... More
Road - A

681

-

1415.9

... More
Road - B

3.09

-

1402.7

... More
Road - C

20.11

-

1437.9

... More
Road - D

2.48

-

1459.9

... More
Road - E

399.44

-

1455.5

... More
Road - F

6.08

-

1459.9

... More
Road - G

3

-

1415.9

... More
Providing and laying, spreading and compacting graded stone aggregate Wet mix macadam specification including pre-mixing the material with water at OMC in base mix plant (Pugmill) carriage of mixed material by tipper to site and laying in uniform layers in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MORTH Vth Revision 111, 112, 406, 900

-

-

-

... More
Road - A

3099

-

1627.33

... More
Road - B

2762

-

1627.33

... More
Road - C

5683.91

-

1627.33

... More
Road - D

4092

-

1627.33

... More
Road - E

2731

-

1627.33

... More
Road - F

1862.38

-

1627.33

... More
Road - G

1152.61

-

1627.33

... More
Providing and laying of Prime coat using Emulsion bitumen (SS1 Type) at the rate of 7Kg/10 Sqm. over the WMM surface preparatory to another bituminous construction over it as per MORTH Vth Revision 111, 112, 501, 502, 900

-

-

-

... More
Road - A

12356

-

62.47

... More
Road - B

11907

-

62.47

... More
Road - C

22704.58

-

62.46

... More
Road - D

17233

-

62.47

... More
Road - E

10907

-

62.46

... More
Road - F

12314.6

-

62.45

... More
Road - G

7644.14

-

62.46

... More
Providing and laying of tack coat using Emulsion bitumen (RS1 Type) at the rate of 2.50 Kg./ 10 Sqm. over the Primed surface preparatory to another bituminous construction over it as per MORTH Vth Revision 111, 112, 501, 503, 900

-

-

-

... More
Road - A

12356

-

12.35

... More
Road - B

11907

-

12.35

... More
Road - C

22704.58

-

12.35

... More
Road - D

17233

-

12.35

... More
Road - E

10907

-

12.35

... More
Road - F

12314.6

-

12.34

... More
Road - G

7644.14

-

12.35

... More
Providing and laying of tack coat using Emulsion bitumen (RS1 Type) at the rate of 2.00 Kg./ 10 Sqm. over the s existing BT surface preparatory to another bituminous construction over it as per MORTH Vth Revision 111, 112, 501, 503, 900

-

-

-

... More
Road - F

34.51

-

17.12

... More
Bituminous macadam of 50mm thickness which work shall consist of construction, in a single course of compacted crushed aggregates premixed with bituminous binder 60/70 grade bulk bitumen which will be procurred by the Contractor at the rate of 3.5 percent by weight of the total mix, to serve as base / binder couse, in accordance with the requirement of the specifications and in conformity with the drawing or as directed by the Engineer using approved CMP and paver finisher as per MORTH Vth Revision 111, 112, 501, 504, 900.

-

-

-

... More
Road - A

618

-

6324.72

... More
Road - B

596

-

6324.72

... More
Road - C

1135.23

-

6324.72

... More
Road - D

862

-

6324.72

... More
Road - E

546

-

6324.72

... More
Road - F

617.47

-

6324.72

... More
Road - G

382.2

-

6324.72

... More
Providing and laying 30 mm thick compacted Bituminous Concrete which shall consist of construction of a single course binder / wearing course on a previously prepared bituminous base to the requirements of the specification using 60/70 Grade bitumen as per MORTH Vth Revision 111, 112, 512, 900

-

-

-

... More
Road - A

371

-

8233.18

... More
Road - B

358

-

8233.18

... More
Road - C

681.14

-

8233.18

... More
Road - D

517

-

8233.18

... More
Road - E

327.3

-

8233.18

... More
Road - F

370.47

-

8233.18

... More
Road - G

229.33

-

8233.18

... More
Collection and supply of carted earth including excavation, removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for Berms with an average lead of 5 Km. as per MORTH Vth Revision 111, 112, 202, 301, 302, 303, 305, 900

-

-

-

... More
Road - A

6829

-

141.09

... More
Road - B

7808

-

141.09

... More
Road - C

12907

-

141.09

... More
Road - D

8887

-

141.09

... More
Road - E

6956

-

141.09

... More
Road - F

5246

-

141.09

... More
Road - G

3103

-

141.09

... More
Providing R.C.C M15 grade Precast KM Stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc complete as per MORTH Vth specification No.804

-

-

-

... More
Road - A

3

-

906

... More
Road - B

3

-

906

... More
Road - C

6

-

906

... More
Road - D

4

-

906

... More
Road - E

2

-

906

... More
Road - F

3

-

906

... More
Road - G

2

-

906

... More
Providing R.C.C M15 grade Precast HM Stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc complete as per MORTH Vth Revision 804

-

-

-

... More
Road - A

13

-

256

... More
Road - B

12

-

256

... More
Road - C

24

-

256

... More
Road - D

18

-

256

... More
Road - E

12

-

256

... More
Road - F

12

-

256

... More
Road - G

8

-

256

... More
FOR CROSS DRAINAGE WORKS- SINGLE ROW PIPE CULVERT

-

-

-

... More
Dismantling the RR masonry salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc., complete as per MORTH Vth Revision 111,112,202

-

-

-

... More
Road - A

24.96

-

168

... More
Road - C

37.44

-

168

... More
Road - F

18.72

-

168

... More
Road - G

12.48

-

168

... More
Dismantling the RCC pipes removal and disposing of resulting materials and back filling the resulting trenches and pits etc., complete as directed by the Engineer-in-charge

-

-

-

... More
Road - A

30

-

100

... More
Road - C

45

-

100

... More
Road - F

22.5

-

100

... More
Road - G

15

-

100

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION as per MORTH Vth Revision 304.

-

-

-

... More
Road - A

100.8

-

146.2

... More
Road - C

151.2

-

146.2

... More
Road - F

75.6

-

146.2

... More
Road - G

50.4

-

146.2

... More
Cement concrete M15 Grade Nominal mix (1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for FOUNDATION OF BODY WALL (Levelling course) as per MORTH Vth 1000, 1500, 1700, 2100.

-

-

-

... More
Road - A

15.36

-

4611.78

... More
Road - C

23.04

-

4550.17

... More
Road - F

11.52

-

4559.38

... More
Road - G

7.68

-

4497.01

... More
Vibrated cement concrete M15 Grade Nominal mix (1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for FOUNDATION OF BODY WALL & CULVERT (Below Sill level) as per MORTH Vth 1000, 1500, 1700, 2100.

-

-

-

... More
Road - A

38.4

-

5797.76

... More
Road - C

57.6

-

5736.15

... More
Road - F

28.8

-

5745.35

... More
Road - G

19.2

-

5682.97

... More
Vibrated cement concrete M15 Grade Nominal mix (1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for BODY WALL OF CULVERT (Above sill level) as per MORTH Vth Revision 1000, 1500, 1700, 2100.

-

-

-

... More
Road - A

60.48

-

7344.74

... More
Road - C

90.72

-

7283.33

... More
Road - F

45.36

-

7292.99

... More
Road - G

30.24

-

7230.49

... More
Supply of NP3 Class 1000mm dia R.C.C Pipes to suit the respective diametre of pipes confirming to IS Specifications 458 to various diametre of pipes including cost of Pipes inclusive of all taxes, loading, unloading conveyance and delivery at road site as directed by the departmental officers, including all other incidental charges etc, complete including Hoisting and Fixing the pipe in position as per MORTH Vth 2900

-

-

-

... More
Road - A

40

-

3897

... More
Road - C

60

-

3897

... More
Road - F

30

-

3897

... More
Road - G

20

-

3897

... More
Filling with STONE DUST including cost and conveyance of STONE DUST to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete as per MORTH Vth Revision 304

-

-

-

... More
Road - A

31.92

-

231.48

... More
Road - C

47.88

-

224

... More
Road - F

23.94

-

250

... More
Road - G

15.96

-

187.47

... More
FOR CROSS DRAINAGE WORKS - DOUBLE ROW PIPE CULVERT

-

-

-

... More
Dismantaling the RR masonry salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc., complete as per MORTH Vth Revision 111,112,202

-

-

-

... More
Road - B

12.48

-

168

... More
Road - C

46.8

-

168

... More
Road - D

12.48

-

168

... More
Road - E

24.96

-

168

... More
Road - F

12.48

-

168

... More
Dismantling the RCC pipes removal and disposing of resulting materials and back filling the resulting trenches and pits etc., complete as directed by the Engineer-in-charge.

-

-

-

... More
Road - B

15

-

100

... More
Road - D

15

-

100

... More
Road - E

30

-

100

... More
Road - F

15

-

100

... More
Dismantling the cut stone slab salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc., complete as per MORTH Vth Revision 111,112,202

-

-

-

... More
Road - C

12.84

-

700

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION as per MORTH Vth Revision 304.

-

-

-

... More
Road - B

37.58

-

146.2

... More
Road - C

112.74

-

146.2

... More
Road - D

37.58

-

146.2

... More
Road - E

75.16

-

146.2

... More
Road - F

37.58

-

146.2

... More
Cement concrete M15 Grade Nominal mix (1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for FOUNDATION OF BODY WALL (Levelling course) as per MORTH Vth 1000, 1500, 1700, 2100.

-

-

-

... More
Road - B

5.04

-

4641

... More
Road - C

15.12

-

4534.66

... More
Road - D

5.04

-

4584

... More
Road - E

10.08

-

4534.03

... More
Road - F

5.04

-

4544

... More
Vibrated cement concrete M15 Grade Nominal mix (1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for FOUNDATION OF BODY WALL & CULVERT (Below Sill level) as per MORTH Vth 1000, 1500, 1700, 2100.

-

-

-

... More
Road - B

12.6

-

5782

... More
Road - C

37.8

-

5676.01

... More
Road - D

12.6

-

5725

... More
Road - E

25.2

-

5675

... More
Road - F

12.6

-

5685

... More
Vibrated cement concrete M15 Grade Nominal mix (1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for BODY WALL OF CULVERT (Above sill level) as per MORTH Vth Revision 1000, 1500, 1700, 2100.

-

-

-

... More
Road - B

18.75

-

7491

... More
Road - C

56.25

-

7384.34

... More
Road - D

18.75

-

7434

... More
Road - E

37.5

-

7384.03

... More
Road - F

18.75

-

7394

... More
Supply of NP3 Class 1000mm dia R.C.C Pipes to suit the respective diametre of pipes confirming to IS Specifications 458 to various diametre of pipes including cost of Pipes inclusive of all taxes, loading, unloading conveyance and delivery at road site as directed by the departmental officers, including all other incidental charges etc, complete including Hoisting and Fixing the pipe in position as per MORTH Vth 2900

-

-

-

... More
Road - B

20

-

3897

... More
Road - C

60

-

3897

... More
Road - D

20

-

3897

... More
Road - E

40

-

3897

... More
Road - F

20

-

3897

... More
Filling with STONE DUST including cost and conveyance of STONE DUST to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete as per MORTH Vth Revision 304

-

-

-

... More
Road - B

17.06

-

260

... More
Road - C

51.18

-

215.67

... More
Road - D

17.06

-

242

... More
Road - E

34.12

-

239.01

... More
Road - F

17.06

-

242

... More
CONSTRUCTION OF RETAINING WALL

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION as per MORTH Vth Revision 304

-

-

-

... More
Road - B

350.63

-

146.2

... More
Road - G

99

-

146.2

... More
Cement concrete M15 Grade Nominal mix (1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for FOUNDATION OF RETAINING WALL (Levelling course) as per MORTH V 1000, 1500, 1700, 2100.

-

-

-

... More
Road - B

84.15

-

4641

... More
Road - G

11

-

4491

... More
Vibrated cement concrete M15 Grade Nominal mix (1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for FOUNDATION RETAINING WALL (Below Sill level) as per MORTH Vth 1000, 1500, 1700, 2100.

-

-

-

... More
Road - B

107.78

-

5486

... More
Road - G

65

-

5180

... More
Vibrated cement concrete M15 Grade Nominal mix (1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidental charges etc., complete as per relevant specification for BODY WALL OF RETAINING WALL (Above sill level) as per MORTH Vth Revision 1000, 1500, 1700, 2100.

-

-

-

... More
Road - B

199.76

-

6628

... More
Road - G

152.13

-

6153

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., to drain of the backfill as per MORTH V 2700

-

-

-

... More
Road - B

110

-

172.8

... More
Road - G

50

-

172.8

... More
Refilling the excavated earth complying with the standard specification for filling in the foundation trench includin labour charges etc., complete as per MORTH Vth Revision 304

-

-

-

... More
Road - B

348.43

-

25.5

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

-

... More
GST 12% for above SubTotal Amount

1

-

-

... More
Total in Figures (SubTotal + GST)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.