National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Jan 2024
Closing Date23 Jan 2024
Tender Amount₹ 6,39,48,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road C

3960

21384

5.4

... More
Road D

1854

10011

5.4

... More
Picking 5cm to 10cm old B.T surface and sectioning and to bring to camber and super elevation as directed by the departmental officers including labour charges for picking including hire charges for all tools and equipments employed and all other incidental charges etc., complete as per standard specification MORTH Rev.V 202.

-

-

-

... More
Road A

3200

63584

19.87

... More
Road B

2028

40296

19.87

... More
Road C

2844

56510

19.87

... More
Road D

1297

25771

19.87

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 (Specification Number as per MORT&H Rev.V 111,112,406,900)

-

-

-

... More
Road A

2400

4283040

1784.6

... More
Road B

1521

2714376

1784.6

... More
Road C

2133

3806551

1784.6

... More
Road D

973

1721441

1769.21

... More
Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for pre paratory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,502,900)

-

-

-

... More
Road A

9599

724244

75.45

... More
Road B

6084

459159

75.47

... More
Road C

8530

643673

75.46

... More
Road D

3891

293614

75.46

... More
Providing and laying Tack Coat over primed surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction overit including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,503,900)

-

-

-

... More
Road A

9599

162703

16.95

... More
Road B

6084

103184

16.96

... More
Road C

8530

144668

16.96

... More
Road D

3891

65991

16.96

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,504,900)

-

-

-

... More
Road A

480

3774364

7863.26

... More
Road B

305

2398294

7863.26

... More
Road C

427

3357612

7863.26

... More
Road D

195

1529720

7844.72

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 (Specification Number as per MORT&H Rev.V 111,112,507,900)

-

-

-

... More
Road A

288

2930595

10175.68

... More
Road B

183

1862149

10175.68

... More
Road C

256

2604974

10175.68

... More
Road D

117

1188246

10155.95

... More
Carted earth including cost and conveyance an average lead of 3 km to worksite and stackong them on road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for formation of side Berms in accordance with standard Specifications as per MORT&H Vth Rev., 111, 112 408 &900.

-

-

-

... More
Road A

2763

462774

167.49

... More
Road B

1577

264131

167.49

... More
Road C

2170

363453

167.49

... More
Road D

1020

170839

167.49

... More
Providing RCC M15 Grade Precast HM stone of standard design as per IRC 8-1980 and fixing in position including painting and Lettering etc., complete (as per MORTH SPECIFICATION No.805)

-

-

-

... More
Road A

11

2816

256

... More
Road B

7

1792

256

... More
Road C

10

2560

256

... More
Road D

5

1280

256

... More
Providing RCC M15 Grade Precast KM stone of standard design as per IRC 8-1980 and fixing in position including painting and Lettering ect., complete (as per MORTH SPECIFICATION No.805)

-

-

-

... More
Road A

2

1812

906

... More
Road B

1

906

906

... More
Road C

2

1812

906

... More
Road D

1

906

906

... More
Providing and erecting of Direction and Place Identification Retro-reflectorised Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 -09, specification and fixed over 2mm thickAluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012. (as per MORT&H Specification No.801) (For sign having area more than 0.9sq.m) Type-IV

-

-

-

... More
Road A

1.08

12749

11805

... More
Road B

1.08

12749

11805

... More
Road C

1.08

12749

11805

... More
Road D

1.08

12749

11805

... More
SUB ESTIMATE - Box Culvert Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of BOx Culvert (Specification No.111,112,304.)

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/2 , Km 0/4 , Km 0/6 & Km1/0.

316

86615

274.1

... More
Road A - Single Cell 2x2 at Km 2/5

79

21653

274.1

... More
Road B - Single Cell 2x2 at Km 0/2 & Km 0/4

158

43307

274.1

... More
Road B - Single Cell 2x2 at Km 0/6

79

21653

274.1

... More
Road C - Single Cell 2x2 at Km 0/4

79

21653

274.1

... More
Road C - Single Cell 2x2 at Km 0/8 & Km 1/2

158

43307

274.1

... More
Road C - Single Cell 2x2 at Km 1/8 ,Km 2/2 (i), Km 2/2 (ii),Km 2/2 (iii)

316

86615

274.1

... More
Plain Cement Concrete M15 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants etc. Complete for Levelling Course for Box Culvert as per MORTH Rev. V Specification No. 1000,1500,1700,2100,2200

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/2 , Km 0/4 , Km 0/6 & Km1/0.

20

112464

5623.23

... More
Road A - Single Cell 2x2 at Km 2/5

5

27723

5544.69

... More
Road B - Single Cell 2x2 at Km 0/2 & Km 0/4

10

57176

5717.6

... More
Road B - Single Cell 2x2 at Km 0/6

5

28666

5733.33

... More
Road C - Single Cell 2x2 at Km 0/4

5

28509

5701.87

... More
Road C - Single Cell 2x2 at Km 0/8 & Km 1/2

10

57176

5717.6

... More
Road C - Single Cell 2x2 at Km 1/8 ,Km 2/2 (i), Km 2/2 (ii),Km 2/2 (iii)

20

114666

5733.33

... More
Vibrated Cement Concrete M20 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including all other incidental charges etc for Retaining wall as per MORTH Rev. V Specification No.1000, 1500, 1700, 2200,2300

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/2 , Km 0/4 , Km 0/6 & Km1/0.

31

180015

5806.95

... More
Road A - Single Cell 2x2 at Km 2/5

8

45237

5654.69

... More
Road B - Single Cell 2x2 at Km 0/2 & Km 0/4

16

92540

5783.8

... More
Road B - Single Cell 2x2 at Km 0/6

8

46396

5799.53

... More
Road C - Single Cell 2x2 at Km 0/4

8

46173

5771.67

... More
Road C - Single Cell 2x2 at Km 0/8 & Km 1/2

16

92598

5787.4

... More
Road C - Single Cell 2x2 at Km 1/8 ,Km 2/2 (i), Km 2/2 (ii),Km 2/2 (iii)

31

183428

5917.04

... More
Vibrated Cement Concrete M20 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including all other incidental charges etc for Parapet Wall as per MORTH Rev. V Specification No.1000, 1500, 1700, 2200,2300

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/2 , Km 0/4 , Km 0/6 & Km1/0.

107

864078

8075.5

... More
Road A - Single Cell 2x2 at Km 2/5

27

218984

8110.54

... More
Road B - Single Cell 2x2 at Km 0/2 & Km 0/4

54

441317

8172.55

... More
Road B - Single Cell 2x2 at Km 0/6

27

221083

8188.28

... More
Road C - Single Cell 2x2 at Km 0/4

27

220234

8156.82

... More
Road C - Single Cell 2x2 at Km 0/8 & Km 1/2

54

441317

8172.55

... More
Road C - Single Cell 2x2 at Km 1/8 ,Km 2/2 (i), Km 2/2 (ii),Km 2/2 (iii)

107

876145

8188.28

... More
Vibrated Reinforced Cement concrete in M25 using 20mm and below ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete for Base slab Side wall & Deck slab of CELL BOX as per MORTH Rev. V Specification No. 1000,1500,1700,2200,2300

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/2 , Km 0/4 , Km 0/6 & Km1/0.

127

1433636

11288.48

... More
Road A - Single Cell 2x2 at Km 2/5

32

362238

11319.94

... More
Road B - Single Cell 2x2 at Km 0/2 & Km 0/4

64

728439

11381.86

... More
Road B - Single Cell 2x2 at Km 0/6

32

364722

11397.58

... More
Road C - Single Cell 2x2 at Km 0/4

32

363716

11366.13

... More
Road C - Single Cell 2x2 at Km 0/8 & Km 1/2

64

728439

11381.86

... More
Road C - Single Cell 2x2 at Km 1/8 ,Km 2/2 (i), Km 2/2 (ii),Km 2/2 (iii)

127

1447492

11397.58

... More
Supply and fabrication of steel grade Fe-500D steel required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and palcing the reinforcement in position as specified in the drawings including cost of binding wire, provision for spacing bars, cover blocks and all other incidental charges etc., complete as per per MORTH Rev. V specifications No.1600.

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/2 , Km 0/4 , Km 0/6 & Km1/0.

9

853238

94804.27

... More
Road A - Single Cell 2x2 at Km 2/5

2.1

199088

94804.27

... More
Road B - Single Cell 2x2 at Km 0/2 & Km 0/4

4.2

398177

94804.27

... More
Road B - Single Cell 2x2 at Km 0/6

2.1

199088

94804.27

... More
Road C - Single Cell 2x2 at Km 0/4

2.1

199088

94804.27

... More
Road C - Single Cell 2x2 at Km 0/8 & Km 1/2

4.2

398177

94804.27

... More
Road C - Single Cell 2x2 at Km 1/8 ,Km 2/2 (i), Km 2/2 (ii),Km 2/2 (iii)

9

853238

94804.27

... More
Vibrated cement Concrete M30 design mix using 20mm and below ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for mixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., excluding steel complete for wearing coat of 75mm uniform thickness over deck slab as per MORTH Rev. V Specification No.1000, 1500, 1700, 2702.

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/2 , Km 0/4 , Km 0/6 & Km1/0.

69

46830

678.7

... More
Road A - Single Cell 2x2 at Km 2/5

18

12259

681.1

... More
Road B - Single Cell 2x2 at Km 0/2 & Km 0/4

35

24006

685.9

... More
Road B - Single Cell 2x2 at Km 0/6

18

12367

687.1

... More
Road C - Single Cell 2x2 at Km 0/4

18

12324

684.7

... More
Road C - Single Cell 2x2 at Km 0/8 & Km 1/2

35

24006

685.9

... More
Road C - Single Cell 2x2 at Km 1/8 ,Km 2/2 (i), Km 2/2 (ii),Km 2/2 (iii)

69

47409

687.1

... More
Dismantling the existing Stone masonry in the existing damaged pipe culvert and clearing aways from the work site and carefully stacking the usefull material for reuse on the road side departmental officer including all labour and incidental charges etc.,complete, (Specification No.111,112,202.)

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/2 , Km 0/4 , Km 0/6 & Km1/0.

52

13384

257.4

... More
Road A - Single Cell 2x2 at Km 2/5

13

3346

257.4

... More
Road B - Single Cell 2x2 at Km 0/2 & Km 0/4

26

6692

257.4

... More
Road B - Single Cell 2x2 at Km 0/6

13

3346

257.4

... More
Road C - Single Cell 2x2 at Km 0/4

13

3346

257.4

... More
Road C - Single Cell 2x2 at Km 0/8 & Km 1/2

26

6692

257.4

... More
Road C - Single Cell 2x2 at Km 1/8 ,Km 2/2 (i), Km 2/2 (ii),Km 2/2 (iii)

52

13384

257.4

... More
Carted earth with lead of including cost of Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. for Diversion road. (Specification Number as per MORT&H Rev.V 304,305)

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/2 , Km 0/4 , Km 0/6 & Km1/0.

645

108031

167.49

... More
Road A - Single Cell 2x2 at Km 2/5

103

17251

167.49

... More
Road B - Single Cell 2x2 at Km 0/2 & Km 0/4

206

34502

167.49

... More
Road B - Single Cell 2x2 at Km 0/6

103

17251

167.49

... More
Road C - Single Cell 2x2 at Km 0/4

103

17251

167.49

... More
Road C - Single Cell 2x2 at Km 0/8 & Km 1/2

206

34502

167.49

... More
Road C - Single Cell 2x2 at Km 1/8 ,Km 2/2 (i), Km 2/2 (ii),Km 2/2 (iii)

411

68838

167.49

... More
Construction of Granular Sub-Base Grade V of 200mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (Specification Number as per MORT&H Rev.V 111,112,401,900) for Diversion road.

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/2 , Km 0/4 , Km 0/6 & Km1/0.

68

103301

1519.14

... More
Road A - Single Cell 2x2 at Km 2/5

17

25825

1519.14

... More
Road B - Single Cell 2x2 at Km 0/2 & Km 0/4

34

48410

1423.85

... More
Road B - Single Cell 2x2 at Km 0/6

17

24205

1423.85

... More
Road C - Single Cell 2x2 at Km 0/4

17

24504

1441.45

... More
Road C - Single Cell 2x2 at Km 0/8 & Km 1/2

34

49009

1441.45

... More
Road C - Single Cell 2x2 at Km 1/8 ,Km 2/2 (i), Km 2/2 (ii),Km 2/2 (iii)

68

98018

1441.45

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam , including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 (Specification Number as per MORT&H Rev.V 111,112,406,900)

-

-

-

... More
Road A - Single Cell 2x2 at Km 0/2 , Km 0/4 , Km 0/6 & Km1/0.

68

121352

1784.6

... More
Road A - Single Cell 2x2 at Km 2/5

17

30338

1784.6

... More
Road B - Single Cell 2x2 at Km 0/2 & Km 0/4

34

60676

1784.6

... More
Road B - Single Cell 2x2 at Km 0/6

17

30338

1784.6

... More
Road C - Single Cell 2x2 at Km 0/4

17

30338

1784.6

... More
Road C - Single Cell 2x2 at Km 0/8 & Km 1/2

34

60676

1784.6

... More
Road C - Single Cell 2x2 at Km 1/8 ,Km 2/2 (i), Km 2/2 (ii),Km 2/2 (iii)

113

201659

1784.6

... More
SUB ESTIMATE - PCC Retaining wall Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of BOx Culvert (Specification No.111,112,304.)

-

-

-

... More
Road B - Km 0/6

90

22689

252.1

... More
Road C - Km 1/2

118

29747

252.1

... More
Road D - Km 0/6

195

49159

252.1

... More
Vibrated Cement Concrete M20 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including all other incidental charges etc for Footing of Retaining wall as per MORTH Rev. V Specification No.1000, 1500, 1700, 2200,2300

-

-

-

... More
Road B - Km 0/6

18

106506

5917.04

... More
Road C - Km 1/2

24

141631

5901.31

... More
Road D - Km 0/6

39

227697

5838.4

... More
Vibrated Cement Concrete M20 grade (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including all other incidental charges etc for Stem of Retaining wall and Parapet as per MORTH Rev. V Specification No.1000, 1500, 1700, 2200,2300

-

-

-

... More
Road B - Km 0/6

73

566783

7764.16

... More
Road C - Km 1/2

98

761366

7769.05

... More
Road D - Km 0/6

161

1236069

7677.45

... More
Providing and fixing PVC Seepage Pipes of 100mm dia at 1.00m c/c staggered of required lengths for abutments and return walls including cost and conveyance of all materials to work site and labour charges for fixing etc., complete to drain of the backfill as per MORTH Rev. V Specification No.2706

-

-

-

... More
Road B - Km 0/6

17

3017

177.5

... More
Road C - Km 1/2

23

4082

177.5

... More
Road D - Km 0/6

38

6745

177.5

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

54192806.68

... More
GST 18% for above SubTotal Amount

1

9754705

9754705.2

... More
Total in Figures (SubTotal + GST)

-

63947511

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.