National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date3 Jan 2024
Closing Date19 Jan 2024
Tender Amount₹ 5,52,92,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site excluding cost of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, and hire charges for Tools and Plants including all other incidental charges, etc.,complete, for FOOTIG UNDER ABUTMENTS AND RETURNS WALLS AND PIERS as per section 1500, 1700 & 2100 of MORT&H Specifications (V Revision).

229

-

-

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm ISS graded metal including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, and hire charges for Tools and Plants including all other incidental charges, etc.,complete, for SUBSTRUCTURE ABUTMENT and RETURNS as per section 1500, 1700 & 2200 of MORT&H Specifications (V Revision).

165

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel and also including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, and hire charges for Tools and Plants including all other incidental charges, etc.,complete, as per section 1500, 1700 & 2200 of MORT&H specification (V Revision) for SUB STRUCTURE - PIERS

21

-

-

... More
Providing and fixing CLASS I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing, etc., complete to drain the backfill as per el 2706 of MORT&H specification (V Revision).

80

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges, etc.,complete,as per section 1500, 1700 & 2200 of MORT&H specification (V Revision) for BED BLOCK CUM DIRT WALL OVER ABUTMENTS.

21

-

-

... More
Vibrated Reinforced Cement Concrete of grade M 35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials and cost of cement to site but excluding cost and fabrication of steel but including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges, etc.,complete, as per section 1500, 1700 & 2200 of MORT&H specification (V Revision) for CAPPING BEAM OVER PIERS.

70

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site, formwork and cost of cement at site, but excluding cost and fabrication of steel but including labour charges for mixing, laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc., complete for PEDESTALS OVER PIERS AND ABUTMENTS as per section 1500, 1700 & 2200 of MORT&H specification (V Revision).

5

-

-

... More
Supplying and Fixing of ELASTOMERIC BEARING as shown in drawing including cost and conveyance to work site, labour for fixing the bearing in position and all other incidental charges etc., complete as per section 2000 of MORT&H specification (v Revision)

307200

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing transporting, laying, curing concrete, vibration charges, working at heights, soft water and hire charges for tools and plants, including all other incidental charges etc, complete as per relevant standard spectification for T-BEAMS and CROSS BEAMS as per section 1500, 1700 & 2300 of MORT&H specification (V Revision).

228

-

-

... More
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and plants, including all other incidental charges, etc., complete as per el 1500, 1700 & 2300 of MORT&H specification (V Revision) for DECK SLAB, KERB and SAFETY KERB.

288

-

-

... More
Providing and fixing of G.I DRAINAGE SPOUTS 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised iron pipes and flats and fixing them in position, etc, complete as per cl 2705 of MORT&H specification (V Revision). Over deck

15

-

-

... More
Supplying and installation of STRIP SEAL EXPANSION joint system confirming to specifications for road and bridge works in the 40mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly, including labour, equipment and incidental charges for fixing the joints complete in all respects, as per specifications as per section 2600 of MORT&H specification (V Revision).

59

-

-

... More
Providing FILTER MEDIA behind Abutment and wings for 600mm thickness using filter material conforming to clause 309.3.2.B of MORT &H well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to worksite including all other incidental charges, etc complete as per el 710.1.4 & Appendix 6 of IRC 78-2014.

114

-

-

... More
FILLING BEHIND ABUTMENTS AND RETURNS with clean gritty free draining gravel including cost and having PHI value more than 35°, conveyance of gravel to worksite, laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges, etc., complete as per el 710.1.4 & Appendix 6 of IRC - 78-2014

290

-

-

... More
Compacted Cement Concrete M15 (Ordinary concrete) using 40mm ISS HBG metal, including cost and conveyance of all materials to site and cost of cement at site, including all lablour charges for mixing Concrete, laying, hire charges for Tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, form work etc., complete, as per el 1500, 1700 & 2704 of MORT&H specification (V Revision) For BASE COURSE Below Approach Slab and Safety Kerb Ramp

14

-

-

... More
Vibrated reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including labour charges for mixing. laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc., complete for APPROACH SŁAB as per cl 1500, 1700 & 2704 of MORT&H specification (V Revision).

20

-

-

... More
Vibrated reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including labour charges for mixing, laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc., complete for SAFETY KERB RAMP as per cl 1500, 1700 & 2704 of MORT&H specification (V Revision).

2

-

-

... More
Vibrated Cement Concrete M30 (Design mix) using 20mm, 12mm, 6mm ISS HBG graded Metal, including cost and conveyance of all materials to work site including all leads for softwater, including all other incidental charges formwork, cost of premoulded expansion joints and fixing the same in position ete, complete for WEARING COAT over DECK SLAB and APPROACH SLAB as per el 2702.2 of MORT&H specification (V Revision).

799

-

-

... More
Vibrated Reinforced Cement Concrete M40 (Design mix) using 20 mm ISS HB graded metal, including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing transporting, laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc., complete for CRASH BARRIER as per cl 811, 1700 & 2703.3 of MORT&H specification (V Revision).

57

-

-

... More
Supply and fabrication of High corrosion resistant Marine Fe-500 (HYSD) Fe-500 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting.bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete as per section 1600 & 1009.3 of MORT&H Specifications (V Revision).

122

-

-

... More
Supply and fabrication of Fe-240 steel required in the schedule including cost of steel at site cost of providing and cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills including over lapping to the required length wherever necessary and providing to the reinforcement, placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc complete, as per section 1600, 1009.3 of MORT&H Specifications (V Revision).

6

-

-

... More
Supply and fixing of High Quality of PVC pipes of 160mm dia. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths. as per Section 2706 of MORT&(H) Specifications (Fifth Revision).

348

-

-

... More
Construction of RCC Retaining wall: Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RETAINING WALLS. as per MORT&H Vth Revision 304

-

-

-

... More
RCC Retaining wall A1 side 7.0 m Height

228

-

-

... More
RCC Retaining wall A1 side 6.0 m Height

198

-

-

... More
RCC Retaining wall A2 side 7.0 m Height

228

-

-

... More
Plain Cement Concrete of Grade M-10, Nominal Mix, 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc;complete as per relevant standard specification for BASE COURSE BELOW FOOTINGS OF RCC RETAINING WALLS.as per MORT&H Vth Revision 1000, 1500, 1700

-

-

-

... More
RCC Retaining wall A1 side 7.0 m Height

11

-

-

... More
RCC Retaining wall A1 side 6.0 m Height

9

-

-

... More
RCC Retaining wall A2 side 7.0 m Height

11

-

-

... More
Vibrated reinforced cement concrete M30 grade, Design mix, using 20mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for FOOTING OF RETAINING WALLS. as per section 1000, 1500 & 1700 of MORT&H Vth Revision

-

-

-

... More
RCC Retaining wall A1 side 7.0 m Height

98

-

-

... More
RCC Retaining wall A1 side 6.0 m Height

58

-

-

... More
RCC Retaining wall A2 side 7.0 m Height

98

-

-

... More
Vibrated reinforced cement concrete M30 grade, Design mix, using 20mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for STEM RETAINING WALLS. Below Ground level as per MORT&H Specificaton No.1000, 1500, 1700, 2200

-

-

-

... More
RCC Retaining wall A1 side 7.0 m Height

22

-

-

... More
RCC Retaining wall A1 side 6.0 m Height

19

-

-

... More
RCC Retaining wall A2 side 7.0 m Height

22

-

-

... More
Vibrated reinforced cement concrete M30 grade, Design mix, using 20mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for STEM RETAINING WALLS. Above sill level as per MORT&H Specificaton No.1000, 1500, 1700, 2200

-

-

-

... More
RCC Retaining wall A1 side 7.0 m Height

69

-

-

... More
RCC Retaining wall A1 side 6.0 m Height

39.5

-

-

... More
RCC Retaining wall A2 side 7.0 m Height

69

-

-

... More
Supply and fabrication of Fe-500 D (HYSD) required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods, straightening, cutting, bending, tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per 1600 of MORT&H Specifications (Fifth Revision)

-

-

-

... More
RCC Retaining wall A1 side 7.0 m Height

9

-

-

... More
RCC Retaining wall A1 side 6.0 m Height

4.2

-

-

... More
RCC Retaining wall A2 side 7.0 m Height

9

-

-

... More
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for Broken Parapet as per cl 1000, 1500, 1700 of MORT&H specification (V Revision)

-

-

-

... More
RCC Retaining wall A1 side 7.0 m Height

5

-

-

... More
RCC Retaining wall A1 side 6.0 m Height

3.5

-

-

... More
RCC Retaining wall A2 side 7.0 m Height

5

-

-

... More
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill as per cl.2706 of MORT&H Specification (V Revision)

-

-

-

... More
RCC Retaining wall A1 side 7.0 m Height

66

-

-

... More
RCC Retaining wall A1 side 6.0 m Height

30

-

-

... More
RCC Retaining wall A2 side 7.0 m Height

66

-

-

... More
Construction of PCC retaining wall in A1 & A2 side: Earth work excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS208, including cost of all labour, equipments and all other incidental charges such as bailing out water providing and maintaining necessary cofferdams, sheeting, shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstruction, trimming bottom of excavation backfilling, and clearing the sits and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATION OF PCC RETAINING WALLS. MORT&H-304.

-

-

-

... More
PCC Retaining wall A1 side 4.5 m - 3.5 m Height

162

-

-

... More
PCC Retaining wall A2 side 3.0 m Height

226.8

-

-

... More
Vibrated Cement Concrete of Grade M-20, Nomional Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for FOOTINGS OF RETAINING WALLS, MORT&H - 1000,1500,1700

-

-

-

... More
PCC Retaining wall A1 side 4.5 m - 3.5 m Height

32.4

-

-

... More
PCC Retaining wall A2 side 3.0 m Height

45.36

-

-

... More
Vibrated Cement Concrete of grade M20 Nominal Mix. 1:1.5:3 , using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for STEM OF RETAINING WALLS. (Below the ground level) MORT&H - 1000,1500,1700,2200

-

-

-

... More
PCC Retaining wall A1 side 4.5 m - 3.5 m Height

84.96

-

-

... More
PCC Retaining wall A2 side 3.0 m Height

116.93

-

-

... More
Vibrated Cement Concrete of grade M20 Nominal Mix. 1:1.5:3, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for STEM OF RETAINING WALLS. (Above the ground level) MORT&H - 1000,1500,1700,2200.

-

-

-

... More
PCC Retaining wall A1 side 4.5 m - 3.5 m Height

77.55

-

-

... More
PCC Retaining wall A2 side 3.0 m Height

76.44

-

-

... More
Providing and fixing Class I PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill as per cl.2706 of MORT&H Specification (V Revision)

-

-

-

... More
PCC Retaining wall A1 side 4.5 m - 3.5 m Height

23.7

-

-

... More
PCC Retaining wall A2 side 3.0 m Height

25.48

-

-

... More
Vibrated Cement Concrete of grade M15(Nominal mix ) using 40mm ISS metal, including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, labour charges for mixing concrete, laying, hire charges for Tools and Plants, and incidental charges etc., complete, as per relevant standard Specification for BROKEN PARAPET OVER RETAINING WALL 1000,1500 & 1700 OF MORT&H SPECIFICATIONS (V Revision)

-

-

-

... More
PCC Retaining wall A1 side 4.5 m - 3.5 m Height

5.4

-

-

... More
PCC Retaining wall A2 side 3.0 m Height

9.72

-

-

... More
Formation of Approach road Construction of Embackment with approved material of CBR 8 with all lead and lifts transporting to site spreading, grading to required slope and compacting to meet requirement of table 300-2 of Morth specification 95% compaction with a lead of 4 Km. as per cl 305 of of MORT&H specification (V Revision)

3107

-

-

... More
Construction of subgrade and Earthern Shoulder with approved material obtained from areas shown in the separate drawing for each and every km having CBR value 8 and procter density and field density as per details enclosed transporting to site spreading, grading to required slope and compacting to meet requirement of table 300-2 of Morth specification 97% compaction with a lead of 4 Km. as per cl 305 of of MORT&H specification (V Revision)

665

-

-

... More
Construction of Granular Sub-Base (Gr-V) 150 mm thick by providing close graded materials, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401.

178

-

-

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm. thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to the site laying in uniform layers with pavers in subbase / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5.

297

-

-

... More
Providing and laying Prime coat over WMM surface (treated with primer) using 7.00 kg. of Emulsion bitumen (S.S-1) per 10 sqm. for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidentals charges etc., complete as per clause 502 of MORTH Rev-5.

1187

-

-

... More
Providing and laying Tack coat over WMM surface (treated with primer) using 2.50 kg. of Emulsion bitumen (R.S-1) per 10 sqm. for prepatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidentals charges etc., complete as per clause 503 of MORTH Rev-5.

1187

-

-

... More
Providing and laying 50 mm consolidated thick Bituminous Macadam using 0.20 cum. Of 26.50-13.20mm, 0.43 cum. Of 13.20-2.36 mm and 0.23 cum. Of 2.36 mm & below and with 37.00 kgs. Of VG 30 bitumen for premixing per 10 sqm. Including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by vibratory / pneumatic roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher, vibratory / pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 504 MORTH Rev-5.

60

-

-

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum. of 19.00-9.50mm, 0.17 cum. of 9.50-2.36mm and 0.26 cum. of 2.36 mm and below with 50.30 kgs. of VG 30 bitumen for premixing per 10 sqm. including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne vibratory / pneumatic roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher, vibratory / pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 MORTH Rev-5.

36

-

-

... More
Construction of Box Culvert : Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT and Retaining wall as per MORT&H Vth specification No.304. 111,112.

-

-

-

... More
Single Cell Box Culvert

56

-

-

... More
Double Cell Box Culvert

117

-

-

... More
Plain Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for LEVELING COURSE OF BOX CULVERT .as per clause No.1000, 1500, 1700, 2100, 2200 of MORT&H Vth rev

-

-

-

... More
Single Cell Box Culvert

5

-

-

... More
Double Cell Box Culvert

10

-

-

... More
Vibrated Reinforced Cement Concrete M25 design mix using 20mm ISS size HBG graded metal including cost and conveyance of all materials to worksite including cost of cement at site including soft water, labour charges for mixing transporting, laying and curing concrete, etc., complete as per relevant standard specification for Base Slab, Cover Slab and Side walls excluding Cost of Steel for culvert as per clause No.1000, 1500, 1700, 2200, 2300 of MORT&H Vth rev

-

-

-

... More
Single Cell Box Culvert

32

-

-

... More
Double Cell Box Culvert

74

-

-

... More
Supply and fabrication of Fe.500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete as per clause No.1600 of MORT&H Vth rev

-

-

-

... More
Single Cell Box Culvert

2.06

-

-

... More
Double Cell Box Culvert

4.47

-

-

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., excluding steel complete for wearing coat of 75mm uniform thickness over deck slab as per clause No1000,1500,1700,2702 of MORT&H Vth rev

-

-

-

... More
Single Cell Box Culvert

17.16

-

-

... More
Double Cell Box Culvert

46

-

-

... More
Providing and fixing PVC seepage pipes of 100mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing, etc. complete to drain the backfill in between abutment and wings as per MOR&H Vth specification No.2706

-

-

-

... More
Single Cell Box Culvert

10

-

-

... More
Double Cell Box Culvert

12

-

-

... More
Vibrated Cement Concrete M20 nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Stem of wing wall and parapet and Parapet over Box Culvert as per specification No.1000, 1500, 1700, 2200, 2300 of MORT&H Vth rev

-

-

-

... More
Single Cell Box Culvert

32

-

-

... More
Double Cell Box Culvert

84

-

-

... More
Sub Total Bid Price (in figures)

1

-

-

... More
GST @ 18% of above all Schedules (in figures)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.