National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Jan 2024
Closing Date23 Jan 2024
Tender Amount₹ 5,29,30,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road C

5832

31492

5.4

... More
Construction of Granular sub-base Grade-V 150 mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete Specification Number as per MORTH Rev.V 111,112,401,900).

-

-

-

... More
Road A

633

908601

1435.39

... More
Road B

992.11

1397873

1408.99

... More
Road C

977

1385180

1417.79

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm. thick in two layers of 125mm each thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to the site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete (Specification Number as per MORTH Rev.V 111,112,406,900).

-

-

-

... More
Road A

1076

1903669

1769.21

... More
Road B

1664

2943965

1769.21

... More
Road C

1648

2915658

1769.21

... More
Providing and laying of prime coat over WBM/WMM surface using 7 kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc, complete Specification Number as per MORTH Rev.V 111,112,502,900)

-

-

-

... More
Road A

4301

324940

75.55

... More
Road B

6656

502594

75.51

... More
Road C

6592

498025

75.55

... More
Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete .Specification Number as per MORTH Rev.V 111,112,503,900).

-

-

-

... More
Road A

4301

73073

16.99

... More
Road B

6656

113018

16.98

... More
Road C

6592

111998

16.99

... More
Providing and laying 50mm consolidated thick Bituminous macadam using 0.2cum of 26.5-13.2mm, 0.43cum of 13.22-2.36mm and 0.08 cum of 2.36mm and blow size IRC metal with 37 kg of VG30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross section and consolidated by 8-10 tone vibrator roller to the require density etc including labour for attending the paver to site, etc including hire charges and fuel charges for 20-30 ton CMP with bitumen boiler, tipper trucks, paver finisher / vibrator roller and all other tools and plants required including fuel and all other incidental charges etc complete as per specification using CMP (Specification Number as per MORTH Rev.V 111,112,504,900).

-

-

-

... More
Road A

216

1700326

7871.88

... More
Road B

333

2618279

7862.7

... More
Road C

330

2597720

7871.88

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 30mm with mechanical paver finisher to the specified grades and cross sections and consolidatedby8-10tonne with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP.(Specification Number as per MORTH Rev.V 111,112,507,900).

-

-

-

... More
Road A

130

1326276

10202.13

... More
Road B

200

2037306

10186.53

... More
Road C

198

2020021

10202.13

... More
Vibrated reinforced cement Concrete M30 (Design mix) using ISS HBG graded metal including cost and conveyance of all materials to worksite including cement at site but excluding cost and fabrication of steel but including all labour charges for mixing concrete, laying, hire charges for tools and plants, compacting, curing concrete, soft water, including all other incidental charges formwork, cost of premoulded expansion joints and fixing the same in position etc., complete for WEARING COAT of 75mm uniform thickness OVER HARD BED as per sec.2702 of MORTH specification rev.5

-

-

-

... More
Road C

3600

2489580

691.55

... More
Carted earth including cost and conveyance an average lead of 3 km to worksite and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for formation of side berms in accordance with standard specifications as per MORT&H Vth rev.304, 305.

-

-

-

... More
Road A

1028

199966

194.52

... More
Road B

1679

326599

194.52

... More
Road C

2587

503223

194.52

... More
Providing R.C.C M-15 grade precast KM stone of standard design as per IRC-8-1980 and fixing in position including painting and printing etc., complete.(as per MORT&H specification No:805)

-

-

-

... More
Road A

1

906

906

... More
Road B

1

906

906

... More
Road C

2

1812

906

... More
Providing R.C.C M-15 grade precast HM stone of standard design as per IRC-8-1980 and fixing in position including painting and printing etc., complete.(as per MORT&H specification No:805)

-

-

-

... More
Road A

4

1024

256

... More
Road B

7

1792

256

... More
Road C

11

2816

256

... More
Direction and Place Identification signs - Type - IV Providing and erecting direction and place identification Retro - Reflectorised sign made out of high intensity Prismatic Grade Sheeting confiming to TYPE- IV standards of IRC:67-2012 and ASTM D 4956-09, specification and fixed over 2mm thick aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mmm mild steel angle post 75x75x6mm with a clear height of not less than 2.10m from the ground level bottom of the sign board and 0.60 m below ground level . The sign post should be painted as per IRC 67-2012and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmx45cmx60cm size including cost and conveyance of all materail, equipment, machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by engineer in charge. High intensity Retro Reflectro Sheet shall consist of minimmum coefficient of Retro reflection as per table 6.6 of IRC 67- 2012. The Retro-reflective sheeting shall be covered under 7 years warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per of IRC 67:2012 Specification (as per MoRT&H Specification. No.801) for Scheme board (More than 0.90 sqm)

-

-

-

... More
Road A

1.08

12749

11805

... More
Road B

1.08

12749

11805

... More
Road C

1.08

12749

11805

... More
Box Culvert Dismantling the existing RR Masonry in the existing and clearing away from the work site and carefully stacking the usefull materials for re-use on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per MORT&H Vth specification No.202

-

-

-

... More
Road B Km.0/2 TWO CELL 3X3

5.56

1431

257.4

... More
Road B Km.1/7 SINGLE CELL 2X2

22.95

5907

257.4

... More
Road C Km.1/2 SINGLE CELL 3X3

46.2

11891

257.4

... More
Dismantling the RCC in the existing Slab culvert and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per MOR&H Vth specification No.202.

-

-

-

... More
Road B Km.0/2 TWO CELL 3X3

17.98

70427

3917

... More
Dismantling the existing Cut Stone culvert and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per MOR&H Vth specification No.202.

-

-

-

... More
Road B Km.1/7 SINGLE CELL 2X2

7.15

3334

466.3

... More
Road C Km.1/2 SINGLE CELL 3X3

13.5

6295

466.3

... More
Dismantling the existing Structure like culverts, bridges, retaining wall and other structures comprising of masonry, cement concrete, wood work, steel work, including T & P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with aii lifts and lead of 1000 meters as per MORT&H specification No.202 for dismantling cement concrete by mechanical means

-

-

-

... More
Road C Km.1/2 SINGLE CELL 3X3

35.44

16525

466.3

... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT as per MORT&H Vth specification No.304

-

-

-

... More
Road A Km.1/0

60.16

16489

274.1

... More
Road B Km.0/2 TWO CELL 3X3

159.93

43836

274.1

... More
Road B Km.1/7 SINGLE CELL 2X2

60.16

16489

274.1

... More
Road C Km.1/6,2/0 & 2/6

180.48

49469

274.1

... More
Road C Km.1/2 SINGLE CELL 3X3

150.4

41224

274.1

... More
Plain Cement Concrete M-15 Grade, Nominal Mix, 1:2:4, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of form work, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in depths and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for Leveling course for Box culvert as per MORT&H Vth specification No.1000, 1500, 1700, 2200.

-

-

-

... More
Road A Km.1/0

4.78

27877

5832.01

... More
Road B Km.0/2 TWO CELL 3X3

9.98

56904

5701.87

... More
Road B Km.1/7 SINGLE CELL 2X2

4.78

27179

5686.14

... More
Road C Km.1/6,2/0 & 2/6

14.34

83052

5791.67

... More
Road C Km.1/2 SINGLE CELL 3X3

7.31

41533

5681.67

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork and centering, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Bottom of Slab, Side Walls and Top Slab of Box Culvert as per MORT&H Vth specification No.1000, 1500, 1700, 2200.

-

-

-

... More
Road A Km.1/0

31.53

362570

11499.22

... More
Road B Km.0/2 TWO CELL 3X3

89.45

957669

10706.2

... More
Road B Km.1/7 SINGLE CELL 2X2

31.53

337070

10690.47

... More
Road C Km.1/6,2/0 & 2/6

94.59

1083895

11458.88

... More
Road C Km.1/2 SINGLE CELL 3X3

57

621426

10902.22

... More
Vibrated Cement Concrete M20 nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Stem of Wing Wall and Parapet over Box Culvert as per MORT&H Vth specification No.1000, 1500, 1700, 2200

-

-

-

... More
Road A Km.1/0

34.27

266724

7783.04

... More
Road B Km.0/2 TWO CELL 3X3

81.07

591707

7298.72

... More
Road B Km.1/7 SINGLE CELL 2X2

34.27

249588

7282.99

... More
Road C Km.1/6,2/0 & 2/6

102.81

796026

7742.7

... More
Road C Km.1/2 SINGLE CELL 3X3

61.4

460647

7502.4

... More
Supply and fabrication of Fe.500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per MORT&H Vth specification No.1600

-

-

-

... More
Road A Km.1/0

2.06

195296

94804.27

... More
Road B Km.0/2 TWO CELL 3X3

6.09

577358

94804.27

... More
Road B Km.1/7 SINGLE CELL 2X2

2.06

195296

94804.27

... More
Road C Km.1/6,2/0 & 2/6

6.18

585890

94804.27

... More
Road C Km.1/2 SINGLE CELL 3X3

3.5

331814

94804.27

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., excluding steel complete for wearing coat of 75mm uniform thickness over deck slab as per MORTH Rev. V Specification No.1000, 1500, 1700, 2702.

-

-

-

... More
Road A Km.1/0

17.16

11919

694.63

... More
Road B Km.0/2 TWO CELL 3X3

47.45

32489

684.7

... More
Road B Km.1/7 SINGLE CELL 2X2

17.16

11728

683.5

... More
Road C Km.1/6,2/0 & 2/6

51.48

35600

691.55

... More
Road C Km.1/2 SINGLE CELL 3X3

25.35

17530

691.55

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drain in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Earth with a lead of 5km for formation of Diversion road for 100% compaction as per MOR&H Vth specification No.111, 112, 304, 305.

-

-

-

... More
Road A Km.1/0

212

41238

194.52

... More
Road B Km.0/2 TWO CELL 3X3

352.5

68568

194.52

... More
Road B Km.1/7 SINGLE CELL 2X2

211.5

41140

194.52

... More
Road C Km.1/6,2/0 & 2/6

634.5

123422

194.52

... More
Road C Km.1/2 SINGLE CELL 3X3

212

41238

194.52

... More
Construction of granular sub - base Gr-V of 150 mm thick by providing close graded Material, mixing in a mechanical mix plantat OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density for Diversion Road complete as per clause 401 (Specification Number as per MORTH Rev.V 111,112,401,900).

-

-

-

... More
Road A Km.1/0

16.88

24229

1435.39

... More
Road B Km.0/2 TWO CELL 3X3

28.13

39634

1408.99

... More
Road B Km.1/7 SINGLE CELL 2X2

16.88

23783

1408.99

... More
Road C Km.1/6,2/0 & 2/6

50.63

71782

1417.79

... More
Road C Km.1/2 SINGLE CELL 3X3

17

24102

1417.79

... More
Retaining Wall Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RETAINING WALLS. as per sec.111,112,304 of MORTH specification rev.5

-

-

-

... More
Road A Km.0/0 - 0/10

81

20420

252.1

... More
Road C Km.1/2

243

61260

252.1

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for FOOTINGS OF RETAINING WALLS. as per sec.1000,1500,1700,2100,2200 of MORTH specification rev.5

-

-

-

... More
Road A Km.0/0 - 0/10

17

102038

6002.28

... More
Road C Km.1/2

49

292793

5975.38

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for STEM OF RETAINING WALLS. Below the sill Level as per sec.1000,1500,1700,2200 of MORTH specification rev.5

-

-

-

... More
Road A Km.0/0 - 0/10

42

306702

7302.43

... More
Road C Km.1/2

126

901692

7156.29

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for STEM OF RETAINING WALLS. Above the sill level as per sec.1000,1500,1700,2200 of MORTH specification rev.5

-

-

-

... More
Road A Km.0/0 - 0/10

28

239304

8546.59

... More
Road C Km.1/2

82

687808

8387.91

... More
Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill IN THE ABUTMENTS AND WINGS. as per sec.2706 of MORTH specification rev.5

-

-

-

... More
Road A Km.0/0 - 0/10

15

2662

177.5

... More
Road C Km.1/2

51

9052

177.5

... More
Vibrated Cement Concrete of Grade M-20, Nominal Mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for Broken Parapet as per sec.1000,1500,1700,2200,2300 of MORTH specification rev.5

-

-

-

... More
Road A Km.0/0 - 0/10

4

43079

10769.78

... More
Road C Km.1/2

11

118171

10742.89

... More
CC Pavement Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Cut off wall

-

-

-

... More
Road C Km.0/0 - 0/850 & 2/010 - 2/120

96

13156

137.05

... More
Construction of Granular sub-base Grade-V by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 for C.C Pavement

-

-

-

... More
Road C Km.0/0 - 0/850 & 2/010 - 2/120

36

51040

1417.79

... More
Vibrated cement concrete M20 Nominal mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and including cement at site, including cost of form work, labour charges for mixing, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges etc., complete for Cut off wall

-

-

-

... More
Road C Km.0/0 - 0/850 & 2/010 - 2/120

288

2665258

9254.37

... More
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, concrete strength not to be less than 10 Mpa at 7 days, mixed at site, compacted using vibrator, finishing and curing.

-

-

-

... More
Road C Km.0/0 - 0/850 & 2/010 - 2/120

24

112992

4708.01

... More
Vibrated cement concrete M30 design mix using ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel but including form work, labour charges for mixing, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges etc., complete for CC Pavement

-

-

-

... More
Road C Km.0/0 - 0/850 & 2/010 - 2/120

108

1167137

10806.83

... More
Providing expansion and contraction joints in both the longitudinal and transverse direction using bituminous pads of 20mm thickness including all cost, conveyance and all labour charges for fixing them in position as per the standard specification.

-

-

-

... More
Road C Km.0/0 - 0/850 & 2/010 - 2/120

24

2400

100

... More
Pipe Culvert Dismantling culverts bridges and other structures dismantling savaging and removal and disposing off resulting materials and back filling trenches and pits etc., for RR masonry as per MORT & H specification 111,112,202

-

-

-

... More
Road C Km.1/6

7

1801

257.4

... More
Earthwork excavation in all classes of soil such as hard stiff clay, stiff black cotton soil, hard red earth, shales, muram, gravel, stone earth etc., depositing on bank with all leads and lifts as per SS 20 B and all other incidental charges such as baling out water, shoring, strutting, walling, and forming protective bund wherever necessary etc., complete as directed by the Engineer as per MORTH No. 111, 112, 304. for Foundation.

-

-

-

... More
Road C Km.1/6

35

8823

252.1

... More
Cement Concrete M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths, tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications as directed by the Engineer for Foundation as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100

-

-

-

... More
Road C Km.1/6

4

23622

5905.58

... More
Vibrated Cement Concrete M15 (Nominal Mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications as directed by the Engineer for as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100 (Below Sill)

-

-

-

... More
Road C Km.1/6

10

78619

7861.96

... More
Vibrated Cement Concrete M20 (Nominal Mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications as directed by the Engineer for as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100 (Above Sill Level)

-

-

-

... More
Road C Km.1/6

18

168065

9336.99

... More
Supplying, Laying Hoisting and fixing RCC Pipes conforming to IS 458 of NP3 class of 1000 mm dia of standard length in position with Collars including cost and conveyance of Pipes and Collars which will be supplied by the contractor himself at worksite including all labour charges for hoisting and laying the pipes and fixing in position, packing joints in Cement Mortor 1:4 and all other incidental charges etc., complete as per the standard specification as per MOR&H Vth specification No.2900

-

-

-

... More
Road C Km.1/6

7.5

30975

4130

... More
Providing and laying Ist class bedding with Stone Dust including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc. complete.as per sec.1000 of MORTH specification rev.5

-

-

-

... More
Road C Km.1/6

10

2562

256.23

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

44855849.19

... More
GST 18% for above SubTotal Amount

1

8074052

8074052.86

... More
Total in Figures (SubTotal + GST)

-

52929902

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.