National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Eprocure
Opening Date12 Jun 2020
Closing Date13 Jul 2020
Tender Amount₹ 6,30,38,740 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Picking the existing BT surface up to 50 mm thick depth etc complete as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed for the work and including all other incidental charges etc., complete as per MORTH Specification.

-

-

-

... More
(a) Upgradation of Maramangalam -Kelaiyur Road Km 0/0-3/0

3872.5

-

19.14

... More
(b) Upgradation of E. Vaniyambadi ervadi to Poolavari Road Km 0/0 - 3/4

3931.25

-

15.31

... More
(c) Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit Km 4/2-5/8

1920.83

-

15.31

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Boxing.

-

-

-

... More
(c) Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit Km 4/2-5/8

575.2

-

84

... More
Granular Sub-base with Graded Material (Table:-400-1)-Plant Mix Method Construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification -for grading-V Material.

-

-

-

... More
(c) Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit Km 4/2-5/8

503.3

-

1476.88

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet mix macadam specification including premixing the materials with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub base course on well prepared surface and compacting with Vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 406 of MORTH Rev-5.

-

-

-

... More
(a) Upgradation of Maramangalam -Kelaiyur Road Km 0/0-3/0

2904.38

-

1813.31

... More
(b) Upgradation of E. Vaniyambadi ervadi to Poolavari Road Km 0/0 - 3/4

2948.5

-

1739.29

... More
(c) Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit Km 4/2-5/8

2069.76

-

1739.29

... More
Providing and laying Prime Coat over WMM surface using 7 Kgs of Emulsion Bitumen (SS I) for 10sqm for preparatory to another Bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5.

-

-

-

... More
(a) Upgradation of Maramangalam -Kelaiyur Road Km 0/0-3/0

11617.5

-

58.36

... More
(b) Upgradation of E. Vaniyambadi ervadi to Poolavari Road Km 0/0 - 3/4

11794

-

50.92

... More
(c) Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit Km 4/2-5/8

8279

-

50.9

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.5kgs Bitumen Emulsion (RS I) for 10sqm for preparatory to another Bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5.

-

-

-

... More
(a) Upgradation of Maramangalam -Kelaiyur Road Km 0/0-3/0

11617.5

-

11.52

... More
(b) Upgradation of E. Vaniyambadi ervadi to Poolavari Road Km 0/0 - 3/4

11794

-

10.83

... More
(c) Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit Km 4/2-5/8

8279

-

10.82

... More
Providing and laying Vibrated Cement Concrete of Grade M-20, Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for HARD BED.

-

-

-

... More
(b) Upgradation of E. Vaniyambadi ervadi to Poolavari Road Km 0/0 - 3/4

206.3

-

5399

... More
Providing and laying tack coat over Dry Lean Cement Concrete Surface using 3.00 Kg of bitumen Emulsion (RS1) per 10sqm for preparatory to another Bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5.

-

-

-

... More
(b) Upgradation of E. Vaniyambadi ervadi to Poolavari Road Km 0/0 - 3/4

562.5

-

12.14

... More
Providing and laying 50mm thick Consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm 0.430cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below IRC metal with 37 kg of VG30 bitumen for premixing per 10sqm including coat and conveyance of all materials to CMP site including heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 tones capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, paver finisher/ 9m paver finisher, Vibratory roller and all other Tools and plants required, including fuel and all other and incidental charges etc., complete as per Specification using CMP as per clause 504 of MORTH rev-5.

-

-

-

... More
(a) Upgradation of Maramangalam -Kelaiyur Road Km 0/0-3/0

580.88

-

5679.54

... More
(b) Upgradation of E. Vaniyambadi ervadi to Poolavari Road Km 0/0 - 3/4

617.9

-

5467.14

... More
(c) Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit Km 4/2-5/8

413.95

-

5467.14

... More
Providing and laying Bituminous concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50 - 2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonnes capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, paver finisher/ 9m paver finisher, Vibratory roller and all other Tools and plants required, including fuel and all other and incidental charges etc., complete as per Specification using CMP as per clause 507 of MORTH rev-5.

-

-

-

... More
(a) Upgradation of Maramangalam -Kelaiyur Road Km 0/0-3/0

348.53

-

7057

... More
(b) Upgradation of E. Vaniyambadi ervadi to Poolavari Road Km 0/0 - 3/4

370.7

-

6808.35

... More
(c) Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit Km 4/2-5/8

248.38

-

6808.35

... More
Providing and laying earth for making up berms using Carted earth with a lead of 5 Km including Labour charges for spreading, hire and fuel charges for all T & P employed etc., complete as directed by the departmental officers for filling labour charges only.

-

-

-

... More
(a) Upgradation of Maramangalam -Kelaiyur Road Km 0/0-3/0

2970

-

230.41

... More
(b) Upgradation of E. Vaniyambadi ervadi to Poolavari Road Km 0/0 - 3/4

2026.2

-

154.57

... More
(c) Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit Km 4/2-5/8

1234.3

-

154.57

... More
Providing RCC M15 grade precast KM stone of stanard design as per IRC 8 - 1980 and fixing in position including painting and printing etc complete (as per MORTH & H specification no 804)

-

-

-

... More
(a) Upgradation of Maramangalam -Kelaiyur Road Km 0/0-3/0

3

-

906

... More
(b) Upgradation of E. Vaniyambadi ervadi to Poolavari Road Km 0/0 - 3/4

3

-

906

... More
(c) Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit Km 4/2-5/8

1

-

906

... More
Providing RCC M15 grade precast HM stone of stanard design as per IRC 26-1967 and fixing in position including painting and printing etc complete (as per MORTH & H specification no 804)

-

-

-

... More
(a) Upgradation of Maramangalam -Kelaiyur Road Km 0/0-3/0

12

-

256

... More
(b) Upgradation of E. Vaniyambadi ervadi to Poolavari Road Km 0/0 - 3/4

13

-

256

... More
(c) Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit Km 4/2-5/8

7

-

256

... More
Earthwork Excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including Cost of all labour, equipments and all incidental charges such as cofferdams, sheeting, shoring bracing and their subsequent removal, removal of logs, stumps,grubs,and other deleterious matter and obstructins, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RETAINING WALL AND BOX CULVERT.

-

-

-

... More
(a.1) Construction of Retaining wall at Km 0/0-1/0 and 1/0-2/0 for the work of Upgradation of Maramangalam -Kelaiyur Road

562

-

84

... More
(c.1) Construction of Retaining wall at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

418

-

84

... More
(c.2) Construction of Single cell Box Culvert 8m x 7m size in lieu of existing slab culvert at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

300.3

-

84

... More
(c.3) Construction of Drain at Km 4/6& 4/8 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

697.95

-

84

... More
Vibrated Cement Concrete of Grade M-20, Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for FOOTINGS OF PCC RETAINING WALL.

-

-

-

... More
(a.1) Construction of Retaining wall at Km 0/0-1/0 and 1/0-2/0 for the work of Upgradation of Maramangalam -Kelaiyur Road

270.8

-

8021.98

... More
Vibrated Cement Concrete of Grade M-20, Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for STEM OF PCC RETAINING WALL.

-

-

-

... More
(a.1) Construction of Retaining wall at Km 0/0-1/0 and 1/0-2/0 for the work of Upgradation of Maramangalam -Kelaiyur Road

593.27

-

8774.05

... More
Providing and fixing seepage pipes of 110mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill in the retaining wall.

-

-

-

... More
(a.1) Construction of Retaining wall at Km 0/0-1/0 and 1/0-2/0 for the work of Upgradation of Maramangalam -Kelaiyur Road

374

-

172.8

... More
(c.1) Construction of Retaining wall at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

80

-

172.8

... More
Earthwork for filling behind the Retaining wall including cost and conveyance of earth to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete for filling behind the Retaining wall with the lead of 5 Km.

-

-

-

... More
(a.1) Construction of Retaining wall at Km 0/0-1/0 and 1/0-2/0 for the work of Upgradation of Maramangalam -Kelaiyur Road

583.4

-

161.7

... More
(c.1) Construction of Retaining wall at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

587

-

161.7

... More
Vibrated Cement Concrete of Grade M-15, Nominal Mix, 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELING COURSE OF RCC RETAINING WALL.

-

-

-

... More
(c.1) Construction of Retaining wall at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

31.4

-

5095.09

... More
Vibrated Reinforced Cement Concrete of Grade M-30, Design mix using ISS HBG metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for FOOTINGS OF RCC RETAINING WALL.

-

-

-

... More
(c.1) Construction of Retaining wall at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

214

-

7577

... More
Vibrated Reinforced Cement Concrete of Grade M-30, Design mix using ISS HBG metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for STEM OF RCC RETAINING WALL.

-

-

-

... More
(c.1) Construction of Retaining wall at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

140

-

10555

... More
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe-500D conforming to IS:1786-1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete for RCC Retaining wall.

-

-

-

... More
(c.1) Construction of Retaining wall at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

18.3

-

73383

... More
Vibrated Cement Concrete of Grade M-20, Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for PARAPET OVER RCC RETAINING WALL.

-

-

-

... More
(c.1) Construction of Retaining wall at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

4.5

-

8908.39

... More
Filling behind the Box Culvert with quarry dust clean gritty gravel including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete for Box Culvert.

-

-

-

... More
(c.2) Construction of Single cell Box Culvert 8m x 7m size in lieu of existing slab culvert at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

53

-

249.7

... More
Vibrated Cement Concrete of Grade M-20, Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE OF BOX CULVERT.

-

-

-

... More
(c.2) Construction of Single cell Box Culvert 8m x 7m size in lieu of existing slab culvert at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

48.4

-

5279

... More
Vibrated Reinforced Cement Concrete of Grade M-30, Design mix using ISS HBG metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE SLAB, SIDE AND TOP WALLS OF BOX CULVERT.

-

-

-

... More
(c.2) Construction of Single cell Box Culvert 8m x 7m size in lieu of existing slab culvert at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

480

-

8232

... More
Vibrated Reinforced Cement Concrete of Grade M-40, Design mix using ISS HBG metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for RCC CRASH BARRIER OVER DECK SLAB OF BOX CULVERT.

-

-

-

... More
(c.2) Construction of Single cell Box Culvert 8m x 7m size in lieu of existing slab culvert at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

6

-

12610

... More
Supply and fabrication of Fe-500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings,including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete for Box Culvert.

-

-

-

... More
(c.2) Construction of Single cell Box Culvert 8m x 7m size in lieu of existing slab culvert at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

27

-

73383

... More
Vibrated Reinforced cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site but excluding cost and fabrication of steel and including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over Top slab of Box Culvert.

-

-

-

... More
(c.2) Construction of Single cell Box Culvert 8m x 7m size in lieu of existing slab culvert at Km 4/6 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

116

-

579.35

... More
Vibrated Cement Concrete of Grade M-15, Nominal Mix, 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for BASE COURSE OF DRAIN.

-

-

-

... More
(c.3) Construction of Drain at Km 4/6& 4/8 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

126.9

-

5005.09

... More
Vibrated Cement Concrete of Grade M-15, Nominal Mix, 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for DRAIN.

-

-

-

... More
(c.3) Construction of Drain at Km 4/6& 4/8 for the work of Upgradation of Guruvampatty Road (From Corporation Limits to Kondappanaickenpatty Limit) And Chettichavadi Limit to Zoo Limit

253.8

-

7312.9

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

56284589.31

... More
GST 12% for above SubTotal Amount

1

-

6754150.72

... More
Total in Figures (SubTotal + GST)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.