Indian Oil Corporation Limited Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Indian Oil Corporation Limited - IOCL Tender

Works
Telecommunication Services
Eprocure
Opening Date9 Dec 2024
Closing Soon13 Jan 2025
Tender Amount₹ 33,46,040.69 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of OFC Jointing kits as per tender specifications

14

-

117275.48

... More
Supply of full range (upto 8 feet) RF iD Disk type Electronic Markers as per tender specifications

14

-

30016.84

... More
Supply Patch Cord (OS2, Duplex, LC-LC / SC-SC / LS-SC connectors, single mode, 5/10/15/20/30 Meters length) as per tender specificat ions

5

-

8222.3

... More
Supply of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications.

14

-

169924.72

... More
Supply of wall mounted Fibre Termination Box (FMS) as per tender specifications

2

-

29988.52

... More
Services - Chennai PS

-

-

-

... More
Laying of HDPE pipe (excluding blowing of OFC) in mainline pipe trench at the bottom in all types of soil (including roads, canals, rivers, nullahs, water course crossings, submerged crossings, saltpan areas etc.) including supply and installation of suitable stra ps for strapping the HDPE duct with mainline pipe for anti buoyancy, installation of HDPE duct accessories such as plastic couplers , end caps, end plugs, cable sealing plugs, supply and installation of warning tape, consumable guide rods, HDPE jointing, inspecti on of HDPE joints, testing the installed HDPE duct by blowing "mandrel" with compressed air, pressure testing the HDPE pipe after l ayi ng as per procedure and performing all work as per drawings, specifications and instruction of the Engineer-in-charge/ Site Engi neer and provisions of the contract document for making the duct ready in all respect for OFC blowing. The job includes transportat ion, loading and unloading of HDPE ducts in nominal length of 1000 meters and duct accessories such as couplers, end caps, end seali ng pl ugs etc. to various sites along the entire ROW / HDD crossing locations as per specifications and directions of Engineer-in-ch arge/ Site Engineer

0.25

-

2616.06

... More
Trenching for laying of HDPE in Independent trench Excavation in unpaved areas of earth in work sites for conventional cable trenche s for a depth upto 1.5 metres including shoring, strutting etc. (if necessary), backfilling the trench, as directed by Engineer-in- c harge/ Site Engineer, including all labour and materials complete as per drawings and tender specifications

100

-

26904

... More
OTDR testing from both ends of optical fiber cable for fault identification. (rates are OTDR per fiber from both side basis).

80

-

6550.42

... More
Transportation (loading and unloading) of Owner supplied unarmoured Optical fibre cable (OFC) to various sites along Right of Way (R OW), pre laying testing of each cable drum for each fibre as per the scope, specifications and directions of Engineer-in-charge/ Site Engineer

0.25

-

4099.03

... More
Splicing of OFC at site including transportation of OFC cable from IOCL store- to the site and OTDR testing after Splicing to check confirmity of splicing wthin specified limit as per teder . However, Supply of OFC cable shall be in scope of IOCL. (rates are to be quoted on per fiber basis).

120

-

75763.08

... More
Blowing of OFC through laid HDPE, post installation testing of OFC for each fibre for drum laid & maintaining OTDR traces as per the scope, specifications and directions of Engineer-in-charge/ Site Engineer

50

-

2360

... More
Installation of OFC jointing kits as per drawings, specifications and directions of Engineer-in-charge/ Site Engineer

14

-

91190.4

... More
Installation of RF iD type Electronic Markers as per tender specifications. The job includes configuration & programming of the Elec tronic markers to write information data as per directions of Engineer-in-charge/ Site Engineer.

14

-

7450.52

... More
Installation of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications, drawings and directions of Engineer-in -charge/ Site Engineer.

14

-

26316.36

... More
Installation of wall mounted Fibre Termination Box (FMS) as per tender specifications and directions of Engineer-in-charge/ Site Eng ineer

2

-

14771.24

... More
Mobilization charge for each restoration site per instance

7

-

15831.86

... More
"Laying of armoured / unarmoured cables (control / signalling/ Triad/ LT cable/OFC etc.) and installation / pulling of cables of all type in trenches, in cable racks, in trays, in protective pipes, poles, columns, in conduits, in panels, in buildings, walls, ceili ngs, and on structures etc.; including the supply and installation of all required materials such as fixing clamps, screws, cab le s traps, tags etc. as required (other than the supply of the conduits, cables, pipes, cable racks, trays, poles, structures and pa nel s) complete in all respect,as per specifications,drawings and directions of the SiteEngineer, including cost of all labour, tools , consumable materials etc. and cutting the cables in required lengths Note: Outer diameter between 20 to 30 mm"

100

-

10761.6

... More
Composite - Chennai PS

-

-

-

... More
Laying of HDPE conduit and blowing of OFC cable inside the SV/MOV premises along the boundary wall, line item includes supply & inst allation of suitable clamps , connectors, fixture, corner bends, tools & tackles (comprising of anchor bolts/nuts/accessories etc) r equired for OFC entry inside SV/MOV loctaionalong the boundary wall by clamping of HDPE conduit at a height of 1 meter above the f in ished ground level and extending it along the length of boundary wall at 1 meter height upto the transition pit inside SV/RCP bui ldi ng as per attached drawing no. STD-793-00. The line item includes all sevices required for blowing of OFC cable iin HDPE conduit ins ide the MOV/SV loctaion as per STD - 793 drawing.

50

-

2360

... More
"Design, detailed engineering, installation of OFC conduit at specified minimum depth across River/ water bodies (canal/ drain/ nall a, marshy area etc.)/ Highway (NH/SH/Expressways) /Railways/ congested areas etc. by Horizontal Directional Drilling (HDD) method: # Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilisation & de-mobilisation at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arr anging the required land for site preparations and execution of, but not limited to, the following works in accordance with the spec ifications, drawings and as per all provisions of the contract document and instructions of the Owner; # Interpretation of data of h ydrological / geo-technical surveys furnished by the Owner (if any), carrying out fresh topographic survey of the crossing location & developing new profile drawing for the crossing location, carrying out additional surveys required for collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparation of all necessary constructio n drawings for approval of the Owner as per the provisions of contract document, preparation of detailed construction method stateme nt and design analysis; # Complete site preparation including arranging of additional required land beyond ROW provided by Owner, se tting up of fabrication yard, preparation of temporary arrangement for pipe stringing, launching etc.; # Pre-construction surveys an d collection of all necessary data related to site, underground utilities etc.; # Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC, # Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC; # C arrying out air cleaning of the complete pipeline string; # Installation of the OFC conduit below theRiver/ water bodies (canal/ dra in/ nalla, marshy area etc.)/ Highway (NH/SH/Expressways) /Railways/ congested areas etc. by single horizontal directional drilling operation to the correct profile as per the approved drawings in different soil stata at site. # Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc.; # Transportation of surplus Owner-supplied OFC cable/materials to the to the Owner's designated storage location; # Preparation of As-built drawings and other records etc.; # All other works not specif ically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and constructi on method statement, leading to successful completion of the works; Note : 89 mm OD (Normal)"

50

-

447591.11

... More
Supply, erection and installation of GI Pipe of 100 mm nominal bore medium Class B as per IS1239 subject to owner's approval includi ng the supply & installation of all necessary pipe fittings such as bends, sockets, elbows, tees etc. bending, threading, clamping, plugs, packings, bushing etc. as required for sub ducting HDPE duct as per directions of Engineer-in-charge/ Site Engineer includin g cost of all labour, tools, materials complete in all respects.

25

-

41005

... More
Supply and Installation of GI Pipe of 100 mm nominal bore heavy class as per IS1239, sub ducted by 40 mm OD HDPE pipe (excluding sup ply of HDPE pipe), by boring or jacking method across railway crossing, including all necessary pipe fittings, cost of arranging bor ing machine, other associated machinery, tools, tackles, skilled manpower, labour etc. job complete in every respects as per the dir ections of Engineer-in-charge/ Site Engineer. Measurement shall be done by the length of the GI pipe used in the crossings

25

-

141570.5

... More
Repair of OFC defects in existing optical fibre cable already laid along the pipeline in various stretches. The job includes locatin g OFC defects/joint losses by taking OTDR, exposing the cable by excavation/trenching in all kinds of soil including rock, repairing the cut/damaged OFC by splicing and restoring the trenches in original condition, checking , ensuring continuity of OFC with accep t able losses as per direction of site engineer/EIC. Supply and installation of all required materials for repair such as joint kit, R Fid marker (With stamping from owner's electronic marker cum locator), RCC joint box etc shall be in scope of contractor. OFC cab le if required for repair works shall be provided by owner. All the test/repair equipment such as OTDR machine, splicing machine, to ols /tackles, labour, consumable necessary for performance of work shall be arranged by the contractor. supply of joint kit, Rfid ma rker shall be as per approved make in the tender.

5

-

170650.13

... More
Supply - Ennore

-

-

-

... More
Supply of 40 mm OD HDPE pipe as per tender specifications

0.25

-

16343.88

... More
Supply of OFC Jointing kits as per tender specifications

16

-

134029.12

... More
Supply of full range (upto 8 feet) RF iD Disk type Electronic Markers as per tender specifications

16

-

34304.96

... More
Supply Patch Cord (OS2, Duplex, LC-LC / SC-SC / LS-SC connectors, single mode, 5/10/15/20/30 Meters length) as per tender specificat ions

5

-

8222.3

... More
Supply of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications.

16

-

194199.68

... More
Supply of wall mounted Fibre Termination Box (FMS) as per tender specifications

2

-

29988.52

... More
Services - Ennore

-

-

-

... More
Laying of HDPE pipe (excluding blowing of OFC) in mainline pipe trench at the bottom in all types of soil (including roads, canals, rivers, nullahs, water course crossings, submerged crossings, saltpan areas etc.) including supply and installation of suitable stra ps for strapping the HDPE duct with mainline pipe for anti buoyancy, installation of HDPE duct accessories such as plastic couplers , end caps, end plugs, cable sealing plugs, supply and installation of warning tape, consumable guide rods, HDPE jointing, inspecti on of HDPE joints, testing the installed HDPE duct by blowing "mandrel" with compressed air, pressure testing the HDPE pipe after l ayi ng as per procedure and performing all work as per drawings, specifications and instruction of the Engineer-in-charge/ Site Engi neer and provisions of the contract document for making the duct ready in all respect for OFC blowing. The job includes transportat ion, loading and unloading of HDPE ducts in nominal length of 1000 meters and duct accessories such as couplers, end caps, end seali ng pl ugs etc. to various sites along the entire ROW / HDD crossing locations as per specifications and directions of Engineer-in-ch arge/ Site Engineer

0.25

-

2616.06

... More
Trenching for laying of HDPE in Independent trench Excavation in unpaved areas of earth in work sites for conventional cable trenche s for a depth upto 1.5 metres including shoring, strutting etc. (if necessary), backfilling the trench, as directed by Engineer-in- c harge/ Site Engineer, including all labour and materials complete as per drawings and tender specifications

125

-

33630

... More
OTDR testing from both ends of optical fiber cable for fault identification. (rates are OTDR per fiber from both side basis).

100

-

8188.02

... More
Transportation (loading and unloading) of Owner supplied unarmoured Optical fibre cable (OFC) to various sites along Right of Way (R OW), pre laying testing of each cable drum for each fibre as per the scope, specifications and directions of Engineer-in-charge/ Site Engineer

0.25

-

4099.03

... More
Splicing of OFC at site including transportation of OFC cable from IOCL store- to the site and OTDR testing after Splicing to check confirmity of splicing wthin specified limit as per teder . However, Supply of OFC cable shall be in scope of IOCL. (rates are to be quoted on per fiber basis).

240

-

151526.16

... More
Blowing of OFC through laid HDPE, post installation testing of OFC for each fibre for drum laid & maintaining OTDR traces as per the scope, specifications and directions of Engineer-in-charge/ Site Engineer

50

-

2360

... More
Installation of OFC jointing kits as per drawings, specifications and directions of Engineer-in-charge/ Site Engineer

16

-

104217.6

... More
Installation of RF iD type Electronic Markers as per tender specifications. The job includes configuration & programming of the Elec tronic markers to write information data as per directions of Engineer-in-charge/ Site Engineer.

16

-

8514.88

... More
Installation of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications, drawings and directions of Engineer-in -charge/ Site Engineer.

16

-

30075.84

... More
Installation of wall mounted Fibre Termination Box (FMS) as per tender specifications and directions of Engineer-in-charge/ Site Eng ineer

2

-

14771.24

... More
Mobilization charge for each restoration site per instance

8

-

18093.55

... More
"Laying of armoured / unarmoured cables (control / signalling/ Triad/ LT cable/OFC etc.) and installation / pulling of cables of all type in trenches, in cable racks, in trays, in protective pipes, poles, columns, in conduits, in panels, in buildings, walls, ceili ngs, and on structures etc.; including the supply and installation of all required materials such as fixing clamps, screws, cab le s traps, tags etc. as required (other than the supply of the conduits, cables, pipes, cable racks, trays, poles, structures and pa nel s) complete in all respect,as per specifications,drawings and directions of the SiteEngineer, including cost of all labour, tools , consumable materials etc. and cutting the cables in required lengths Note: Outer diameter between 20 to 30 mm"

300

-

32284.8

... More
Composite - Ennore

-

-

-

... More
Laying of HDPE conduit and blowing of OFC cable inside the SV/MOV premises along the boundary wall, line item includes supply & inst allation of suitable clamps , connectors, fixture, corner bends, tools & tackles (comprising of anchor bolts/nuts/accessories etc) r equired for OFC entry inside SV/MOV loctaionalong the boundary wall by clamping of HDPE conduit at a height of 1 meter above the f in ished ground level and extending it along the length of boundary wall at 1 meter height upto the transition pit inside SV/RCP bui ldi ng as per attached drawing no. STD-793-00. The line item includes all sevices required for blowing of OFC cable iin HDPE conduit ins ide the MOV/SV loctaion as per STD - 793 drawing.

50

-

2360

... More
"Design, detailed engineering, installation of OFC conduit at specified minimum depth across River/ water bodies (canal/ drain/ nall a, marshy area etc.)/ Highway (NH/SH/Expressways) /Railways/ congested areas etc. by Horizontal Directional Drilling (HDD) method: # Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilisation & de-mobilisation at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arr anging the required land for site preparations and execution of, but not limited to, the following works in accordance with the spec ifications, drawings and as per all provisions of the contract document and instructions of the Owner; # Interpretation of data of h ydrological / geo-technical surveys furnished by the Owner (if any), carrying out fresh topographic survey of the crossing location & developing new profile drawing for the crossing location, carrying out additional surveys required for collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparation of all necessary constructio n drawings for approval of the Owner as per the provisions of contract document, preparation of detailed construction method stateme nt and design analysis; # Complete site preparation including arranging of additional required land beyond ROW provided by Owner, se tting up of fabrication yard, preparation of temporary arrangement for pipe stringing, launching etc.; # Pre-construction surveys an d collection of all necessary data related to site, underground utilities etc.; # Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC, # Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC; # C arrying out air cleaning of the complete pipeline string; # Installation of the OFC conduit below theRiver/ water bodies (canal/ dra in/ nalla, marshy area etc.)/ Highway (NH/SH/Expressways) /Railways/ congested areas etc. by single horizontal directional drilling operation to the correct profile as per the approved drawings in different soil stata at site. # Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc.; # Transportation of surplus Owner-supplied OFC cable/materials to the to the Owner's designated storage location; # Preparation of As-built drawings and other records etc.; # All other works not specif ically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and constructi on method statement, leading to successful completion of the works; Note : 89 mm OD (Normal)"

50

-

447591.11

... More
Supply, erection and installation of GI Pipe of 100 mm nominal bore medium Class B as per IS1239 subject to owner's approval includi ng the supply & installation of all necessary pipe fittings such as bends, sockets, elbows, tees etc. bending, threading, clamping, plugs, packings, bushing etc. as required for sub ducting HDPE duct as per directions of Engineer-in-charge/ Site Engineer includin g cost of all labour, tools, materials complete in all respects.

25

-

41005

... More
Supply and Installation of GI Pipe of 100 mm nominal bore heavy class as per IS1239, sub ducted by 40 mm OD HDPE pipe (excluding sup ply of HDPE pipe), by boring or jacking method across railway crossing, including all necessary pipe fittings, cost of arranging bor ing machine, other associated machinery, tools, tackles, skilled manpower, labour etc. job complete in every respects as per the dir ections of Engineer-in-charge/ Site Engineer. Measurement shall be done by the length of the GI pipe used in the crossings

75

-

424711.5

... More
Repair of OFC defects in existing optical fibre cable already laid along the pipeline in various stretches. The job includes locatin g OFC defects/joint losses by taking OTDR, exposing the cable by excavation/trenching in all kinds of soil including rock, repairing the cut/damaged OFC by splicing and restoring the trenches in original condition, checking , ensuring continuity of OFC with accep t able losses as per direction of site engineer/EIC. Supply and installation of all required materials for repair such as joint kit, R Fid marker (With stamping from owner's electronic marker cum locator), RCC joint box etc shall be in scope of contractor. OFC cab le if required for repair works shall be provided by owner. All the test/repair equipment such as OTDR machine, splicing machine, to ols /tackles, labour, consumable necessary for performance of work shall be arranged by the contractor. supply of joint kit, Rfid ma rker shall be as per approved make in the tender.

10

-

341300.25

... More
Supply - Chittoor

-

-

-

... More
Supply of 40 mm OD HDPE pipe as per tender specifications

0.25

-

16343.88

... More
Supply of OFC Jointing kits as per tender specifications

10

-

83768.2

... More
Supply of full range (upto 8 feet) RF iD Disk type Electronic Markers as per tender specifications

10

-

21440.6

... More
Supply Patch Cord (OS2, Duplex, LC-LC / SC-SC / LS-SC connectors, single mode, 5/10/15/20/30 Meters length) as per tender specificat ions

5

-

8222.3

... More
Supply of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications.

10

-

121374.8

... More
Supply of wall mounted Fibre Termination Box (FMS) as per tender specifications

2

-

29988.52

... More
Services - Chittoor

-

-

-

... More
Laying of HDPE pipe (excluding blowing of OFC) in mainline pipe trench at the bottom in all types of soil (including roads, canals, rivers, nullahs, water course crossings, submerged crossings, saltpan areas etc.) including supply and installation of suitable stra ps for strapping the HDPE duct with mainline pipe for anti buoyancy, installation of HDPE duct accessories such as plastic couplers , end caps, end plugs, cable sealing plugs, supply and installation of warning tape, consumable guide rods, HDPE jointing, inspecti on of HDPE joints, testing the installed HDPE duct by blowing "mandrel" with compressed air, pressure testing the HDPE pipe after l ayi ng as per procedure and performing all work as per drawings, specifications and instruction of the Engineer-in-charge/ Site Engi neer and provisions of the contract document for making the duct ready in all respect for OFC blowing. The job includes transportat ion, loading and unloading of HDPE ducts in nominal length of 1000 meters and duct accessories such as couplers, end caps, end seali ng pl ugs etc. to various sites along the entire ROW / HDD crossing locations as per specifications and directions of Engineer-in-ch arge/ Site Engineer

0.25

-

2616.06

... More
Trenching for laying of HDPE in Independent trench Excavation in unpaved areas of earth in work sites for conventional cable trenche s for a depth upto 1.5 metres including shoring, strutting etc. (if necessary), backfilling the trench, as directed by Engineer-in- c harge/ Site Engineer, including all labour and materials complete as per drawings and tender specifications

75

-

20178

... More
OTDR testing from both ends of optical fiber cable for fault identification. (rates are OTDR per fiber from both side basis).

60

-

4912.81

... More
Transportation (loading and unloading) of Owner supplied unarmoured Optical fibre cable (OFC) to various sites along Right of Way (R OW), pre laying testing of each cable drum for each fibre as per the scope, specifications and directions of Engineer-in-charge/ Site Engineer

0.25

-

4099.03

... More
Splicing of OFC at site including transportation of OFC cable from IOCL store- to the site and OTDR testing after Splicing to check confirmity of splicing wthin specified limit as per teder . However, Supply of OFC cable shall be in scope of IOCL. (rates are to be quoted on per fiber basis).

120

-

75763.08

... More
Blowing of OFC through laid HDPE, post installation testing of OFC for each fibre for drum laid & maintaining OTDR traces as per the scope, specifications and directions of Engineer-in-charge/ Site Engineer

50

-

2360

... More
Installation of OFC jointing kits as per drawings, specifications and directions of Engineer-in-charge/ Site Engineer

10

-

65136

... More
Installation of RF iD type Electronic Markers as per tender specifications. The job includes configuration & programming of the Elec tronic markers to write information data as per directions of Engineer-in-charge/ Site Engineer.

10

-

5321.8

... More
Installation of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications, drawings and directions of Engineer-in -charge/ Site Engineer.

10

-

18797.4

... More
Installation of wall mounted Fibre Termination Box (FMS) as per tender specifications and directions of Engineer-in-charge/ Site Eng ineer

2

-

14771.24

... More
Mobilization charge for each restoration site per instance

5

-

11308.47

... More
"Laying of armoured / unarmoured cables (control / signalling/ Triad/ LT cable/OFC etc.) and installation / pulling of cables of all type in trenches, in cable racks, in trays, in protective pipes, poles, columns, in conduits, in panels, in buildings, walls, ceili ngs, and on structures etc.; including the supply and installation of all required materials such as fixing clamps, screws, cab le s traps, tags etc. as required (other than the supply of the conduits, cables, pipes, cable racks, trays, poles, structures and pa nel s) complete in all respect,as per specifications,drawings and directions of the SiteEngineer, including cost of all labour, tools , consumable materials etc. and cutting the cables in required lengths Note: Outer diameter between 20 to 30 mm"

200

-

21523.2

... More
Composite - Chittoor

-

-

-

... More
Laying of HDPE conduit and blowing of OFC cable inside the SV/MOV premises along the boundary wall, line item includes supply & inst allation of suitable clamps , connectors, fixture, corner bends, tools & tackles (comprising of anchor bolts/nuts/accessories etc) r equired for OFC entry inside SV/MOV loctaionalong the boundary wall by clamping of HDPE conduit at a height of 1 meter above the f in ished ground level and extending it along the length of boundary wall at 1 meter height upto the transition pit inside SV/RCP bui ldi ng as per attached drawing no. STD-793-00. The line item includes all sevices required for blowing of OFC cable iin HDPE conduit ins ide the MOV/SV loctaion as per STD - 793 drawing.

50

-

2360

... More
"Design, detailed engineering, installation of OFC conduit at specified minimum depth across River/ water bodies (canal/ drain/ nall a, marshy area etc.)/ Highway (NH/SH/Expressways) /Railways/ congested areas etc. by Horizontal Directional Drilling (HDD) method: # Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilisation & de-mobilisation at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arr anging the required land for site preparations and execution of, but not limited to, the following works in accordance with the spec ifications, drawings and as per all provisions of the contract document and instructions of the Owner; # Interpretation of data of h ydrological / geo-technical surveys furnished by the Owner (if any), carrying out fresh topographic survey of the crossing location & developing new profile drawing for the crossing location, carrying out additional surveys required for collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparation of all necessary constructio n drawings for approval of the Owner as per the provisions of contract document, preparation of detailed construction method stateme nt and design analysis; # Complete site preparation including arranging of additional required land beyond ROW provided by Owner, se tting up of fabrication yard, preparation of temporary arrangement for pipe stringing, launching etc.; # Pre-construction surveys an d collection of all necessary data related to site, underground utilities etc.; # Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC, # Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC; # C arrying out air cleaning of the complete pipeline string; # Installation of the OFC conduit below theRiver/ water bodies (canal/ dra in/ nalla, marshy area etc.)/ Highway (NH/SH/Expressways) /Railways/ congested areas etc. by single horizontal directional drilling operation to the correct profile as per the approved drawings in different soil stata at site. # Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc.; # Transportation of surplus Owner-supplied OFC cable/materials to the to the Owner's designated storage location; # Preparation of As-built drawings and other records etc.; # All other works not specif ically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and constructi on method statement, leading to successful completion of the works; Note : 89 mm OD (Normal)"

50

-

447591.11

... More
Supply, erection and installation of GI Pipe of 100 mm nominal bore medium Class B as per IS1239 subject to owner's approval includi ng the supply & installation of all necessary pipe fittings such as bends, sockets, elbows, tees etc. bending, threading, clamping, plugs, packings, bushing etc. as required for sub ducting HDPE duct as per directions of Engineer-in-charge/ Site Engineer includin g cost of all labour, tools, materials complete in all respects.

25

-

41005

... More
Supply and Installation of GI Pipe of 100 mm nominal bore heavy class as per IS1239, sub ducted by 40 mm OD HDPE pipe (excluding sup ply of HDPE pipe), by boring or jacking method across railway crossing, including all necessary pipe fittings, cost of arranging bor ing machine, other associated machinery, tools, tackles, skilled manpower, labour etc. job complete in every respects as per the dir ections of Engineer-in-charge/ Site Engineer. Measurement shall be done by the length of the GI pipe used in the crossings

25

-

141570.5

... More
Repair of OFC defects in existing optical fibre cable already laid along the pipeline in various stretches. The job includes locatin g OFC defects/joint losses by taking OTDR, exposing the cable by excavation/trenching in all kinds of soil including rock, repairing the cut/damaged OFC by splicing and restoring the trenches in original condition, checking , ensuring continuity of OFC with accep t able losses as per direction of site engineer/EIC. Supply and installation of all required materials for repair such as joint kit, R Fid marker (With stamping from owner's electronic marker cum locator), RCC joint box etc shall be in scope of contractor. OFC cab le if required for repair works shall be provided by owner. All the test/repair equipment such as OTDR machine, splicing machine, to ols /tackles, labour, consumable necessary for performance of work shall be arranged by the contractor. supply of joint kit, Rfid ma rker shall be as per approved make in the tender.

5

-

170650.13

... More
Supply - Bengaluru

-

-

-

... More
Supply of 40 mm OD HDPE pipe as per tender specifications

0.25

-

16343.88

... More
Supply of OFC Jointing kits as per tender specifications

10

-

83768.2

... More
Supply of full range (upto 8 feet) RF iD Disk type Electronic Markers as per tender specifications

10

-

21440.6

... More
Supply Patch Cord (OS2, Duplex, LC-LC / SC-SC / LS-SC connectors, single mode, 5/10/15/20/30 Meters length) as per tender specificat ions

5

-

8222.3

... More
Supply of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications.

10

-

121374.8

... More
Supply of wall mounted Fibre Termination Box (FMS) as per tender specifications

2

-

29988.52

... More
Services - Bengaluru

-

-

-

... More
Laying of HDPE pipe (excluding blowing of OFC) in mainline pipe trench at the bottom in all types of soil (including roads, canals, rivers, nullahs, water course crossings, submerged crossings, saltpan areas etc.) including supply and installation of suitable stra ps for strapping the HDPE duct with mainline pipe for anti buoyancy, installation of HDPE duct accessories such as plastic couplers , end caps, end plugs, cable sealing plugs, supply and installation of warning tape, consumable guide rods, HDPE jointing, inspecti on of HDPE joints, testing the installed HDPE duct by blowing "mandrel" with compressed air, pressure testing the HDPE pipe after l ayi ng as per procedure and performing all work as per drawings, specifications and instruction of the Engineer-in-charge/ Site Engi neer and provisions of the contract document for making the duct ready in all respect for OFC blowing. The job includes transportat ion, loading and unloading of HDPE ducts in nominal length of 1000 meters and duct accessories such as couplers, end caps, end seali ng pl ugs etc. to various sites along the entire ROW / HDD crossing locations as per specifications and directions of Engineer-in-ch arge/ Site Engineer

0.25

-

2616.06

... More
Trenching for laying of HDPE in Independent trench Excavation in unpaved areas of earth in work sites for conventional cable trenche s for a depth upto 1.5 metres including shoring, strutting etc. (if necessary), backfilling the trench, as directed by Engineer-in- c harge/ Site Engineer, including all labour and materials complete as per drawings and tender specifications

75

-

20178

... More
OTDR testing from both ends of optical fiber cable for fault identification. (rates are OTDR per fiber from both side basis).

60

-

4912.81

... More
Transportation (loading and unloading) of Owner supplied unarmoured Optical fibre cable (OFC) to various sites along Right of Way (R OW), pre laying testing of each cable drum for each fibre as per the scope, specifications and directions of Engineer-in-charge/ Site Engineer

0.25

-

4099.03

... More
Splicing of OFC at site including transportation of OFC cable from IOCL store- to the site and OTDR testing after Splicing to check confirmity of splicing wthin specified limit as per teder . However, Supply of OFC cable shall be in scope of IOCL. (rates are to be quoted on per fiber basis).

120

-

75763.08

... More
Blowing of OFC through laid HDPE, post installation testing of OFC for each fibre for drum laid & maintaining OTDR traces as per the scope, specifications and directions of Engineer-in-charge/ Site Engineer

50

-

2360

... More
Installation of OFC jointing kits as per drawings, specifications and directions of Engineer-in-charge/ Site Engineer

10

-

65136

... More
Installation of RF iD type Electronic Markers as per tender specifications. The job includes configuration & programming of the Elec tronic markers to write information data as per directions of Engineer-in-charge/ Site Engineer.

10

-

5321.8

... More
Installation of pre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications, drawings and directions of Engineer-in -charge/ Site Engineer.

10

-

18797.4

... More
Installation of wall mounted Fibre Termination Box (FMS) as per tender specifications and directions of Engineer-in-charge/ Site Eng ineer

2

-

14771.24

... More
Mobilization charge for each restoration site per instance

5

-

11308.47

... More
"Laying of armoured / unarmoured cables (control / signalling/ Triad/ LT cable/OFC etc.) and installation / pulling of cables of all type in trenches, in cable racks, in trays, in protective pipes, poles, columns, in conduits, in panels, in buildings, walls, ceili ngs, and on structures etc.; including the supply and installation of all required materials such as fixing clamps, screws, cab le s traps, tags etc. as required (other than the supply of the conduits, cables, pipes, cable racks, trays, poles, structures and pa nel s) complete in all respect,as per specifications,drawings and directions of the SiteEngineer, including cost of all labour, tools , consumable materials etc. and cutting the cables in required lengths Note: Outer diameter between 20 to 30 mm"

200

-

21523.2

... More
Composite - Bengaluru

-

-

-

... More
Laying of HDPE conduit and blowing of OFC cable inside the SV/MOV premises along the boundary wall, line item includes supply & inst allation of suitable clamps , connectors, fixture, corner bends, tools & tackles (comprising of anchor bolts/nuts/accessories etc) r equired for OFC entry inside SV/MOV loctaionalong the boundary wall by clamping of HDPE conduit at a height of 1 meter above the f in ished ground level and extending it along the length of boundary wall at 1 meter height upto the transition pit inside SV/RCP bui ldi ng as per attached drawing no. STD-793-00. The line item includes all sevices required for blowing of OFC cable iin HDPE conduit ins ide the MOV/SV loctaion as per STD - 793 drawing.

50

-

2360

... More
Supply, erection and installation of GI Pipe of 100 mm nominal bore medium Class B as per IS1239 subject to owner's approval includi ng the supply & installation of all necessary pipe fittings such as bends, sockets, elbows, tees etc. bending, threading, clamping, plugs, packings, bushing etc. as required for sub ducting HDPE duct as per directions of Engineer-in-charge/ Site Engineer includin g cost of all labour, tools, materials complete in all respects.

25

-

41005

... More
Supply and Installation of GI Pipe of 100 mm nominal bore heavy class as per IS1239, sub ducted by 40 mm OD HDPE pipe (excluding sup ply of HDPE pipe), by boring or jacking method across railway crossing, including all necessary pipe fittings, cost of arranging bor ing machine, other associated machinery, tools, tackles, skilled manpower, labour etc. job complete in every respects as per the dir ections of Engineer-in-charge/ Site Engineer. Measurement shall be done by the length of the GI pipe used in the crossings

25

-

141570.5

... More
Repair of OFC defects in existing optical fibre cable already laid along the pipeline in various stretches. The job includes locatin g OFC defects/joint losses by taking OTDR, exposing the cable by excavation/trenching in all kinds of soil including rock, repairing the cut/damaged OFC by splicing and restoring the trenches in original condition, checking , ensuring continuity of OFC with accep t able losses as per direction of site engineer/EIC. Supply and installation of all required materials for repair such as joint kit, R Fid marker (With stamping from owner's electronic marker cum locator), RCC joint box etc shall be in scope of contractor. OFC cab le if required for repair works shall be provided by owner. All the test/repair equipment such as OTDR machine, splicing machine, to ols /tackles, labour, consumable necessary for performance of work shall be arranged by the contractor. supply of joint kit, Rfid ma rker shall be as per approved make in the tender.

5

-

170650.13



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.