Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Hindu Religious Institutions And Charitable Endowments - HRICE Tender

Works
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date11 Mar 2024
Closing Date9 Apr 2024
Tender Amount₹ 2,40,38,000 
Notes
Download

Costs

Summary

Renovation Of 7 Theertha Kulangal

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Tender Documents of Special Attention and instructions to tenderers, Tender form and conditions, Tender Notice, Schedule A, Extract of Amedment, Special Condition, Schedule B, Schedule C with General Condition of Contract
Bill of Quantites(BOQ)
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.

145.37

-

-

... More
Cement concrete 1:5:10 mix using 40mm ISS metal and M. Sand including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

42.59

-

-

... More
Cement concrete 1:2:4 mix using 20mm ISS metal and M. Sand including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

30

-

-

... More
Manufacturing, supplying and fixing Precast Reinforced Cement Concrete pillar of following thickness in RCC 1:2:4 of size 2.10 m long 0.15 m width and 0.15m thick (one cement, two Crushed stone M-Sand and four aggregates), using following HBGS jelly excluding cost of reinforcement steel in position, including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed.

163

-

-

... More
Cement Concrete 1:3:6 (One Cement, Three sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)

73.44

-

-

... More
Supplying and Filling of gravel packing for revetment Thick layers well rammed & consolidated, including watering, complying with std.specification etc complete

414

-

-

... More
Rough stone Dry Packing using new rough stones including cost of conveyance of all materials and labour charges etc., complete

1070

-

-

... More
Pointing for rough stone revetment/masonry revetment using cm 1:3 including labour charges etc complete the std specification.

5992

-

-

... More
Fixing and tying of Chain Link Fencing using Chain Link of Size 2''X2'' - 10 gauge Galvanised Iron Wire with Precast piller, Horizontally and Vertically tying with G.I barbed wire etc., Complete Complying with Standard Specifications and as Directed by the Departmental Officers.

585

-

-

... More
UNNAMALAI AMMAN THEERTHA KULAM(Compund wall)

-

-

-

... More
Earth work excavation open excavation for foundation in all soils except hard rock requiring blasting to full depth with intital lead of 10 m and lift 2 m etc complete.

31

-

-

... More
Plain cement concrete 1:5:10 using 40mm HBG metel as foundation concrete including dewatering wherever necessary and laid in layers of not more than 15cm. thick complying with std specification.

3.61

-

-

... More
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).

-

-

-

... More
In foundation and basement

7.65

-

-

... More
For above basement

1.89

-

-

... More
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)

-

-

-

... More
Sub structure

47.96

-

-

... More
Super structure

32.84

-

-

... More
Brick Work in Cement Mortor 1 : 5 mix using Country Bricks of size 8 3/4 x 4 1/4 x 2 3/4 and M.Sand inc luding cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

-

-

-

... More
For ground floor

12.44

-

-

... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)For ground floor

1.72

-

-

... More
Supplying and fixing MS grill including the cost and conveyance of all materials and fixing in position including priming coat etc complete.

1116

-

-

... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc

125.74

-

-

... More
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of Primer paint including cost of all materials and labour charges etc complete

126

-

-

... More
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)

47.88

-

-

... More
NIRUTHIKULAM

-

-

-

... More
Clearing the light jungle clearance etc complete the std specification. W-0002

285

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete cum. 52.35 W-0086

397.59

-

-

... More
Earth work excavation and depositing on bank with intial lead and lift in all clasuses of soil such as Hard Gravely soil, Gravely soil except Hard Rock requiring Blasting etc complete as per SS20B for narrow foundation.

223

-

-

... More
Cement concrete 1 : 5 : 10 mix using 40mm ISS metal and M. Sand including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

44.66

-

-

... More
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete

401.4

-

-

... More
Column

229.86

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal and M. Sand including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.

181.4

-

-

... More
Grouting Revetment to 23 cm depth with Cement Cocrete 20 mm broken Stone in Cement Mortar 1 : 5 and Pointing with Cement Mortar 1 : 4 etc complete

270

-

-

... More
Painting Two Coats with Cement Paint Two coats including cost and conveyance of all materiales and labour charges etc complete.

271.82

-

-

... More
Cement Concrete 1 : 2 : 4 mix using 40mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification

19.42

-

-

... More
Plastering with Cement Mortor 1:3,20 mm thick including cost and conveyance of all materials and labour charges including curing etc., complete complying with standard specification as directed by the departmental officers

25.02

-

-

... More
Dismentaling the extisting damaged Brick work in cement motor labouar charges only etc., complete.(SOR W-0015)

22.05

-

-

... More
Filling in the basement filling M.Sand including cost and conveyance to the site and all labour charges for filling as per standard specifications

12

-

-

... More
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).'Supplying and fixing in position best approved of ISI quality of 110 mm dia PVC Rain water Down Fall pipes having a working pressure of 4 kg / sq.cm including cost of necessary PVC shoe, PVC bend, C.I. gratings of required dia. and special clamps, brass screws, nails etc., and fixing of cast iron gratings at juction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cost of removable iron grating. The PVC pipe shall be fixed on wall with special type of clamps. Special type "U" clamp at the centre of the pipe line shall be fixed in addition to those for more than 3.0M pipe length complying with standard specification.

-

-

-

... More
Substructure

38.79

-

-

... More
Superstructure

14

-

-

... More
Supplying, Fabricatung and placin g in position of RTS or MS rod for all reinforced cement concrete works as per design given including cost of steel and binding wire in all floors etc,complete complying with standard specification

5.27

-

-

... More
Brick Work in Cement Mortor 1: 6 mix using Country Bricks of size 22 x 11 x 7 cm including cost and conveyance of all materials and labour charges etc complete

76

-

-

... More
Plastering with Cement Mortor 1:5,12mm thick including cost and conveyance of all materials and labour charges including curing etc., complete complying with standard specification as directed by the departmental officers

684

-

-

... More
Suplying and Fixing of Mild Steel Grill Structural Steel Work including cost of materiales and labour charges etc complete.

5340

-

-

... More
Painting Two Coats with approved Exterior Emulsion over one coat of Primer Coat over plastered wall surface , ceiling and other new surface including cleaning , preparing the surface,curing,scaffolding charges etc, complete.

683.2

-

-

... More
Painting Two Coats over Iron work including cost of paint and Labour charges etc complete

267

-

-

... More
SANI THEERTHAM

-

-

-

... More
Clearing the light jungle clearance etc complete the std specification.

255

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete

121.5

-

-

... More
Earth work excavation open excavation for foundation in all soils except hard rock requiring blasting to full depth with intital lead of 10 m and lift 2 m etc complete.

15.56

-

-

... More
Plain cement concrete1:5:10 using 40mm HBG metel as foundation concrete including dewatering wherever necessary and laid in layers of not more than 15cm. thick complying with std specification.

2.61

-

-

... More
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).'Supplying and fixing in position best approved of ISI quality of 110 mm dia PVC Rain water Down Fall pipes having a working pressure of 4 kg / sq.cm including cost of necessary PVC shoe, PVC bend, C.I. gratings of required dia. and special clamps, brass screws, nails etc., and fixing of cast iron gratings at juction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cost of removable iron grating. The PVC pipe shall be fixed on wall with special type of clamps. Special type "U" clamp at the centre of the pipe line shall be fixed in addition to those for more than 3.0M pipe length complying with standard specification.

-

-

-

... More
In foundation and basement

4.92

-

-

... More
For above basement

1.22

-

-

... More
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)

-

-

-

... More
Substructure

31.67

-

-

... More
Super Structure

21.25

-

-

... More
Brick Work in Cement Mortor 1: 6 mix using Country Bricks of size 22 x 11 x 7 cm including cost and conveyance of all materials and labour charges etc complete.

-

-

-

... More
For ground floor

10.17

-

-

... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)

0.61

-

-

... More
Supplying and fixing MS grill including the cost and conveyance of all materials and fixing in position including priming coat etc complete.

353.64

-

-

... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc

103.36

-

-

... More
Pointing for rough stone revetment/masonry revetment using cm 1:1.5 including labour charges etc complete the std specification.

950

-

-

... More
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of Primer paint including cost of all materials and labour charges etc complete

407

-

-

... More
Painting two coats over Old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete(with one coat primer)

67

-

-

... More
Painting New iron works with two coats of best approved first quality and colour of synthetic enamel paint over one coat of red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)

19.2

-

-

... More
SANI THEERTHAM(OUTLET ABSTRACT)

-

-

-

... More
Clearing the light jungle clearance etc complete the std specification.

9

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete

22.5

-

-

... More
Plain cement concrete1:5:10 using 40mm HBG metel as foundation concrete including dewatering wherever necessary and laid in layers of not more than 15cm. thick complying with std specification.

3

-

-

... More
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).

-

-

-

... More
Foundation and basement

10.04

-

-

... More
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)

-

-

-

... More
Substructure

30

-

-

... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)

1

-

-

... More
Providing Gronolothick Floor Finish 25 mm Thick in Cement Concrete 1 : 2 : 4 mix by using 10 - 12 mm iss hbg chips and M.Sand including cost and conveyance of all materials and labour charges etc complete

10.4

-

-

... More
KRISHNAR KULAM

-

-

-

... More
Clearing the light jungle clearance etc complete the std specification.

192

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

216.6

-

-

... More
Earth work excavation open excavation for foundation in all soils except hard rock requiring blasting to full depth with intital lead of 10 m and lift 2 m etc complete.

138.4

-

-

... More
Cement concrete 1:5:10 mix using 40mm ISS metal and M. Sand including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

27.56

-

-

... More
Manufacturing, supplying and fixing fixed grills made out of 40x40x6mm at 3.5 Kg/m are used as the outer frames. MS Angles of size 40x40x6mm at 2.6Kg/m is welded intact withouter frame from 1/3 bottom portion for fixing CR sheet & MS grill 18 GCR sheet is laid as panel & welded intact for 1/3 bottom portion. MS Flat are provided as per design 2/3 top Portion is provided with MS grill of 15Kg/M2 as panel. The design & style for the upper grill work should be approved by the departmental Officers. MS Flat 18 x 5mm at 0.7 Kg/m is welded as additional stiffeners at the rear side of the CR sheet panel. 2Nos of hold fasts of 120mm in length made out of 40x40x6mm MS Angle spliced at the ends are welded to one side of the outer frame & the other side of the outer frame suitable arrangements should be made to be fixed rigidily with adjoining door/ window outer frame. All members are given one coat of red oxide primer as directed by the departmental officers. The rate includes cost of materials, labour charges, transportation, taxes & all other incidental charges etc., complete

2880

-

-

... More
Supplying and Filling of gravel packing for revetment thick layers of well rammed & consolidated, including watering, complying with std.specification etc complete.

64.49

-

-

... More
Rough Stone Dry Packing New stones including cost of stone and labour charges etc complete.

152.35

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal and M. Sand including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

34.83

-

-

... More
Grouting Revetment to 23 cm depth with Cement Cocrete 20 mm broken Stone in Cement Mortar 1 : 5 and Pointing WITH Cement Mortar 1 : 4

518.6

-

-

... More
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).

-

-

-

... More
Foundation and basement

24.98

-

-

... More
Above basement

5.33

-

-

... More
Supplying, Fabricatung and placin g in position of RTS or MS rod for all reinforced cement concrete works as per design given including cost of steel and binding wire in all floors etc,complete complying with standard specification

3.03

-

-

... More
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)

-

-

-

... More
For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom slab of RCC boxing, etc.

302.21

-

-

... More
Above basement

92.74

-

-

... More
Brick Work in Cement Mortor 1 : 5 mix using Country Bricks of size 8 3/4 x 4 1/4 x 2 3/4 and M.Sand inc luding cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

33.12

-

-

... More
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.

371.17

-

-

... More
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.

371

-

-

... More
SURYA THEERTHA KULAM

-

-

-

... More
Clearing the light jungle clearance etc complete the std specification.

315

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

608

-

-

... More
Earth work excavation open excavation for foundation in all soils except hard rock requiring blasting to full depth with intital lead of 10 m and lift 2 m etc complete.

63.41

-

-

... More
Cement concrete 1:5:10 mix using 40mm ISS metal and M. Sand including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

9.8

-

-

... More
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).

-

-

-

... More
Foundation and basement

23.21

-

-

... More
Above basement

5.89

-

-

... More
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)

-

-

-

... More
Foundation and basement

69.13

-

-

... More
Above basement

102.4

-

-

... More
Supplying and Fabrication of Steel including cost conveyance of Steel , Binding wire and labour charges for cutting ,bending ,tieing in position as required

2.91

-

-

... More
Brick Work in Cement Mortor 1 : 5 mix using Country Bricks of size8 3/4 x 4 1/4 x 2 3/4 and M.Sand inc luding cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

36.45

-

-

... More
Pointing for rough stone revetment/masonry revetment using cm 1:3 including labour charges etc complete the std specification.

1230.4

-

-

... More
Painting two coats of old plastered wall surface with ready mixed Exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt etc., complete complying with standard specification.

152.46

-

-

... More
Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete(with one coat primer)

33.45

-

-

... More
Supplying and fixing MS grill including the cost and conveyance of all materials and fixing in position including priming coat etc complete.

4719

-

-

... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc

267.78

-

-

... More
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.

267.78

-

-

... More
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)

235.95

-

-

... More
PALANI ANDAVAR THEERTHAM

-

-

-

... More
Clearing the light jungle clearance etc complete the std specification.

342

-

-

... More
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

1128.75

-

-

... More
Earth work excavation open excavation for foundation in all soils except hard rock requiring blasting to full depth with intital lead of 10 m and lift 2 m etc complete.

152.61

-

-

... More
Cement Concrete 1 : 5 : 10 mix using 40mm ISS HBG stone jelly and M Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification

29.31

-

-

... More
Supplying and Erection centering for sides and soffits including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, StairCase Waist Slablanding slab landing beam Canopy etc in all floors with all cross Bracings using mild steel sheets of size 90cm x 60cm and 10BG stiffened withmild steel angles of size 25mmx3mm for boarding laid over country wood joists of size 10cmx6.50cm spaced at about 90cm centre to centre and supported by Casurina props of 10cm to 13cm dia spaced at 75cm centre etc, complete and as directed.

-

-

-

... More
For Below Ground Level

302.74

-

-

... More
For Column

126.86

-

-

... More
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).

-

-

-

... More
For upto Basement

50.27

-

-

... More
For Super Structure

7.37

-

-

... More
Brick Work in Cement Mortor 1 : 6 mix using Country Bricks of size8 3/4 x 4 1/4 x 2 3/4 and M.Sand inc luding cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete

29.03

-

-

... More
Gravel Backing for Revetment including cost and conveyance of Gravel and labour charges for working up with water to Plastic state and complete etc complete .

80.64

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal and M. Sand including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete .

31.6

-

-

... More
Rough Stone Dry Packing New stones including cost of stone and labour charges etc complete.

123.65

-

-

... More
Supplying and fixing MS grill including the cost and conveyance of all materials and fixing in position including priming coat etc complete.

5103.2

-

-

... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc

326.04

-

-

... More
Grouting Revetment to 23 cm depth with Cement Cocrete 20 mm broken Stone in Cement Mortar 1 : 5 and Pointing with Cement Mortar 1 : 4 etc complete

537.6

-

-

... More
Painting two coats over New iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete(with one coat primer)

255.16

-

-

... More
Painting old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)

23.27

-

-

... More
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of Primer paint including cost of all materials and labour charges etc complete

326.04

-

-

... More
VARUNATHEERTHAM

-

-

-

... More
Clearing the light jungle clearance etc complete the std specification.

216

-

-

... More
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete cum. 52.35 W-0086

81

-

-

... More
Earth work excavation open excavation for foundation in all soils except hard rock requiring blasting to full depth with intital lead of 10 m and lift 2 m etc complete.

90.17

-

-

... More
Plain Cement Concrete 1 ; 5 : 10 (One cement, five Sand and ten hard broken granite stone jelly) using 40mm HBG metel as foundation concrete including dewatering wherever necessary and laid in layers of not more than 15cm. thick complying with std specification.

20.07

-

-

... More
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).

-

-

-

... More
Foundation and basement

14.04

-

-

... More
in Ground level

3.67

-

-

... More
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)

-

-

-

... More
Below Ground level

197.87

-

-

... More
For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom slab of RCC boxing, etc.

63.76

-

-

... More
Brick work in following Cement Mortar 1 : 6 using best quality of Second Class Table Moulded Chamber Burnt Bricks 9" x 4-1/2" x 3" for foundation and basement including curing, etc., complete complying with standard specifiction.

-

-

-

... More
For ground floor

29.47

-

-

... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)

2.31

-

-

... More
Gravel Backing for Revetment including cost and conveyance of Gravel and labour charges for working up with water to Plastic state and complete etc complete .

50.4

-

-

... More
Cement concrete 1:3:6 mix using 40mm ISS metal and M. Sand including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete .

30.78

-

-

... More
Rough Stone Dry Packing New stones including cost of stone and labour charges etc complete.

77.28

-

-

... More
Supplying and fixing MS grill including the cost and conveyance of all materials and fixing in position including priming coat etc complete.

1024.92

-

-

... More
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc

289.01

-

-

... More
Grouting Revetment to 23 cm depth with Cement Cocrete 20 mm broken Stone in Cement Mortar 1 : 5 and Pointing with Cement Mortar 1 : 4 etc complete .

336

-

-

... More
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of Primer paint including cost of all materials and labour charges etc complete

300.39

-

-

... More
Painting two coats over New iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete(with one coat primer) one coat of zinc chromate

51.25

-

-

... More
SUB TOTAL

-

-

-

... More
GST 18 %

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.