Hindu Religious And Charitable Endowments Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Hindu Religious And Charitable Endowments - HRCE Tender
Civil And Construction
Excavation
Eprocure
Opening Date25 Apr 2025
Closing Date13 May 2025
Tender Amount₹ 4,15,40,000
AI Insights
Technical
Technical
Class Of Bidder
... View More
The class eligibility requirement to bid or participate in this tender is that the bidder must be a "Register Contractor in Tamilnadu Government Department / State Government under takings and Registration alive and Appropriate class contractor", however the specific class is not mentioned.
Technical Capacity
... View More
The required prior work experience for the bidder includes having a minimum experience of major building work. The bidder should furnish year-wise details of their previous experience to assess their eligibility. For works valued above Rs.1,00,000/- and up to Rs.5.00 lakhs, and for works valued above Rs.5.00 lakhs and up to Rs.10.00 lakhs, the bidder should have experience, but specific details are not provided in terms of percentage or amount of similar works completed. For works valued above Rs.10.00 lakhs and up to Rs.25.00 lakhs, the bidder should have one B.E., (Civil) with 3 years experience plus one Diploma holder in Civil Engineering, or equivalent experience. For works valued above Rs.25.00 lakhs and up to Rs.50.00 lakhs, the bidder should have one B.E., (Civil) with 3 years experience plus two Diploma holders in Civil Engineering, or equivalent experience. For a specific work valued at Rs.415.40 Lakhs, the bidder should have one B.E., (Civil) with 3 years experience plus three Diploma holders in Civil Engineering, and one B.E.Electrical with 3 years experience, or equivalent experience. The value and percentage of similar works completed are not explicitly mentioned. However, it is mentioned that the bidder should have completed works of similar nature, and the amount of such works should be substantial enough to demonstrate their capability to execute the contract. Additionally, the bidder should provide details of the works completed, including the value and percentage of works completed, to enable the assessment of their experience and capability. It is also mentioned that if the overall quoted amount of the tender is less than 5 to 15% of the value put to tender, the contractor shall pay an additional security deposit of 2% of the estimated value. If the tender discount exceeds 15% to 20%, the contractor shall pay an additional security deposit of 50% of the difference between the quoted amount and estimate amount.
Costs
EMD
₹ 2,18,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Renovation And Construction Of 5 Tier Rajagopuram To Arulmigu Karaikandiswarar Thirukoil At Kanji Village
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HRCE_551312_1Tender No
02/2025-2026Tender Authority
Hindu Religious And Charitable Endowments ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Tender Documents of special attention and instructions to tenderers, Tender form and condition, Tender Notice, Schedule A, Extract of Amendment, Special Conditions, Schedule B, Schedule C with General conditions of Contract
BOQ Items
... More
Scraping the old plastering surface of vimanams/ wall carefully including isolated bricks or brick work without damaging the vari vargams, racking out the joints, cleaning the surfaces with water including all working in heights, hire charges for special tools, brushes etc complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : Special)
1995
-
-
... More
Painting two coats of newly plastered wall surface withWater based Exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.(The make ,quality , Shade and colour of paint should be got approved by the Executive engineer before use of work)(TNBP. Specification.No : similar to 66&66A)
2180
-
-
... More
Restoration by providing herbal water wash(Combination of Venthayam powder 20%, Siyakai Powder 10%, Arapu powder 5%, Boonthi kottai powder 50%, Arugampul powder 3%, Nannari ver powder 3%, Vettiver powder 3%, Korai kizhangu powder 3%, and sembaruthi leaf powder 3% total 100%) are used for removel of lime wash on stone and oil smudge) and approrimats methodology to restore the originalities of the existing granite structure inclusive of hire charges scaffolding arrangements conveyance charges for tools & plants and machinaries to the workship spot and cleaning the site after completion of work etc complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : Special)
11955
-
-
... More
Pointing with lime mortar 1:1.5 ( one of lime and one and half of M. sand) with special grinding lime mortar using with Jaggary ,Galnut as directed including all labour charges, tools and plants neat finishing curing etc complete compling the standard specification.(The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 60 & special )
2145
-
-
... More
Supplying & Paving flooring with cut stone of size 600 mm X 600 mm and another sizes suitable for site conditions with machine cut edges and not less than 100mm thick and fully dressed as directed by the departmental officers,and set in special grinding Lime morter 1:1.5 ( One of lime and One and Half of M.sand )using freshly burnt lime (cao not less than 75 %)with jaggaery,galnut as directed and pointing with same special grinding Lime morter 1:1.5 ( One of lime and One and Half of M.sand ) including cost and conveyance of all materials etc., complete Complying with standard specifications. and directed by the departmental officers (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 4&35 and special )
-
-
-
... More
Single line fully dressing stones
1262
-
-
... More
Three line fully dressing stones
83
-
-
... More
Earthwork excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering, baling out water wherever necessary, refilling the foundation with excavated earth and depositing the surplus earth within compound in places shown by the departmental officers with an initial lead of 10 metre and initial lift of 2 metre and clearing and leveling the site etc., complete complying with standard specification and as directed by the departmental officers. SS20 B.(TNBP. Specification.No : 23 )
130
-
-
... More
Supplying and filling in foundation, basement, etc with filling crushed stone sand ( M.Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 24&25 )
148
-
-
... More
Cement Concrete 1:5:10 (One of Cement, Five of crushed stone sand and Ten of hard granite broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 28 )
13
-
-
... More
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). (TNBP. Specification.No : 30)
-
-
-
... More
a)For foundation and basement
50
-
-
... More
b) for Super Structure(Ground floor)
114
-
-
... More
Brick masonry Cement Mortar 1:5 ( One cement and five of sand ) using best quality country bricks of size 83/4"x41/4"x23/4" including all varivargams, mould sthambams mokopathrams, koodu, Nasi and all ornamental brick work complete, all pancharams Agarais, Karanakoodu, etc., forming core walls of Rajagopuram / Vimanam complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc.complete complying with standard specifications and as directed by the departmental officers.(TNBP. Specification.No : 31-C and special )
13
-
-
... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)(TNBP. Specification.No : 86&86A)
16.5
-
-
... More
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)(TNBP. Specification.No : 72,86)
-
-
-
... More
a)For column
233
-
-
... More
b) For below Ground level
136
-
-
... More
c) For Plain surfaces
595
-
-
... More
Plastering the surface of walls with Cement Mortar 1:5 (One cement and Five plastering sand), 12mm thick in all floors including neat finishing curing etc., complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 56&57)
87
-
-
... More
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers (TNBP. Specification.No : 52&53)
480
-
-
... More
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1.5( One of lime and One and Half of sand ) with special grinding with gallnut jaggary etc complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with special grinding Lime Mortor1:1.5( One of lime and One and Half of sand ) and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. etc.complete complying with standard specifications and as directed by the departmental officers. (TNBP. Specification.No : Special) (Height upto 25'0") (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)
3736
-
-
... More
Painting with multicolour (Panchavarnam) best quality water exterior Emulsion paints complete for the Vimanams/Gopurams, inculding cost and conveyence of all materials, labour charges inculding Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area. etc., complete complying with standard specification and as directed by the departmental officers (TNBP. Specification.No : 66 & 66-A& special)
3736
-
-
... More
Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in lime morter 1:1.5 ( one of lime and one and half of M.sand ) finishing the same with lime morter 1:1.5 ( one of lime and one and half of M.sand ) bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder) (Sudhai Size 1'-6" to 2'-6") (TNBP. Specification.No : Special)
21
-
-
... More
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete Complying with standard specifications. and directed by the departmental officers (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 44 )
27
-
-
... More
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in special grinding Lime Mortar 1:1.5 (One of Lime and One & half of M.sand)12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers.(The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 44-H)
703
-
-
... More
Dismantling Brick wall in lime mortar and clearing carefully away., etc complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 16&17)
20
-
-
... More
Removal of the Pavukkal and stacking the same as directed at the site etc., complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 18 )
22
-
-
... More
Earthwork excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering, baling out water wherever necessary, refilling the foundation with excavated earth and depositing the surplus earth within compound in places shown by the departmental officers with an initial lead of 10 metre and initial lift of 2 metre and clearing and leveling the site etc., complete complying with standard specification and as directed by the departmental officers. SS20 B.(TNBP. Specification.No : 23 )
430
-
-
... More
Supplying and filling in foundation, basement, etc with filling crushed stone sand ( M.Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 24&25 )
51
-
-
... More
Refilling with excavated earth other than crushed stone sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 24&25 )
36
-
-
... More
Cement Concrete 1:5:10 (One of Cement, Five of crushed stone sand and Ten of hard granite broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 28 )
23
-
-
... More
Random Rubble masonry work with using machene mixing Cement Mortar1:5( One of cement, five of M.sand) mix using selected rough stones and Bond stones in foundation and basementincluding simulatenous fresh ppointing and including dewatering wherever necessary proper setting,curing,etc., complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 35-H )
-
-
-
... More
Foundation and Basement
130
-
-
... More
Super Structure
105
-
-
... More
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). (TNBP. Specification.No : 30)
-
-
-
... More
a)For foundation and basement
60
-
-
... More
b) Upto III rd nelai lintel (First Floor)
7
-
-
... More
c) Upto III rd nelai roof (Third Floor)
5
-
-
... More
d) Upto III rd nelai roof (Fourth floor)
2
-
-
... More
b) Upto III rd nelai roof (Fifth Floor)
1
-
-
... More
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)(TNBP. Specification.No : 72,86)
-
-
-
... More
a)For grade beam
30
-
-
... More
b) For plain surface
56
-
-
... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)(TNBP. Specification.No : 86&86A)
7.5
-
-
... More
Supply of cut stone roughly dressed ,shaped quality and required size including cost of conveyance charge charges etc., complete complying with standard specifiction.and as directed by the departmental officers(TNBP. Specification.No : special and similar to 35)
-
-
-
... More
For wall (upto 5 feet stone)
170
-
-
... More
For Pavukkal & Uthiram (upto 14 feet stone )
27
-
-
... More
Supplying & Paving flooring with cut stone of size 600 mm X 600 mm and another sizes suitable for site conditions with machine cut edges and not less than 100mm thick and one line fully dressed stones as directed by the departmental officers,and set in special grinding Lime morter 1:1.5 ( One of lime and One and Half of M.sand )using freshly burnt lime (cao not less than 75 %)with jaggaery,galnut as directed and pointing with special grinding Lime morter 1:1.5 ( One of lime and One and Half of M.sand ) including cost and conveyance of all materials etc., complete Complying with standard specifications. and directed by the departmental officers (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 4&35 and special )
37
-
-
... More
Providing Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn/PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work. etc complete complying with standard specification and as directed by departmental officers. (TNBP. Specification.No : Special)
-
-
-
... More
(Ht Upto 25'-0")
252
-
-
... More
(Ht Upto 75'-0")
462
-
-
... More
Ornamental Brick work in combination mortar 1:1:4( One of cement ,one of lime and four of M.sand ) using country bricks 8 3/4"X4 1/4"X2 3/4" all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.) (TNBP. Specification.No : 31& special)
5510
-
-
... More
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1.5( One of lime and One and Half of sand ) with special grinding with gallnut jaggary etc complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with special grinding Lime Mortor1:1.5( One of lime and One and Half of sand ) and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. etc.complete complying with standard specifications and as directed by the departmental officers. (TNBP. Specification.No : Special) (Height upto 25'0") (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)
2275
-
-
... More
Painting with multicolour (Panchavarnam) best quality water exterior Emulsion paints complete for the Vimanams/Gopurams, inculding cost and conveyence of all materials, labour charges inculding Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area. etc., complete complying with standard specification and as directed by the departmental officers (TNBP. Specification.No : 66 & 66-A& special)
2275
-
-
... More
Plastering the surface of walls with Cement Mortar 1:5 (One cement and Five plastering sand), 12mm thick in all floors including neat finishing curing etc., complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 56&57)
105
-
-
... More
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers (TNBP. Specification.No : 52&53)
56
-
-
... More
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)(TNBP. Specification.No : similar to 39-G)
30
-
-
... More
Painting two coats of newly plastered wall surface withWater based Exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.(the make ,quality and colour of paint should be got approved by the Executive engineer before use of work)(TNBP. Specification.No : similar to 66&66A)
161
-
-
... More
Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in lime morter 1:1.5 ( one of lime and one and half of M.sand ) finishing the same with lime morter 1:1.5 ( one of lime and one and half of M.sand ) bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder) (Sudhai Size 1'-6" to 2'-6") (TNBP. Specification.No : Special)
-
-
-
... More
a) Height of Sudhai 2'6" to 3' 6"
40
-
-
... More
b) for III th nelai (ht of sudhai 1'6" to 2'6")
60
-
-
... More
Labour charges for dressing and fixing cut stone chitravanam to viyala vari 3 line dressed on all faces set in combination mortar 1:1:3 (One of lime ,one of cement and three of m.sand) including handling charges cost of tools and fixing in position etc., complete complying with standard specification and as directed by the departmental officers(TNBP. Specification.No : special and similar to 35)
-
-
-
... More
For Chitra vanam
65
-
-
... More
For Jagathiadthistanam
106
-
-
... More
For Kandam
284
-
-
... More
For kabothaga patiyal
137
-
-
... More
For Jagathi
85
-
-
... More
For Kumuthagam
132
-
-
... More
For kandapam pattikai
85
-
-
... More
For Aswapatham
77
-
-
... More
For Sthampam
115
-
-
... More
For Kalvari
97
-
-
... More
For Kalasam
104
-
-
... More
For Kudam
93
-
-
... More
For Veerakandapothiyal
99
-
-
... More
For uthirakkal
153
-
-
... More
For Kapothagam
153
-
-
... More
For Viyalam
104
-
-
... More
For Ulvari
901
-
-
... More
For pavukkal
448
-
-
... More
For Uluthirakkal
87
-
-
... More
For Vasakkal
2025
-
-
... More
For Nasaithalai
40
-
-
... More
SUB TOTAL
-
-
-
... More
GST 18 %
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%