Highways Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date22 Feb 2024
Closing Date1 Mar 2024
Tender Amount₹ 2,22,50,000
Costs
EMD
₹ 1,23,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tn No 52 2023 24 Hdo Dt 20 02 24 Tvm Rtg
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_428719_1Bid Award Id
ViewTender No
TN No 52 2023 24 HDO Dt 20 02 24 TVM RtgTender Authority
Highways Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Plain Cement concrete in M10 grade (Nominal Mix) using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for foundation & Below sill.
-
-
-
... More
Construction of PCC Retaining wall
8.7
43369
4984.95
... More
Plain Cement concrete in M15 grade (Nominal Mix) using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for foundation & Below sill.
-
-
-
... More
Construction of RCC Retaining wall
103.22
585720
5674.49
... More
Vibrated Reinforced cement concrete of grade M25(Design Mix) using graded ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of form work, soft water, labour charges for mixing transporting, laying, and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting, etc, complete as per relevent standard specifications for Retaining Wall
-
-
-
... More
Construction of RCC Retaining wall
1188.54
12224347
10285.18
... More
Vibrated Cement concrete M20 grade (Nominal mix) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost and labour charges for formwork, soft water, labour charges for formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc, as per relevant standard specification. (For Stem of Retaining wall below Ground Level)
-
-
-
... More
Construction of PCC Retaining wall
66
455811
6906.23
... More
Vibrated Cement concrete M20 grade (Nominal mix) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost and labour charges for formwork, soft water, labour charges for formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc, as per relevant standard specification. (for Stem of Retaining wall above Ground Level)
-
-
-
... More
Construction of RCC Retaining wall
53.34
394232
7390.94
... More
Construction of PCC Retaining wall
51.32
429255
8364.3
... More
Supply and fabrication of Fe – 500 steel with high strength corrosion resistant rebar (TMT Her Grade M) required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete.
-
-
-
... More
Construction of RCC Retaining wall
44.09
4179920
94804.27
... More
Providing and fixing PVC seepage pipes of 110mm dia at 1.0 m c/c to drain the back fill behind the abutments and wings placed inclined position including cost and conveyance of all materials to worksite to worksite and labour charges for fixing, etc. complete
-
-
-
... More
Construction of RCC Retaining wall
340.4
69135
203.1
... More
Construction of PCC Retaining wall
24.76
5028
203.1
... More
Supplying and fixing 300mm wide PVC EXPANSION JOINT in the 20mm expansion gap provided in between decks over piers and in between deck and dirt wall over abutment as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc., complete
-
-
-
... More
Construction of RCC Retaining wall
56.5
33561
594
... More
Construction of PCC Retaining wall
3.72
2209
594
... More
Providing and laying of Carted Earth for Retaining wall including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental Engineers with an average lead of 5kms including compaction by Power Roller.
-
-
-
... More
Construction of RCC Retaining wall
1046.26
204794
195.74
... More
ReFilling using excavated earth laying,handling charges and filling in layers,tamping under optimum moisture content to get the maximum density by watering with all leads for water including all other incidental charges such as bailing out water if necessary forming protective bunds etc., complete for Retaining wall (Filling charges only)
-
-
-
... More
Construction of RCC Retaining wall
1367.19
53252
38.95
... More
Construction of PCC Retaining wall
122.92
4787
38.95
... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
... More
Basic cost of value put to tender as per estimate
1
-
18852269
... More
Add GST at 18%
1
-
3393408
... More
Total Value put to Tender
1
-
22245677
... More
Quoted value
1
-
-
... More
Final Quoted Value
1
-
-
... More
Add GST at 18% of Final Quoted Value
1
-
-
... More
Total Value of Contract Including 18% of GST
1
-
-
... More
Basic cost of value put to tender as per Estimate
-
18852269
-
... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements