Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date25 Oct 2024
Closing Date12 Nov 2024
Tender Amount₹ 7,28,90,000 
Notes
Download

Costs

Summary

Tn No 22 2024 25 Hdo Dt 21 10 2024 Tvm 11

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 For Grading-V Material (Filter/ Separation Layer at Bottom)

-

-

-

... More
Road A (694.06+56.26)

750.32

1764

1323654.52

... More
Road B (1555.90+28.13)

1584.03

2001

3170784.53

... More
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 For Grading-III Material (Drainage Layer at Top)

-

-

-

... More
Road A

630.96

1852

1169162.57

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper tosite, laying in uniform layers using pavers in SubBase/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Road A

1577.4

2116

3338756.39

... More
Road B

1944.87

2116

4116550.74

... More
Providing and laying Prime Coat over WBM / WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals formachinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5

-

-

-

... More
Road A

6309.6

81

513222.86

... More
Road B

7779.48

81

632860.7

... More
Providing and laying Tack Coat over WBM / WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
Road A

6309.6

18

118115.71

... More
Road B

7779.48

18

145631.87

... More
Providing and laying Tack Coat over Existing BT surface using 2Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
Road A

13320.22

26

359246.33

... More
Road B

16385.1

26

442070

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
Road A

170.17

21

3602.5

... More
Road B

35.42

21

749.84

... More
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works)

-

-

-

... More
Road A

25.46

7999

203666.76

... More
Road B

33.12

8060

266951.51

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Road A

981.48

8456

8300258.58

... More
Road B

1208.22

8456

10217771.55

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road A

594.78

10687

6356699.35

... More
Road B

726.71

10687

7766698.59

... More
Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers.

-

-

-

... More
Road A

536

26

14268.32

... More
Road B

649

26

17276.38

... More
Sub Estimate Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance using Carted Earth an average lead of 5 km.

-

-

-

... More
Road A

803.1

237

191121.74

... More
Road B

401.55

237

95560.87

... More
Supply of NP 3 class RCC 1000 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 2003 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete. MORTH No. 2900, 900.

-

-

-

... More
Road A (20.00+100.00)

120

4276

513216

... More
Road B (10.00+140.00)

150

4276

641520

... More
Hoisting and fixing of 1000 mm dia pipes proper gradient including all labour charges and all other incidental charges etc., complete. MORTH No. 2904, 2905, 2906.

-

-

-

... More
Road A (20.00+100.00)

120

266

31944

... More
Road B (10.00+140.00)

150

266

39930

... More
Dismantling the Brick / Stone Masonry in cement mortar walls under 3m high removing and disposing of the resulting materials and back filling the trenches and pits for dismantling the existing damaged culvert including all tools and plants and all labour charges etc., complete.

-

-

-

... More
Road A

31.9

283

9032.17

... More
Road B

17.69

283

5008.75

... More
Dismantling the Removal of Cut Stone Slabs / RCC Cover Slabs removing and disposing of the resulting materials and back filling the trenches and pits for dismantling the existing damaged culvert including all tools and plants and all labour charges etc., complete.

-

-

-

... More
Road A

36.53

512

18737.33

... More
Road B

19.8

512

10156.01

... More
Dismantling the Plain Cement Concrete removing and disposing of the resulting materials and back filling the trenches and pits for dismantling the existing damaged culvert including all tools and plants and all labour charges etc., complete.

-

-

-

... More
Road A

189.4

486

92086.28

... More
Road B (1.13+243.06)

244.19

486

118725.18

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation of Box Culvert.

-

-

-

... More
Road A

434.98

289

125870.16

... More
Road B

331.78

289

96007.18

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for foundation of Pipe Culvert.

-

-

-

... More
Road A

569.3

246

140343.84

... More
Road B

760.04

246

187365.06

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW Box Culvert and Wing wall.

-

-

-

... More
Road A

26.17

5966

156156.13

... More
Road B

19.58

6017

117822.65

... More
Plain Cement Concrete M10 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for Levelling course below the body wall.

-

-

-

... More
Road A

19.3

5301

102315.28

... More
Road B

24.68

5341

131829.7

... More
Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Wing wall and Parapet.

-

-

-

... More
Road A

115.83

8306

962129.15

... More
Road B

131.09

7817

1024828.85

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert.

-

-

-

... More
Road A

124.2

11840

1470617.42

... More
Road B

74.02

11791

872801.65

... More
VVibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Wing wall and Parapet. for Pipe Culvert

-

-

-

... More
Road A

191.2

8849

1691982.34

... More
Road B

242.64

8898

2159204.83

... More
Vibrated Reinforced cement concrete of grade M40 (Design mix) using 20mm and below ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Inner Crash Barrier.

-

-

-

... More
Road A

2.6

17032

44283.72

... More
Road B

1.98

17219

34093.94

... More
Supply and fabrication of STEEL grade Fe500 D for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

-

-

-

... More
Road A

8.79

95609

840501.09

... More
Road B

5.28

95609

505103.77

... More
Filling behind culvert with clean gritty gravel including cost and conveyance of Stone dust towork site including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting, tamping, ramming under optimum moisture content to obtain the maximum density and all other incidental chargesetc. complete as per standard specification.

-

-

-

... More
Road A

117.9

277

32698.39

... More
Road B

170.2

277

47203.27

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

61768315

-

... More
Add GST at 18%

1

11118297

-

... More
Total Value put to Tender

1

72886612

-

... More
Quoted value

1

-

-

... More
Final Quoted Value

1

-

-

... More
Add GST at 18% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

61768315

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.