Bhabha Atomic Research Centre Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Bhabha Atomic Research Centre - BARC Tender
Housekeeping Services
Eprocure
Opening Date12 Jan 2024
Closing DateCancelled
Tender Amount₹ 60,80,000
Costs
EMD
₹ 1,21,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BARC_790317_1Bid Award Id
ViewTender No
BARC/PRPD/NF-HCM /K- 2919/2023Tender Authority
Bhabha Atomic Research Centre ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Clearing of garbage from canteen and dumping in the pits with a lead of 500mtrs as per the direction of the EIC.
312
-
-
Clearing of the debris, inert matter, sand etc from open rain water/storm water trench/ drain all as per specifications and directions of EIC and disposal of the same with a lead of 250 mtrs.
2000
-
-
Upkeep and maintenance of lawn ground cover Climbers, shrubs etc., by watering, daily satisfactorily, weeding, cutting of thatch areas/grass trimming by bush cutter /trimmer in the lawn, hoeing up near the root zone of plants rejuvenation ,maintenance of topiary by garden shear/trimmer .,etc as per requirement in the existing landscaped areas, application of chemicals/ fertilizers to lawn/plants preparation of the area for planting of seasonal, clearing of garden waste within PRPD area as per the directions and specification of the EIC.Fertilizer and chemicals will be supplied by the department.
5733000
-
-
Clearing up of the areas by complete removal of existing grass,ground cover, shrubs, trees, inert matter, dumping the cleared materials in the area within PRPD in the said location as per the directions and specifications of the EIC.
40000
-
-
Cutting of wild growth/ground cover by bush/grass cutter and clearing the cut portion by sweeping and dumping the same in PRPD area in the said location as per the specifications and as directed by the Engineer-in-charge.
10000
-
-
Cutting of tree branches , twigs by mechanical means using tree cutter by minimum of two personnel at different heights in different locations within PRPD premises/surrounding of PRPD premises all as per the specifications and as directed by the Engineer-in-charge. .
80
-
-
Collection of cut tree branches,twigs...etc from areas at different places within PRPD site, loading & transporting in tractor/trailer, disposal of the same in dump yard or dumping in any structure made for the purpose at locations specified within IGCAR /BARCF/DAE dumpyard premises as per the specifications and as directed by the Engineer-in-charge.Note : The volume of the dumper/tractor trolley shall be reduced by 20% for voids for payment
100
-
-
Collecting up of the debris /inert matter etc in different locations, loading, transporting, unloading, leveling the same within PRPD in the said location as per the specifications and as directed by the Engineer-in-charge.Note: The volume shall be reduced by 20% to arrive at the net quantity for payment.
80
-
-
Earthwork excavation in all types of soil including concrete/hard surface/debris, filling/spreading the same in the area with a lead of 100 m as per the directions and specifications of the EIC.
100
-
-
Execution of work by Hiring JCB along with a driver/cleaner for specified works at PRP site as per the directions and specifications of the EIC.
32
-
-
Supplying and stacking/ spreading of good quality red earth free from stones, inert matter, breaking the clods, spreading/filling the same at areas shown with a lead of upto 100 metre., complete all as per specifications and as directed bythe EIC.Note: The earth shall be stacked at site in stacks not less than 50 cm high and of volume not less than 3.0 cum.The volume of the stacks shall be reduced by 20% for voids before payment.
90
-
-
Supplying and stacking/ spreading of decomposed dry good quality farm yard manure free from stones, inert matter, breaking the clods, spreading/filling the same at areas shown with a lead of upto 100 metre., complete all as per specifications and as directed bythe EIC. Note:The manure shall be stacked at site in stacks not less than 50 cm high and of volume not less than 3.0 cum.The volume shall be reduced by 8% for looseness in stacking and to arrive at the net quantity for payment.
25
-
-
Earthwork excavation in all types of soil by mechanical means(Hydraulic excavator)or manual means in all kinds of soil like hard gravelly soil,sandy soil for the following depth from average ground level,line in both dry and wet conditions, refilling as required with selected excavated earth and depositing/disposing the surplus earth within the lead specified below complete, upto 1.5 m below average ground level and disposing surplus excavated earth upto lead of 1 km within PRPD ,disposed earth to be leveled and neatly dressed in the areas as per the directions and specifications of the EIC.
25
-
-
Surface dressing , of the area manually/mechanically including removing vegetation, roots etc and inequalities not exceeding 15 cm deep and disposal of rubbish ,lead upto 50 m and lift upto 1.5 m,all as per specification and as directed by EIC.
2000
-
-
Fine dressing and development of the area by weeding/application of herbicides ,propogation / planting of supplied mexican grass by dibbling in the prepared area,collecting planting of Paspalam sp/Stanotaphrum sp grass, ground cover ,plants etc from the existing garden area inside PRP site ,planting of the same, planting of supplied plants,shrubs,herbs,trees etc in the prepared area all as per detailed specifications and as directed by the EIC.
1500
-
-
Supply of good quality mexican grass free from weeds for turfing/propagation ,by loading ,transporting ,unloading ,laying at work site etc all as per specifications and as directed by the EIC.
700
-
-
Supply of Floral foam -1 box of 20 nos
20
-
-
Supply of Broom stick soft. The total length of the broom with the handle should not be less than 1.2 mtrs. The handle should be of good quality plastic of length and dia meter about 400mm and 40mm respectively. The broom should be spaced closely.
20
-
-
Supply of Mopp cotton refill .The length and width of the cotton head should not be less than 200mm and 160mm respectively. The cotton head should be spaced closely.
20
-
-
Supply of Cobweb stick of extendable Plastic/Aluminium/Metal handle of minimum 6 feet length
20
-
-
Supply of Air Purifier (minimum of 75 gm each). It should have pleasant odour of jasmine/Mogra/Lavender and should be of superior quality.
20
-
-
Supply of Room freshner of 125gm/217 ml.It should have pleasant odour of jasmine/Mogra/Lavender and should be of superior quality.
8
-
-
Supply of Plastic Dust bin of about 25 cm height with top dia of about not less than 20 cm.
20
-
-
Supply of Liquid hand wash. The Liquid soap hand wash should be of good quality (preferably in 50 litre cans). The liquid should be of IS 4199:2001. Soap concentration (residual weight) should be of 20%.
200
-
-
Supply of Plant growth regulator as and when required & as directed by the EIC.
2
-
-
Supply of Pesticide/Fungicide/Herbicide as and when required & as directed by the EIC.
3
-
-
Supply of PVC cushion dirt trapper mat 12mm thick , with anti slip rubber backing.
50
-
-
Supplying, laying and jointing of following dia of rigid PVC pipe and specials of make" Finolex" or other approved equivalent make with ISI mark as per IS 4985:2000 with working pressure of 10 Kg/Sq.cm including loading, transporting,unloading at work site,laying and fixing the pipes and specials ,Saddles,reducers,elbows,bend , etc with necessary solvent cement of approved make,testing to required working pressure,etc, all complete excluding earthwork excavation which will be paid separately under relevant item as per specification and as directed.63 mm OD PVC pipe of class-III (6 kg/sq.cm)
100
-
-
Supplying, laying and jointing of following dia of rigid PVC pipe and specials of make" Finolex" or other approved equivalent make with ISI mark as per IS 4985:2000 with working pressure of 10 Kg/Sq.cm including loading, transporting,unloading at work site,laying and fixing the pipes and specials ,Saddles,reducers,elbows,bend , etc with necessary solvent cement of approved make,testing to required working pressure,etc, all complete excluding earthwork excavation which will be paid separately under relevant item as per specification and as directed.50 mm OD PVC pipe of class-III (6 kg/sq.cm)
75
-
-
Providing and fixing 50mm dia.heavy ball valve of make "Finolex" or approved equivalent
4
-
-
Providing and fixing 20mm dia.heavy ball valve of make "Finolex" or approved equivalent
10
-
-
Supply and fixing of Rotor Sprinkler including all required accessories to make it operational ,testing ..etc all as per specification and as directed by EIC.
4
-
-
Supply and fixing of Unispray pop up Sprinkler including all required accessories to make it operational ,testing ..etc all as per specification and as directed by EIC.
20
-
-
Supply of Urinal cubes
4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements