Rural Management And Development Department Tender

View complete overview of Sikkim Rural Management And Development Department Tender

Rural Management And Development Department Tender

Works
Eprocure
Opening Date21 Nov 2018
Closing Date13 Dec 2018
Tender Amount₹ 2,11,36,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
approved materials obtained from borrow pits with all

-

-

-

... More
lifts and leads, transporting to site spreading,grading to

-

-

-

... More
required slope and compacted to meet requirement of

-

-

-

... More
table 300.2 with lead upto 1000m as per Technical

-

-

-

... More
specification clause 303.1

986.04

197691

200.49

... More
Loosening , levelling and compacting the cut formation to facilitate placement of granular sub-base course , scarified to a depth of 150 mm, mixed with water at OMC and compacting by rolling so as to achieve minimum dry density as given in Table no. 300

1815.21

66636

36.71

... More
Construction of granular sub-base by providing local

-

-

-

... More
materials, spreading in uniform layers, watering raming

-

-

-

... More
to required templete and consolidating with power road

-

-

-

... More
roller 80-100 kn capacity to achieve the desired density

-

-

-

... More
complete.The thickness of the compacted base to be

-

-

-

... More
150mm Work to be done as per direction of Engineer

-

-

-

... More
in Charge(Using Naturally ocurring River Bed Materials.

1558

1821566

1169.17

... More
Water Bound Macadam Base (Grade-II)

-

-

-

... More
Providing laying, spreading & compacting stone aggre-

-

-

-

... More
gates of specific sizes to water bound madadam speci-

-

-

-

... More
fication i/c spreading in uniform thickness, hand pack

-

-

-

... More
rolling with smooth wheel roller 80-100 kN static roller

-

-

-

... More
in stages to proper grade and camber applying & bro-

-

-

-

... More
mming, water & compacting to the required density

-

-

-

... More
Grading II as per Technical Specification Clause 405

867

1410166

1626.49

... More
Water Bound Macadam Base (Grade III)

-

-

-

... More
Providing laying, spreading & compacting stone aggre-

-

-

-

... More
gates of specific sizes to water bound madadam speci-

-

-

-

... More
fication i/c spreading in uniform thickness, hand pack

-

-

-

... More
rolling with smooth wheel roller 80-100 kN static roller

-

-

-

... More
in stages to proper grade and camber applying & bro-

-

-

-

... More
mming, water & compacting to the required density

-

-

-

... More
Grading II as per Technical Specification Clause 405

867

1462516

1686.87

... More
Prime Coat :

-

-

-

... More
Providing & applying primer coat with Bitumen emulsion

-

-

-

... More
(SS-1) on prepared surface of granular base i/c clean

-

-

-

... More
of road surface and spraying primer at the rate of 0.90-

-

-

-

... More
1.2kg/sqm using mechnical means as per Technical

-

-

-

... More
Specification clause 502.

11565

720962

62.34

... More
Tack Coat:

-

-

-

... More
Pro. & applying tack coat with Bitumen emulsion(RS-1)

-

-

-

... More
using emulsion distributor at the rate of 0.25 to 0.30km

-

-

-

... More
per sqm on the prepared granular clause 503.

11565

202734

17.53

... More
20mm thick open graded premix carpet usingBituminous

-

-

-

... More
Binder ;

-

-

-

... More
Case I : By Mannual Means

-

-

-

... More
1. Bituemen (S-90)

-

-

-

... More
Providing & Laying & rolling of open graded premix carpet of 20mm thickness composed 13.2mm to 5.6mm aggregates either using penetration grade bitumen or emulsion to required lines laying & rolling with a three wheel 80 to 100kN static roller capacity finished to 100 Kn static roller capactity required seal coat of type B as per Tech. Clause 508

11565

2126225

183.85

... More
Seat Coat:

-

-

-

... More
Case : I Type B

-

-

-

... More
(1) Bitumen (S-90)

-

-

-

... More
Providing & laying seal coat sealing the voids in a

-

-

-

... More
bituminous surface laid to the specified level, grade &

-

-

-

... More
cross falling using Type A as per tech. Clause 510

11565

712172

61.58

... More
Carriage of Stock Materials : (Lead 100Km)

-

-

-

... More
Consumption of Cement/Steel/Bitumen/Emulsion

-

-

-

... More
Loading

43.48

4801

110.42

... More
Unloading

43.48

4353

100.12

... More
Haulage

4348.4

18263

4.2

... More
Carriage of stone boulder and stone dust(Lead 10Km)

-

-

-

... More
Consumption of Stone Chips & Dust

-

-

-

... More
Loading

4670.4

172150

36.86

... More
Unloading

4670.4

112836

24.16

... More
Haulage

102748.8

431544

4.2

... More
Carriage of stone chips(Lead 100Km)

-

-

-

... More
Consumption of Stone Chips & Dust

-

-

-

... More
Loading

312.26

11509

36.86

... More
Unloading

312.26

7544

24.16

... More
Haulage

74942.4

314758

4.2

... More
Carriage of sand(Lead 100Km)

-

-

-

... More
Loading

104.09

3836

36.86

... More
Unloading

104.09

2514

24.16

... More
Haulage

19152.56

80440

4.2

... More
Section B

-

-

-

... More
Earthwork in excavation for structures as per drawing

-

-

-

... More
i/c setting out, const. of shoring & bracing, removal of

-

-

-

... More
stumps & other deleterious materials & disposal upto

-

-

-

... More
lead of 50m necessary arrangement for dewatering shall

-

-

-

... More
be kept if required clause 305.1)

-

-

-

601

126420

210.35

... More
Ordinary Rock

400.11

105200

262.93

... More
Retaining wall and Brest Wall:

-

-

-

... More
Intermediate band of Random Rubble masonary with

-

-

-

... More
cement mortar (1:5),1(cement):5(sand)

1733.11

5001790

2886.02

... More
Providing and Laying Plain cement concrete in 1:2:4 mix including curing,compacting etc all complete.

54.4

269418

4952.55

... More
Providing & laying parapet of standard size on 1:2:4 mix plum cement concrete and plastering with cement mortar of 12mm thick all complete.(60cm height, 45cm top and 60cm bottom)

80

117995

1474.94

... More
Providing & laying of Gabian wall in wire crates

-

-

-

... More
with 4mm dia GI wire conforming to IS:280 & IS:4826 in

-

-

-

... More
100mm x 100mm mesh i/c 10% extra for laps & joints

-

-

-

... More
laid with hard durable regular in shape stone boulders

-

-

-

... More
weighing not less than 25kg each Clause 1301

630

1125249

1786.11

... More
Backfilling behind abutment, wing wall & return wall complete as per drawing with well packed graded filter to a thickness not less than 600mm with smaller size soil & bigger size towards the wall & provided over the entire surface, wing or return wall to the full height as per Clause 1204.3.8)

189.96

92622

487.58

... More
Carriage of Stock materials : (Lead 10Km)

-

-

-

... More
Consumption of Cement/Steel/Bitumen/Emulsion

-

-

-

... More
Loading

278.57

26252

94.24

... More
Unloading

278.57

26252

94.24

... More
Haulage

2785.74

11700

4.2

... More
Carriage of Non-Stock materials(Lead 10Km)

-

-

-

... More
Consumption of Sand

-

-

-

... More
Loading

621.13

22894

36.86

... More
Unloading

621.13

15006

24.16

... More
Haulage

11428.82

48001

4.2

... More
Carriage of Non-Stock materials(Lead 10Km)

-

-

-

... More
Consumption of Stones

-

-

-

... More
Loading

2242.25

165298

73.72

... More
Unloading

2242.25

82649

36.86

... More
Haulage

49329.58

207184

4.2

... More
Section C

-

-

-

... More
Construction of Hill Side Drain

-

-

-

... More
construction of RCC cross drain of internal dimension (1.00mx1.00m) annexure enclosed.

12

1446348

120529

... More
Const. of hill side drain with PCCM 10(1:3:6) in accordance with the requirement of specification true to line and grades. Clause 1606.1

2988

1977010

661.65

... More
Providing & laying hand packed stone soling of thickness

-

-

-

... More
with clean hard stones i/c hammer dressing of stone for

-

-

-

... More
laying as per required level and camber

304.78

170762

560.28

... More
Carriage of Stock materials : (Lead 10 Km)

-

-

-

... More
Consumption of Cement

-

-

-

... More
Loading

101.56

9571

94.24

... More
Unloading

101.56

9571

94.24

... More
Haulage

1015.62

4265

4.2

... More
Carriage of Non-Stock materials(Lead 10Km)

-

-

-

... More
Consumption of Sand

-

-

-

... More
Loading

216.97

7997

36.86

... More
Unloading

216.97

5242

24.16

... More
Haulage

3992.25

16767

4.2

... More
Carriage of Non-Stock materials(Lead 10Km)

-

-

-

... More
Consumption of Stones

-

-

-

... More
Loading

612.69

45167

73.72

... More
Unloading

612.69

22583

36.86

... More
Haulage

13479.18

56612

4.2

... More
Section D(Road Furniture)

-

-

-

... More
Ordinary Kilometer Stone (precast/ cast-in-situ)

3

4006

1335.58

... More
Reinforced cement concrete M15 kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc. as per Drawing and Technical Specification Clause 1703

-

-

-

... More
200 M Stone (precast/ cast-in-situ)

8

3214

401.82

... More
Providing and fixing 'Logo' of PMGSY project

2

12509

6254.77

... More
Providing & fixing of retro-reflectorised cautionary, man-

-

-

-

... More
datory & infomatory sign as per IRC:67 made of encap-

-

-

-

... More
sulated lens type reflective sheeting vide clause 1701.2.3

-

-

-

... More
fixed over aluminium sheeting 1.5mm thick surpported

-

-

-

... More
on a mild steel angle iron post 75mmx75mmx6mm fix

-

-

-

... More
to the gound by means of properly designed foundation

-

-

-

... More
with M15 grade c.c. 450mmx450mmx600mm,600mm

-

-

-

... More
below ground level as per drawing Clause 801

-

-

-

... More
900mm equilateral triangle

5

7597

1519.55

... More
600mm equilateral triangle

5

7480

1496.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.