Pradhan Mantri Gram Sadak Yojana Tender

View complete overview of Sikkim PMGSY Tender

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Eprocure
Opening Date7 Feb 2019
Closing Date15 Feb 2019
Tender Amount₹ 1,53,19,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Subgrade and Earthen Shoulders

-

-

-

... More
Construction of sub grade and earthen shoulders with approved materials obtained from borrow pits with all lift and leads trasporting to site,spreading grading to required slope and compacted to meet requirement of table300.2 with lead upto 1000 mtr as p

3109.08

-

200.49

... More
Compacting Cut Formation :

-

-

-

... More
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.

1554.54

-

36.71

... More
Stabilisation of Sub-Bases and Base

-

-

-

... More
Waterproofing on top compacted ( as per relevant MoRD specification) sub Grade soil base with Organosilane Nanotechnology & nano acrylic co-polymer with water (1000 ppm TDS) in the ratio of 1 kg Organosilane Nanotechnology:1 kg nano acrylic co-polymer :200 liter water spray @ 3 liter /sqm in two spray applications (1.5 liter + 1.5 liter) as per direction of the Engineer-in-charge.

8071.65

-

13.5

... More
Stabilized Sub base / Base: Providing, laying, Spreading and compacting in-situ/borrow area soil /Murrum of CBR 5% mixed with / without 30% of granular Grade-I material. Application: (1) Rip and loosen the soil with tractor operated ripper / rotavator upto depth of 150 mm. Apply 0.75 - 1 kg /cum organosilane Nanotechnology with OMC water (1000 ppm TDS) on loose soil with scarification, (2) Spread cement @ 3% by soil weight in treated & dry soil , (3) 0.75 kg/cum of nano acrylic Co-Polymer with OMC water (1000 ppm TDS) on loose soil-cement with scarification. Grade the soil (4) Spread single layer of 13.2 and down size aggregates on the graded soil surface to form 20-25 mm thick soil-aggregate layer.(5).Compact the soil-aggregate surface with 8 to 10 tonne vibratory power roller to achieve smooth stone embedded layer with the desired density.(6).Waterproofing the top compacted surface with organosilane & nano acrylic Polymer in the ratio of 1 kg organosilane :1 kg nano acrylic Co-Polymer : 200 liter water (1000 ppm TDS) @ 3ltrs/sqm in two spray application (1.5 ltrs. + 1.5 ltrs.).Rates including all materials, labour, hire Charges of machery etc. complete as per MoRD specifications & direction of Engineer-in-Charge. UCS @ 7 days = 4.50

1614.33

-

2305.52

... More
Prime Coat:Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification cl. 502.

7473.75

-

62.34

... More
Tack Coat:Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.

7473.75

-

17.53

... More
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.Open graded premix surfacing using cationic bitumen emulsion

7473.75

-

183.85

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510

7473.75

-

61.58

... More
Providing and laying Bituminous wearing course with 20mm thk premix carpetting over tack coat laid on concrete surface of deck slab of bridge/culvert and seal coat Type B over premix carpetting as per drawing including laying the same with proper camber and curing so as to avoid formation of shrinkage cracks in hot weather as per Technical specifications cl. 508, 503, 510 .

146.26

-

337.53

... More
Carraige of stock materials:(lead=127km)

-

-

-

... More
Consumption of Cement/steel/Bitumen Emulsion :

-

-

-

... More
Loading

32.05

-

110.42

... More
Unloading =

32.05

-

100.12

... More
Haulage =

4070.35

-

4.2

... More
Carraige of non-stock materials:(lead:55)

-

-

-

... More
Consumption of stone chips & stone dust :

-

-

-

... More
Loading & unloading

529.14

-

61.02

... More
Haulage =

64025.82

-

4.2

... More
Carriage of stine chips and stone dust (for premix)(lead 55)

-

-

-

... More
Loading & unloading

201.79

-

61.02

... More
Haulage =

24416.59

-

4.2

... More
Carriage of soil from borrowpit (lead-10km)

-

-

-

... More
Loading & unloading

1130.03

-

61.02

... More
Haulage =

20340.56

-

4.2

... More
Setion B (P/WORK)

-

-

-

... More
Retaining wall & Brest wall :

-

-

-

... More
a)Earthwork in excavation for structures as per drawing including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches

113.61

-

210.35

... More
(b) Random Rubble masonry with cement mortar ( In cement mortar (1:5) , ( 1 (cement) : 5(sand)) for Brest wall .

527.03

-

2886.02

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 50% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.

348.45

-

3441.42

... More
P/L of boulder apron laid in wire crates with 4mm dia G I wire conforming to IS 280 & diagonally i/c 10% extra for laps & joints laid with with stone boulders weighing not less than 25 kg all complete.

242.51

-

1885.37

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings with well packed graded filter to a thickness not less than 600 mm with smaller size towards soil and bigger size towards the wall and provided over the entire surface behind abutment , wing or return wall to the full height as per direction of the Engineer (technical specification Clause 1204.3.8).

798.25

-

487.58

... More
Carraige of stock materials(35km)

-

-

-

... More
Loading

101.5

-

94.24

... More
Unloading =

101.5

-

94.24

... More
Haulage =

3114.06

-

5.57

... More
Carraige of Sand(Lead:55km)

-

-

-

... More
Loading& unloading

235.81

-

61.02

... More
Haulage =

23864.18

-

4.2

... More
Carraige of Stone(Lead:55km)

-

-

-

... More
Loading& unloading

1646.09

-

110.58

... More
Haulage =

190123.28

-

4.2

... More
Setion C

-

-

-

... More
Construction of Hill Side Drain

-

-

-

... More
Construction of hill side drain in accordance with the requirement of specifications true to lines and grades. Dimesions and other particulars as per drawing and Technical Specification Clause 1606.1

1982

-

661.65

... More
P/L hand packed stone soling of specified thickness with clean hard selected stones all complete

222.98

-

560.28

... More
Carraige of stock materials(Lead:35km)

-

-

-

... More
loading

69.37

-

94.24

... More
Unloading =

69.37

-

94.24

... More
Haulage =

2427.95

-

4.2

... More
Carraige of Sand(Lead:55km)

-

-

-

... More
Loading & unloading

133.19

-

61.02

... More
Haulage =

14650.9

-

4.2

... More
Carraige of Stone(Lead:55km)

-

-

-

... More
Loading& unloading

455.91

-

110.58

... More
Haulage =

55165.11

-

4.2

... More
SECTION D:-(CULVERT)

-

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.

155.62

-

249.76

... More
stone masonary in cement mortar for substructure complete as per drawing & technical specification clauses 702,704,1202,and 1204(1:5)

103.25

-

3018.41

... More
stone masonary in cement mortar for substructure complete as per drawing & technical specification clauses 702,704,1202,and 1204(1:5)

76.44

-

3018.41

... More
Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall.

2.7

-

806.02

... More
Plain/Reinforced Cement Concrete of grade M-20(1:2:4) in complete as per Drawing and Technical Specifications.

19.8

-

4952.35

... More
Plain/Reinforced Cement Concrete of grade M-20(1:2:4) in complete as per Drawing and Technical Specifications.

2.79

-

4952.35

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

47.6

-

290

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification

42.31

-

487.58

... More
Providing tar paper bearing under the deck slab etc complete as per drawing and Technical Specifications

12.6

-

100

... More
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.

181.54

-

264.08

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

31.61

-

6742.8

... More
Filling fondation and plinth with excavated earth well watered and rammed etc complete as per drawing and Technical Specifications

51.87

-

135.28

... More
Carraige of stock materials(Lead:30km)

-

-

-

... More
CEMENT:-

-

-

-

... More
loading

256.25

-

9.42

... More
Unloading =

256.25

-

9.42

... More
Haulage =

7687.61

-

0.42

... More
HYSD BAR

-

-

-

... More
loading

59.18

-

10.2

... More
Unloading =

59.18

-

10.2

... More
Haulage =

1775.34

-

0.42

... More
Carraige of STONE CHIPS(Lead:20km)

-

-

-

... More
Loading & unloading

20.33

-

61.02

... More
Haulage =

406.62

-

6.93

... More
Carraige of Sand(Lead:20km)

-

-

-

... More
Loading & unloading

73.06

-

61.02

... More
Haulage =

1461.17

-

6.93

... More
Carraige of Stone(Lead:20km)

-

-

-

... More
Loading& unloading

191.51

-

61.02

... More
Haulage =

3830.28

-

6.93

... More
SECTION E (ROAD FURNITURES)

-

-

-

... More
Reinforced cement concrete M15 kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc. as per Drawing and Technical Specification Clause 1703

2

-

2210.11

... More
Ordinary Kilometer Stone (precast/ cast-in-situ)

3

-

1335.58

... More
Reinforced cement concrete M15 kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc. as per Drawing and Technical Specification Clause 1703

-

-

-

... More
200 M Stone (precast/ cast-in-situ)

9

-

401.82

... More
Providing and Fixing 'Logo' of PMGSY Project

-

-

-

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be we

2

-

6254.77

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801

-

-

-

... More
900mm side equilaterial triangle

12

-

1519.55

... More
600mm side equilateral triangle

12

-

1496.1

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801

12

-

6008.65

... More
Construction of job pillers as per Fig. 1600.1 (d) and Technical Specification Clause 1602.4

2

-

272.43



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.