Rural Management And Development Department Tender

View complete overview of Sikkim RMDD Tender

Rural Management And Development Department - RMDD Tender

Works
Eprocure
Opening Date23 Jan 2019
Closing Date22 Feb 2019
Tender Amount₹ 5,28,25,945 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
loading and unloading of mix slip 50 %

7859.27

-

-

... More
V.I.No.1

-

-

-

... More
Cost of haulage excluding loading and unloading.

78592.69

-

-

... More
PROTECTIVE WORKS

-

-

-

... More
Excavation work by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m.All kinds of soil.

1135.98

-

-

... More
Providing and laying. coarse Rubble Stone Masonry in 1:4:8 c.c. ( 1 cement, 4 sand, 8 clean hard graded stone chips of size 40mm and down) including bond stone, through stone of size 150mm x 150mm x 450mm manufactured in 1:4:8 (1cement, 4 clean coarse sand, 8 clean hard stone aggregate of size 40 mm and down), and curing etc, complete as per the direction of Engineer in Charge excluding the cost of carriage of materials.

1561.08

-

-

... More
Gabian structure(Providing and construction of a gabian structure with segment of wire crates of size 7m x 3m x 6m each divided into 1.5 compartment by cross netting.

96.4

-

-

... More
Providing and Laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 50% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete, as per the direction of Engineer in Charge.

116.36

-

-

... More
Providing and laying hand packed stone filling with clean hard selected stones, all complete.

-

-

-

... More
Stone Filling

44.07

-

-

... More
Mix Filling

44.07

-

-

... More
Loading and Unloading of Cement or Steel by Manual Means and stacking.

-

-

-

... More
Cement:-

118.54

-

-

... More
Cost of Haulage Excluding Loading and Unloading on surfaced Gravelled Road.

118.54

-

-

... More
Loading and unloading of stone boulder/stone aggregates /sand/ kanker/moorum. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip)

-

-

-

... More
SAND

297.58

-

-

... More
Cost of Haulage Excluding Loading and Unloading

547.55

-

-

... More
STONE

1508.17

-

-

... More
Cost of Haulage Excluding Loading and Unloading

3317.97

-

-

... More
Loading and unloading of stone boulder/stone aggregates /sand/ kanker/moorum. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip)

566.94

-

-

... More
Cost of Haulage Excluding Loading and Unloading

1060.18

-

-

... More
Pavement work:-

-

-

-

... More
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)

1161.1

-

-

... More
Compacting original ground supporting subgrade (Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.)

1935.17

-

-

... More
Granular Sub-base with Close Graded Material (Table:- 400-1)

-

-

-

... More
Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with

312.25

-

-

... More
Providing and Laying water bound macadam base course with stone aggregate, screenings and binding material, including screening, sorting and spreading of materials, watering, ramming to required template, carriage to be given extra. Thickness of compacted base to be 75 mm of Grading II classification using stone metals of 63 mm - 45 mm size and stone screenings of Type A (20 mm down) and specified quality of binding materials @ 0.09 cum per sqm. Work to be done as per the directions of Engineer-in-Charge, with consolidation using:

-

-

-

... More
Grading - II Using Screening Type-A (13.2mm Agg.)

234.19

-

-

... More
Providing and Laying water bound macadam surface - course with stone aggregate, screenings and binding material, including screening, sorting and spreading of materials, watering, ramming to required template, carriage to be given extra. Thickness of compacted base to be 75 mm of Grading III classification using stone metals of 53 mm - 22.4 mm size and stone screenings of Type B (10 mm down) and specified quality of binding materials @ 0.013 cum per sqm. Work to be done as per the directions of Engineer-in-Charge with consolidation using:

-

-

-

... More
Grading - III Using Screening Type-B (11.2mm Agg.)

216.84

-

-

... More
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.)

2891.18

-

-

... More
Tack coat (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at required rate on the prepared bituminous/granular surface cleaned with mechanical broom.)Granular Surface Treated with Prime

2891.18

-

-

... More
Open - Graded Premix Surfacing (Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.) Case-II: Open-Graded Premix Surfacing using cationic Bitumen Emulsion

2891.18

-

-

... More
Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats)

2891.18

-

-

... More
Carriage of stock materials to work site within a distance of 50 km.

-

-

-

... More
BITUMIN

-

-

-

... More
Loading and Unloading

12.37

-

-

... More
Cost of Haulage

618.5

-

-

... More
Carriage of sand within a distance of 40 km .

-

-

-

... More
Loading and Unloading

17.35

-

-

... More
Cost of Haulage

1387.77

-

-

... More
Carriage of stone metals and chips within 50 km radius.

-

-

-

... More
STONE CHIPS

-

-

-

... More
Loading and Unloading

245.9

-

-

... More
Cost of Haulage

21638.89

-

-

... More
Carriage of stone within 40km radius. .

-

-

-

... More
STONE

-

-

-

... More
STONE CHIPS

1072.41

-

-

... More
Cost of Haulage

94371.97

-

-

... More
CROSS DRAIN, SIDE DRAIN & PARAPET WORKS

-

-

-

... More
Providing box drain of 30 cm (ht) x 45 cm (width) internal dimension with 1:2:4 Plum concrete (20mm & down) in side walls thickness of 23 cm (hill side) and 30 cm (road side) and 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including providing & laying guard stones complete, as per the direction of the Engineer in Charge.

700.89

-

-

... More
Providing and laying parapet of standard size on 1:2:4 (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) plum concrete and plastering with 1:4 mix cement mortar of 12mm thick with recron 3S with lime washing three or more coats, complete as per the direction of the Engineer- in- Charge.

100

-

-

... More
Providing and laying of 1.2m span Cross drain( analysis enclosed)

6

-

-

... More
Loading and Unloading of Cement or Steel by Manual Means and stacking.

46.8

-

-

... More
Cement:-

-

-

-

... More
Cost of Haulage Excluding Loading and Unloading on surfaced Gravelled Road.

46.8

-

-

... More
Loading and unloading of stone boulder/stone aggregates/sand/ kanker/moorum. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip)

83.49

-

-

... More
SAND

-

-

-

... More
Cost of Haulage Excluding Loading and Unloading

153.62

-

-

... More
Loading and unloading of stone boulder/stone aggregates/sand/ kanker/moorum. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip)

177.01

-

-

... More
STONE

-

-

-

... More
Cost of Haulage Excluding Loading and Unloading

389.42

-

-

... More
Loading and unloading of stone boulder/stone aggregates/sand/ kanker/moorum. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip)

160.49

-

-

... More
AGGREGRATE

-

-

-

... More
Cost of Haulage Excluding Loading and Unloading

300.12

-

-

... More
Construction of 6.00X5.00 mtr RCC Culvert

-

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.

139.03

-

-

... More
stone masonary in cement mortar for substructure complete as per drawing & technical specification clauses 702,704,1202,and 1204(1:5)

106.11

-

-

... More
Stone masonary in cement mortar for substructure complete as per drawing & technical specification clauses 702,704,1202,and 1204(1:5)

150.38

-

-

... More
Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall.

10.8

-

-

... More
Plain/Reinforced Cement Concrete of grade M-20(1:2:4) in complete as per Drawing and Technical Specifications.

31.95

-

-

... More
Plain/Reinforced Cement Concrete of grade M-20(1:2:4) in complete as per Drawing and Technical Specifications.

3.87

-

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

26.9

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification

66.36

-

-

... More
Providing tar paper bearing under the deck slab etc complete as per drawing and Technical Specifications

6.3

-

-

... More
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.

183.01

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

5.2

-

-

... More
Filling fondation and plinth with excavated earth well watered and rammed etc complete as per drawing and Technical Specifications

46.34

-

-

... More
Loading unloading of stock material

-

-

-

... More
cement

377.32

-

-

... More
steel

54.57

-

-

... More
Haulage:-

431.89

-

-

... More
Loading unloading of non stock material

-

-

-

... More
sand

105.89

-

-

... More
Haulage:-

105.89

-

-

... More
Loading unloading of non stock material

-

-

-

... More
stone

280.65

-

-

... More
Haulage:-

280.65

-

-

... More
Loading unloading of non stock material

-

-

-

... More
stone chips

32.24

-

-

... More
Haulage:-

32.24

-

-

... More
CONSTRUCTION OF 60M SPAN STEEL GIRDER BRIDGE

-

-

-

... More
Earthwork in excavation for structures as per drawing including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.The foundation bed shall be levelled, watered & rammed both longitudinally and vertically before placing the foundation . Necessary arrangement for dewatering shall be kept if required (technical specifications Clause 305.1).

397.44

-

-

... More
Providing & laying hand packed stone soling of specified thickness with clean hard selected stones including hammer dressing of stone for laying as per required level and camber including packing with broken stones obtained from hammer dressing to fill the voids to give uniform surface as directed by the Engineer-in-Charge all complete but excluding carriage and consolidation using:

25.18

-

-

... More
Providing and laying of Cement concrete(1:3:6)

19.88

-

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specifications like , materials used in the proportion shall be in conformity with the requirements . Grade of cement used shall be sufficient enough to produce required strength , coarse aggregate (4.75 to 40 mm ) shall be of proper size , clean and free from any unwanted adherence , fine aggregate shall be of 0.15 to 4.75 mm sizes and free from lumps , flaky or other deleterious materials. Water shall be free from any injurious amount harmful to concrete . Proper mixing , transportation placing and compaction shall be done as per direction of the Engineer . No concreting shall be done without prior approval form the Engineer (technical specifications Clause 802, 804, 805, 806, 807, 1202 ans 1204).

154.88

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) , free from loose mill scales , loose rusts and coats of paints , oil , mud or any other unwanted substances , in substructrue complete as per drawings . Every bundle of bars shall be inspected before assembling and if found defective (like brittle , burnt etc.) shall be discarded . Any test , if required shall be got carried out by the contractor at his own cost ( technical specification Clauses 1002, 1005, 1010 & 1202 ) .

18.59

-

-

... More
Providing & laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 50% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete.

882

-

-

... More
Providing,fixing and removing of form work

378.2

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings with well packed graded filter to a thickness not less than 600 mm with smaller size towards soil and bigger size towards the wall and provided over the entire surface behind abutment , wing or return wall to the full height as per direction of the Engineer (technical specification Clause 1204.3.8).

42

-

-

... More
Carriage of Stock Materials

-

-

-

... More
Loading

229.61

-

-

... More
Unloading

229.61

-

-

... More
Haulage

9184.38

-

-

... More
Carriage of Stones

-

-

-

... More
Loading

520.57

-

-

... More
Unloading

520.57

-

-

... More
Haulage

20822.8

-

-

... More
Carriage of Sand

-

-

-

... More
Loading

281.35

-

-

... More
Unloading

281.35

-

-

... More
Haulage

11254

-

-

... More
APPROACH ROAD & WING WALLS

-

-

-

... More
Earthwork in excavation for structures as per drawing including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.The foundation bed shall be levelled, watered & rammed both longitudinally and vertically before placing the foundation . Necessary arrangement for dewatering shall be kept if required (technical specifications Clause 305.1).

381.56

-

-

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204.

598.06

-

-

... More
Random rubble masonry

256.31

-

-

... More
Providing & laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 50% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete.

8.1

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings with well packed graded filter to a thickness not less than 600 mm with smaller size towards soil and bigger size towards the wall and provided over the entire surface behind abutment , wing or return wall to the full height as per direction of the Engineer (technical specification Clause 1204.3.8).

1767.5

-

-

... More
Carriage of Stock Materials

-

-

-

... More
Loading

31.89

-

-

... More
Unloading

31.89

-

-

... More
Haulage

1275.46

-

-

... More
Carriage of Stones

-

-

-

... More
Loading

1056.47

-

-

... More
Unloading

1056.47

-

-

... More
Haulage

42258.6

-

-

... More
Carriage of Sand

-

-

-

... More
Loading

181.32

-

-

... More
Unloading

181.32

-

-

... More
Haulage

7252.8

-

-

... More
RIVER TRAINING WORKS

-

-

-

... More
Earthwork in excavation for structures as per drawing including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.The foundation bed shall be levelled, watered & rammed both longitudinally and vertically before placing the foundation . Necessary arrangement for dewatering shall be kept if required (technical specifications Clause 305.1).

148

-

-

... More
Providing & laying Plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 50% clean hard stone of sizes not exceeding 15cm including shuttering, compacting and curing complete.

280.4

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings with well packed graded filter to a thickness not less than 600 mm with smaller size towards soil and bigger size towards the wall and provided over the entire surface behind abutment , wing or return wall to the full height as per direction of the Engineer (technical specification Clause 1204.3.8).

38

-

-

... More
Carriage of Stock Materials

-

-

-

... More
Loading

44.86

-

-

... More
Unloading

44.86

-

-

... More
Haulage

1794.65

-

-

... More
Carriage of Stones

-

-

-

... More
Loading

287.47

-

-

... More
Unloading

287.47

-

-

... More
Haulage

11498.98

-

-

... More
Carriage of Sand

-

-

-

... More
Loading

65.89

-

-

... More
Unloading

65.89

-

-

... More
Haulage

2635.6

-

-

... More
60M SPAN STEEL SUPERSTRUCTURE

-

-

-

... More
Cost of 60 mtr. Clear span steel bridge of 40 R Loading width 5.1mtrs and carriage 4.2 mtrs RCC Decking of class(single lane)

60

-

-

... More
Fitting and fixing of steel girder bridge parts in position by welding, riveting, fixing of nuts and bolts etc, wherever required including alignment of bridge all complete excluding the cost of bridge materials and scaffolding as per design, erection / launching and direction of Engineer in Charge all complete.

1

-

-

... More
Form work & scaffolding for the bridges

1

-

-

... More
Provision for diversion ,dewatering & pumping etc.

1

-

-

... More
Painting with Aluminium paint over a coat of metal primer on steel bridge member all complete

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.