National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Sikkim NHIDCL Tender
National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender
Eprocure
Opening Date4 Feb 2021
Closing Date19 Apr 2021
Tender AmountRefer Documents
Costs
EMD
Refer DocumentsDocument Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_NHIDC_614224_1Bid Award Id
ViewTender No
NHIDCL/AE/Sikkim /NH-10/2020Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Quality cum Material Expert (1 No)
12
-
-
... More
Highway Engineer(1 No)
12
-
-
... More
Sub Professional Staffs
-
-
-
... More
Survey/Site Engineer (1 No. during Construction Period + 1 during Maintenance Period)
24
-
-
... More
Quantity Surveyor (1 No. during Construction Period)
12
-
-
... More
Support Staff (inclusive of per diem allowance)
-
-
-
... More
Office Manager (1 No. during Construction and 1 No. in Maintenance)
24
-
-
... More
Computer operator cum steno (1 No. during Construction and 1 No. in Maintenance)
24
-
-
... More
Transportation (Fixed Costs)
-
-
-
... More
Bolero or equivalent 4 x 4 vehicles (not more than 3 years old) (1 no during Construction Period and 1 no during Maintenance Period.), Rate per month
24
-
-
... More
Duty Travel to Site (Fixed Cost) : Professional and Sub-Professional staff. The Employer may require a Key Personnel to visit Employer's Site Office/Regional Office/ HQ the quoted amount against remuneration should include Travel Fare for 5 Round Trips to Employer's Head Office (including Hotel Charges, Travel Cost Etc )
1
-
-
... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
-
-
-
... More
Main Office of minimum 200 sqm area (location as decided by the Authority)
24
-
-
... More
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
-
-
-
... More
Office Supplies for Main Office
24
-
-
... More
Drafting Supplies for Main Office
24
-
-
... More
Computer Running Costs for Main Office
24
-
-
... More
Domestic and International Communication for Main Office
24
-
-
... More
Office Furniture and Equipment (Rental): The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internallines), photocopier(15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs (5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
-
-
-
... More
For Main Office
24
-
-
... More
Reports and Document Printing ( rate as per copy)
-
-
-
... More
Monthly reports
(Design and Construction)
36
-
-
... More
Half yearly Reports
6
-
-
... More
Various others reports as provided in the Concession Agreement such as Completion Report
6
-
-
... More
Road Survey Equipment, Rate per Km
-
-
-
... More
Surface defects detection and roughness measurement using Network Survey Vehicle
1
-
-
... More
Pavement strength measurement using FWD
1
-
-
... More
Road signs inspection using Retro Reflectometer
1
-
-
... More
Contigencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements