National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Sikkim NHIDCL Tender
National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender
Eprocure
Opening Date4 Feb 2021
Closing Date19 Apr 2021
Tender AmountRefer Documents
Costs
EMD
Refer DocumentsDocument Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_NHIDC_614224_1Bid Award Id
ViewTender No
NHIDCL/AE/Sikkim /NH-10/2020Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Quality cum Material Expert (1 No)
12
-
-
Highway Engineer(1 No)
12
-
-
Sub Professional Staffs
-
-
-
Survey/Site Engineer (1 No. during Construction Period + 1 during Maintenance Period)
24
-
-
Quantity Surveyor (1 No. during Construction Period)
12
-
-
Support Staff (inclusive of per diem allowance)
-
-
-
Office Manager (1 No. during Construction and 1 No. in Maintenance)
24
-
-
Computer operator cum steno (1 No. during Construction and 1 No. in Maintenance)
24
-
-
Transportation (Fixed Costs)
-
-
-
Bolero or equivalent 4 x 4 vehicles (not more than 3 years old) (1 no during Construction Period and 1 no during Maintenance Period.), Rate per month
24
-
-
Duty Travel to Site (Fixed Cost) : Professional and Sub-Professional staff. The Employer may require a Key Personnel to visit Employer's Site Office/Regional Office/ HQ the quoted amount against remuneration should include Travel Fare for 5 Round Trips to Employer's Head Office (including Hotel Charges, Travel Cost Etc )
1
-
-
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
-
-
-
Main Office of minimum 200 sqm area (location as decided by the Authority)
24
-
-
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
-
-
-
Office Supplies for Main Office
24
-
-
Drafting Supplies for Main Office
24
-
-
Computer Running Costs for Main Office
24
-
-
Domestic and International Communication for Main Office
24
-
-
Office Furniture and Equipment (Rental): The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internallines), photocopier(15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs (5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
-
-
-
For Main Office
24
-
-
Reports and Document Printing ( rate as per copy)
-
-
-
Monthly reports
(Design and Construction)
36
-
-
Half yearly Reports
6
-
-
Various others reports as provided in the Concession Agreement such as Completion Report
6
-
-
Road Survey Equipment, Rate per Km
-
-
-
Surface defects detection and roughness measurement using Network Survey Vehicle
1
-
-
Pavement strength measurement using FWD
1
-
-
Road signs inspection using Retro Reflectometer
1
-
-
Contigencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements