National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Sikkim NHIDCL Tender
National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender
Eprocure
Opening Date6 Nov 2020
Closing Date21 Dec 2020
Tender AmountRefer Documents
Costs
EMD
Refer DocumentsDocument Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_NHIDC_595414_1Bid Award Id
ViewTender No
NHIDCL/AE/Sikkim/NH-510/2020Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Senior Bridge/Structural Engineer (1 No)
12
-
-
Senior Quality cum Material Expert (1 No)
30
-
-
Sr. Tunnel Engineer cum Excavation Expert (1 No)
12
-
-
Geologist (1 No)
3
-
-
Tunnel Safety Expert (1 No)
3
-
-
Contract Specialist (1 No)
2
-
-
Sub Professional Staffs
-
-
-
Survey/Site Engineer (3 Nos. during Construction Period)
72
-
-
Quantity Surveyor (2 Nos. during Construction Period)
54
-
-
Bridge/Structural Engineer (2 Nos. during Construction Period)
54
-
-
Lab Technician (2 Nos. during Construction Period)
54
-
-
Support Staff (inclusive of per diem allowance)
-
-
-
Office Manager (2 No. during Construction and 1 No. in Maintenance)
114
-
-
Accountant Cum Cashier (2 No. during Construction and 1 No. in Maintenance)
114
-
-
Computer operator cum steno (2 No. during Construction and 1 No. in Maintenance)
114
-
-
Office Boy (2 No. during Construction and 1 No. in Maintenance)
114
-
-
Transportation (Fixed Costs)
-
-
-
Scorpio or equivalent 4 x 4 vehicles (not more than 3 years old) (3 nos during Construction Period and 1 nos during Maintenance Period.), Rate per month
132
-
-
Duty Travel to Site (Fixed Cost) : Professional and Sub-Professional staff. The Employer may require a Key Personnel to visit Employer's Site Office/Regional Office/ HQ the quoted amount against remuneration should include Travel Fare for 5 Round Trips to Employer's Head Office (including Hotel Charges, Travel Cost Etc )
1
-
-
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
-
-
-
Main Office of minimum 200 sqm area
90
-
-
Site Office of minimum 100 sqm area nearby Rolep (or as decided by the Authority)
24
-
-
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
-
-
-
Office Supplies for Main Office
90
-
-
Office Supplies for Site Office
24
-
-
Drafting Supplies for Main Office
90
-
-
Drafting Supplies for Site Office
24
-
-
Computer Running Costs for Main Office
90
-
-
Computer Running Costs for Site Office
24
-
-
Domestic and International Communication for Main Office
90
-
-
Domestic and International Communication for Site Office
24
-
-
Office Furniture and Equipment (Rental): The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internallines), photocopier(15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs (5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
-
-
-
For Main Office
90
-
-
For Site Office
24
-
-
Reports and Document Printing ( rate as per copy)
-
-
-
Monthly reports
(Design and Construction)
90
-
-
Half yearly Reports
15
-
-
Various others reports as provided in the Concession Agreement such as Completion Report
6
-
-
Road Survey Equipment, Rate per Km
-
-
-
Surface defects detection and roughness measurement using Network Survey Vehicle
577.1
-
-
Pavement strength measurement using FWD
346.26
-
-
Bridge inspection using Mobile Bridge Inspection Unit
3.46
-
-
Road signs inspection using Retro Reflectometer
577.1
-
-
Contigencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements