National Highways And Infrastructure Development Corporation Limited Tender

View complete overview of Sikkim NHIDCL Tender

National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender

Services
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date1 Oct 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Consultancy Services As Ae For Supervision During Om Period For Rangpo Viaduct (nh-10), Rhenock-rorathang-pakyong From Km 0.000 To Km 26.706 (nh-717a), Chisopani Traffic Tunnel (nh-510), Singtam-tarku And Tarku-ravangla Of Nh-510 In Sikkim On Epc

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bridge/Structural Engineer 1 No.

18

-

-

... More
Tunnel Safety Expert 1 No.

10

-

-

... More
Road Safety Expert 1 No.

10

-

-

... More
Sub-Professional Staff

-

-

-

... More
Survey Engineer, 1 Nos.

18

-

-

... More
Quantity Surveyor, 1 Nos.

18

-

-

... More
Lab Technician , 1 No.

18

-

-

... More
Assistant Bridge Engineer, 1 Nos.

24

-

-

... More
Assistant Highway Engineer, 1 Nos.

60

-

-

... More
Support Staff (inclusive of per diem allowance)

-

-

-

... More
Office Manager cum Accountant (1 No)

60

-

-

... More
Office Boy (1 No)

60

-

-

... More
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run

-

-

-

... More
Bolero or equivalent 4x4 vehicle (not more than 3 years old) (2 nos.)

78

-

-

... More
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office/HQ. The quoted amount against remuneration should include Hotel Charges, travel costs etc. complete

1

-

-

... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.

-

-

-

... More
One Office of Minimum 200 sqm area shall be rented . The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete. The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. complete.

60

-

-

... More
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.

-

-

-

... More
Time period

60

-

-

... More
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (8 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (3 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.

-

-

-

... More
Time Period

60

-

-

... More
Reports and Document Printing

-

-

-

... More
Monthly reports

180

-

-

... More
Half yearly Reports

30

-

-

... More
Various other reports as provided in the Concession Agreement such as Completion Report

12

-

-

... More
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.

-

-

-

... More
Surface defects detection and roughness measurement using Network Survey Vehicle (61 kms x 8 times)

488

-

-

... More
Pavement strength measurement using FWD (61 kms x 4 times)

244

-

-

... More
Bridge inspection using Mobile Bridge Inspection Unit (61 kms x 8 times)

488

-

-

... More
Road signs inspection using Retro Reflectometer (61 kms x 8 times)

488

-

-

... More
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.