Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

RA Number: GEM/2019/RA/18795 Dated: 09-09-2019 RA Document RA Details RA Technical End Date/Time 20-09-2019 09:00:00 RA Life Cycle (From Publish Date) 90 (Days) RA Offer Validity (From End Date) 30 (Days) Ministry/State Name Ministry Of Water Resources River Development And Ganga Rejuvenation Department Name Na Organisation Name Central Water Commission (cwc) Office Name Office Of The Chief Engineer, Teesta Basin Organisation, 2nd Mile, Sevoke Road, Siliguri, Dist- Darjeeling, West Bengal- 734001 Total Quantity 1 Item Category Multifunction Machines MFM OEM Average Turnover (Last 3 Years) 2 Lakh (s) MSE Exemption For Years Of Experience And Turnover Yes Startup Exemption For Years Of Experience And Turnover Yes Multifunction Machines MFM ( 1 pieces ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) Ungrouped Print Technology Laser Laser Type of Machine Multifunction Machine Multifunction Machine Type of Printing Colour Colour Cartridge Technology Composite Cartridge Composite Cartridge, Separate Drum and Toner (Mono Component), Separate Drum and Toner (Dual Component) Or higher 1 / 5 Developer Unit Yes * Platen/Flatbed Size A4 A4, A3, Legal Or higher Paper Size (Original/Image) A4/A4 A4/A4 RAM size (MB) 256 128, 256, 512, 1024, 2048, 4096, 6144, 3072, 320, 768, 1536, 1500, 758, 1250, 2560, 7168, 5120, 8192, 16384, 2816, 4000, 2000 Or higher Hard Disk Capacity(GB) 0 0, 8, 128, 160, 256, 320, 500, 1024, 250, 640, 32, 1000, 2000, 3000 Or higher Minimum Speed per Minute as per ISO/IEC 24734 in A4 Size-Mono 24 24, 25, 26, 27, 28, 30, 31, 35, 36, 38, 40, 43, 45, 46, 47, 50, 52, 55, 60, 61, 65, 70, 71, 75, 80, 90, 95, 100, 105, 110, 51, 56, 41, 120, 130, 160, 57, 33, 34, 32, 85, 81 Or higher Minimum Speed per Minute as per ISO/IEC 24734 in A4 Size-Colour 24 24, 25, 26, 27, 28, 30, 31, 35, 36, 40, 50, 60, 46, 120, 130, 160, 65, 45, 34, 55, 38, 56, 75, 81 Or higher Minimum Speed per Minute as per ISO/IEC 24734 in A3 Size-Mono 0 * Minimum Speed per Minute as per ISO/IEC 24734 in A3 Size- Colour 0 * Scanning Feature Availability Yes Yes Or higher Duplexing Feature Availability Yes Yes Or higher Faxing Feature Availability No yes, No Or higher Speed of Fax, If Fax Feature is available NA * Networking Feature Availability Yes Yes Or higher If yes, Type of Network Interface Ethernet 10/100/1000 * Wi-Fi Availability Yes Yes Or higher 2 / 5 If yes,Wi-Fi Type Wi fi 802.11 b/g/n & Wi Fi Direct * Original Document Feeder Type ADF ADF, DADF/RADF, SPDF Or higher Feeder Capacity (Number) 50 * Number of Main Paper Tray 2 2, 3, 4, 5 Or higher Each Main Paper Tray Capacity (Number) 250 * Bypass Facility Yes Yes Or higher If Yes, Bypass Tray Capacity 50 * Yield of the cartridge/Ink Tank/Ink Pack supplied with Machine as per ISO/IEC: 19798/2007(E) for Cyan colour (Number of prints) 1200 * Yield of the cartridge/Ink Tank/Ink Pack supplied with Machine as per ISO/IEC: 19798/2007(E) for Yellow colour (Number of prints) 1200 * Yield of the cartridge/Ink Tank/Ink Pack supplied with Machine as per ISO/IEC: 19798/2007(E) for Magenta colour (Number of prints) 1200 * Yield of the cartridge/Ink Tank/Ink Pack supplied with Machine as per ISO/IEC: 19752/2004(E) for Black (Number of prints) 2300 * Life of Drum in terms of number of Prints in case of Separate Drum and Toner cartridge technology - Cyan (Number of Prints) 0 * Life of Drum in terms of number of Prints in case of Separate Drum and Toner cartridge 0 * 3 / 5 technology - Yellow (Number of Prints) Life of Drum in terms of number of Prints in case of Separate Drum and Toner cartridge technology - Magenta (Number of Prints) 0 * Life of Drum in terms of number of Prints in case of Separate Drum and Toner cartridge technology - Black (Number of Prints) 0 * Duty Cycle (No of Prints/month) 50000 * Minimum Operating Te

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.