Indian Oil Corporation Limited Tender
View complete overview of Sikkim IOCL Tender
Indian Oil Corporation Limited - IOCL Tender
Aerospace and Defence
Eprocure
Opening Date15 May 2020
Closing Date23 May 2020
Tender Amount₹ 13,25,140
Costs
EMD
₹ 13,252Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_WBSO_117087_1Bid Award Id
ViewTender No
SKM/LPG/20-21/LT-01/NDTB45Tender Authority
Indian Oil Corporation Limited ViewPurchaser Address
-Website
http://https://www.iocl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Special_Instructions_to_the_Bidders_20200228
PROFORMA_OF_DECLARATION_OF_BLACKLISTING
BOQ Items
Providing flameproof lighting arrangement inside the bullet for carrying out necessary inspection, cleaning and N.D.T. tests.
2
-
10000
Thorough cleaning of the inner surface with the help of brooms, brush, wire brushes, scrappers followed by through mechanical or power cleaning by rotating wire brushes of inner surfaces to detached rust, mill scale, dust to exposed the bare metal surfaces and surface preparation for N.D.T. inspection through thorough buffing of weld joints covering heat effected zone i.e., 100 mm of parent metal on either side of butt weld joints and fillet weld joints of nozzles, weld area of support legs, area / points where temporary / permanent attachment such as cleats, bracket welds etc. and the rinsing with water jets. On completion of cleaning, all the muck / deposits / sludge to be removed from vessel may contain pyrophoric compounds, hence the content to be collected and kept wet in order to prevent auto ignition and then to be buried in safe designated areas as per site directions. A sample of all sludge collected should be handed over to the IOCL Site Engineer. The Contractor has to provide all equipments and consumables for carrying out the cleaning jobs.
2
-
20000
Fixing back the Liquid and Vapour lines, Valves, EFCV and fixing all removed fittings like HLA, SRV, Pressure / Temperature / Rochester Gauges, Manhole Covers, ROV etc. including supply and fixing of spiral wound gasket as directed at site as per specification / codes.
2
-
10000
Visual examination ASME Sec.V Art. 28 of internal surfaces for observation on any surface defects, weld defects, corrosion, pitting or otherwise physical and material defects etc.
2
-
2000
Ultrasonic thickness measurement as per ASTM-E-797 on shell plates and both dished end plates and ultrasonic thickness profile for corrosion mapping / plotting of residual thickness pattern as per the instruction of Third Part Inspecting Agency / IOCL Site Engineer.
2
-
20000
Ultrasonic thickness gauging as per ASTM-E-797 on around and on each nozzle-neck at four quadrant including LPG Pipelines upto 1st flange as per the instruction of Third Part Inspecting Agency/ IOCL Site Engineer.
2
-
7000
Hardness testing to check hardness value of welds, parent metals and HAZ on selected spots on welds, HAZ and parent metal in each accessible area as per ASTM E - 110 and meeting all requirements of PESO
2
-
25000
Wet Fluorescent Magnetic Particle Test as per ASTM-E- 709, ASME Sec.V, ASME Sec.VIII, Div.1 covering Circumferential Joints (CJ), Longitudinal Joints (LJ) and Dished ends welds – internal : 100%, CJ & LJ- External – more than 10%, Fillet weld of saddle support-RF Pad to shell & legs to RF Pad, External – 100% as per the instruction of Third Part Inspecting Agency / IOCL Site Engineer.
2
-
25000
Ultrasonic Flaw Detection Tests of welds as per ASME Sec. V, Art. 4, 5, 23, ASME Sec. VIII, Div.1 & 2 not less than 25% covering (a) T-weld joint, internal: 100%, (b) Middle circumferential & longitudinal seam, dished ends weldsinternal : 100%, nozzle neck to shell, internal : 100% as per the instruction of Third Part Inspecting Agency / IOCL Site Engineer.
2
-
25000
Liquid Penetrant Test as per ASTM-E-165, ASME Sec.V, and ASME Sec.VIII, Div.2 covering Nozzle Attachment Weld – internal : 100% as per the instruction of Third Part Inspecting Agency / IOCL Site Engineer.
2
-
6000
Hydrostatic test of the bullet as per design code of the bullet at mfgr. Recommended test pressure including stretch test at stages during hydro test operation. Functional test of EFCV, ROV. After testing dewatering and purging with LPG Vapour.
2
-
30000
Certification as per rule 19 of SMPV (U) Rules, 1981 along with providing Isometric drawing
2
-
6000
Preparing the calibration chart for each of the bullet. Contractor to calibrate the bullets as per the latest guidelines of the SMPV/PESO guidelines. Using standard equipment for calibration & standard equipment for the same to be arranged by the contractor. Water for the same to be supplied by IOCL. Calibration certificate (duly certified and stamped) to be provided with 4 copies duly mentioning the data of dip, corresponding volume percentage, volume of water in litres at each dip and weight of LPG at each dip.
2
-
35000
Inspection, Hydro testing and Certification of Air Receiver Vessel.
1
-
8000
Inspection, Hydro testing and Certification of evacuation vessel.
2
-
8000
Leak test and Servicing by complete dismantling and overhauling of ROV with supply of necessary spares.
9
-
20000
Inspection, testing and Certification of Safety Relief valve.
10
-
2100
Inspection, testing and Certification of Pop-Action valve and Safety Relief Valve of Compressors
44
-
500
Hydro testing for 2*2(1 Vertical&1 horizontal) nos Knockout drum for LPG vapour compressor
2
-
8000
Hydro testing for 2 nos Knockout drum for Air compressor
2
-
8000
Hydro testing for 2 nos Air receiver vessel for Security Air compressor
2
-
8000
Hydro testing for 1 no Knockout drum for evacuation compressor.
1
-
8000
Supply and installation of Isolation(Ball) valve -6”(L & T) flange end, Class 300#, CS Body