Water Resources Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Water Resources Department - WRD Tender

Works
Eprocure
Opening Date21 Oct 2024
Closing Date29 Oct 2024
Tender Amount₹ 28,38,861 
Notes
Download

Costs

  • EMD

    ₹ 56,777
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing labour for watch and Cleaning of syphon (2 labour for 24 hr.)

604

300

181200

... More
Hire charges for Tractors above 40 H.P. without diesel but with operational staff, M.Oil, spares & lubricants.

40

700

28000

... More
Hire charges for Karawha

10

120

1200

... More
Tractor Trolly above 2 Cum capacity (without staff)Four wheeler with hydraulic lift

30

350

10500

... More
Hire charges for Hydraulic excavator/ louder like JCB/Poklain,Hitachi etc. with all accesarries ( for actual site working ) having bucket capacity upto 0.40 cum, without diesel but with operational staff, M-oil, spares & lubricants for carriage of earth from borrow area for making bank serviceable & strengthening of banks.

60

625

37500

... More
Inspection Vehicles such as Car/Jeep/Gypsy(four wheel drive)Model not older than 2 years

100

900

90000

... More
Cost of Diesel Excluding contractor profit and GST input for tractor & Jeep

2310

94

217140

... More
Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and highly weathered rock for bed

61.6

9

609.84

... More
Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and highly weathered rock for side slopes

448

13

5958.4

... More
Cement concrete lining of mix (1:3:6) M-10 with upto 20 mm size well graded crusher broken stone aggregate laid as per specifications including all leads of all construction materials including rendering and curing etc. complete for canal bed of thickness 7.5cm for BED

61.6

451

27781.6

... More
Cement concrete lining of mix (1:3:6) M-10 with upto 20 mm size well graded crusher broken stone aggregate laid as per specifications including all leads of all construction materials including rendering and curing etc. complete for canal bed of thickness 7.5cm for Slopes

448

539

241472

... More
Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm

16.8

4830

81144

... More
Side shuttering including propping etc. complete (to achieve finish F 2 for a Block joints of foundation stilling basins buckets, aprons etc. (non suspended horizontally and mass concrete.)

112

160

17920

... More
Earth work in rough (borrow area) excavation for embankment in hard soil, Morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (excluding charges for compaction and watering), including loading and un-loading wherever required complete in all respect- (e) With lead beyond 1750 m and up to2250 m ( average lead2 Km)

3600

163

589500

... More
Deduct in item no 16 (b) if Standard Proctor's density to be achived is at least 90%

3600

-19

-68400

... More
Compaction of earth or highly weathered strata by mannual or plain roller. (density 90% of Proctor)

3600

25

90000

... More
Watering of earth including cost of carriage of water when source of water is 1 Km

3600

12

45360



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.