Public Health Engineering Department Tender
... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 1,80,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_PHCJO_154018_12Bid Award Id
ViewTender No
NIT No. 25 to 42/2019-20 Division PaliTender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://phedwater.rajasthan.gov.in/phed
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of Tube Well from ground level and upto 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe.
-
-
-
... More
Nominal bore 200 mm dia.
1
989
989
... More
Add 15% extra on depth more than 100 mtr for drilling beyond 100 mtr depth from ground level.
-
-
-
... More
Construction of tube well after completion of drilling by rotary method & upto 150 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe.
-
-
-
... More
Nominal bore 200 mm dia.
1
1025
1025
... More
Add 15% extra on depth more than 150 mtr for drilling beyond 150 mtr depth from ground level.
-
-
-
... More
Construction of Tube Well up to 150 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soil & over burden including lowering of casing pipe, (if required) excluding cost of casing pipe, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe.
-
-
-
... More
Nominal bore 200 mm dia.
1
865
865
... More
Add 15% extra on depth more than 150 mtr for drilling beyond 150 mtr depth.
-
-
-
... More
Construction of tube well from ground level and upto 100 mtr. depth and above of following sizes in all types of soils in alluvium strata, unconsolidated formation such as pebbles, boulders etc. by "bailing" method and without gravel packing as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work includes formation of cavity at bottom by development with appropriate air compressor or bailer pumping and also lowering of casing pipe but excluding cost of the casing pipe. The tube well should have a throughout bore as per nominal dia of casing pipe. The work would be completed after obtaining sand free water.
-
-
-
... More
Nominal bore 125 mm dia.
1
400
400
... More
Nominal bore 200 mm dia.
1
734
734
... More
Construction of tube well from ground level and up to 100 mtr depth and above to accommodate housing assembly pipe in all type of unconsolidated formation such as pebbles, boulders, collapsible formation etc. by Odex drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications. The work will include lowering of housing and strainer pipe assembly and casing shoe incuding cost of casing shoe, but excluding cost of the casing pipe. The work would be completed after obtaining sand free water.
-
-
-
... More
Nominal bore 125 mm dia.
1
688
688
... More
Nominal bore 200 mm dia.
1
1210
1210
... More
Deepening of existing tube well by DTH system beyond existing depth upto 100 mtr. and above in all type of rocks including flushing of tube well and obtaining sand free water.
-
-
-
... More
Nominal bore 150 mm dia.
1
740
740
... More
Nominal bore 200 mm dia.
1
1076
1076
... More
Supplying & Packing P-gravel suitable for slot size/mesh size as suggested in IS 2800 (Part-1) 1991 or as amended up to date.
1
3200
3200
... More
Development of tube well as per IS: 11189- 1985 and IS: 2800 (Part- I)- 1991 (both amended up to date) using suitable compressor to give sand free water for required yield of the gravel packed tube well.
1
979
979
... More
Supply of ERW M.S. black casing pipe ISI marked (IS: 4270/2001) or amended up to date of following sizes
-
-
-
... More
200 mm dia NB (Thickness of pipe 5.4mm & mass of tube 28.46 Kg/m)
1
1841
1841
... More
Labour charges for making slots on blank pipes made of ERW MS black pipe of following sizes, the slotting should be as per IS:8110-2000 or as amended up to date.
-
-
-
... More
200 mm dia nominal bore.
1
273
273
... More
Supply & Installation of 3 phase ISI marked submersible motor pump set of five star rating by BEE and as per IS: 8034-2018 (pump) and IS 9283-2013 (motor) or as amended up to date of approved make of following duty condition with required accessories including making connection suitable for tube well/DCB. The job includes lowering of motor pump, installation of complete fitting & accessories, jointing of electrical cables up to switch board, testing of submersible pump set and interconnection up to water mains, complete in all respect.
-
-
-
... More
Up to 5.5 KW (7.5 HP) & head up to 120 mtr.
1
6920
6920
... More
Up to 5.5 KW (7.5 HP) & head above 120 mtr.
1
7760
7760
... More
7.5 KW (10 HP) & head up to 120 mtr.
1
4970
4970
... More
7.5 KW (10 HP) & head above 120 mtr.
1
6620
6620
... More
9.3 KW (12.5 HP) & head up to 120 mtr.
1
4460
4460
... More
9.3 KW (12.5 HP) & head above 120 mtr.
1
5550
5550
... More
11 KW (15 HP) & head up to 120 mtr.
1
4290
4290
... More
11 KW (15 HP) & head above 120 mtr.
1
4910
4910
... More
13 KW (17.5 HP) & head up to 120 mtr.
1
4250
4250
... More
13 KW (17.5 HP) & head above 120 mtr.
1
4610
4610
... More
15 KW (20 HP) and above, head up to 120 mtr.
1
4090
4090
... More
15 KW (20 HP) and above, head above 120 mtr.
1
4300
4300
... More
Supply and Fixing of electric control feeder panel comprising of suitable rating MCCB , fully automatic star-delta starter, over load relay, ampere meter with CTs, volt meter, phase preventor, suitable starting capacitors, phase indicators, lighting arrangement etc complete suitable for three phase pump set. The panel should have space for energy meter ( supplied by DISCOM). All these equipments shall be housed by panel box made out from 18 guage M.S. Sheet with powder coating. Panel should be of minimum size 900 x 600 x 450 mm with Stand ( made of angle iron of size 35x35x5mm) duly bolted/screwed with enclosure box having 4 legs, each leg’s length 18" and double door including in built locking system. The legs should be embedded in M-15 cement concrete plat form.The size of CC plateform should be equal or bigger than the base size of panel having height of at least 200 mm from ground level. The panel should have opening of suitable size in front of space for energy meter with glass for meter reading. The operation of panel should be suitable for 440 Volt AC Supply.
-
-
-
... More
Above 5 HP and up to 10 HP
1
18290
18290
... More
Above 10 HP and up to 15 HP
1
21240
21240
... More
Above 15 HP
1
24190
24190
... More
Supply & Fixing of ISI marked three core PVC flat submersible cable as per IS 694:1990 or amended up to date and conductor as per class 5 of IS 8130:1980 including making connection etc.
-
-
-
... More
3 core 4.0 Sq.mm
1
137
137
... More
3 core 6.0 Sq.mm
1
204
204
... More
3 core 10.0 Sq.mm
1
343
343
... More
3 core 16.0 Sq.mm
1
529
529
... More
Supply & Fixing XLPE insulated / P.V.C. sheathed cable of 1.1 KV grade with aluminium conductor Armoured of IS:7098-I/1554-1 approved make in ground as per IS:1255 including excavation of 30cmx75cm size trench, 25 cm thick under layer of sand, second Class bricks covering, refilling earth, compaction of earth, making necessary connection, testing etc. as required of size.
-
-
-
... More
10.0 Sq.mm, 4 core
1
173
173
... More
16.0 Sq.mm, 4 core
1
191
191
... More
25.0 Sq.mm, 3.5 core
1
227
227
... More
35.0 Sq.mm, 3.5 core
1
262
262
... More
Plate Earthing as per IS:3043 with G.I. Earth plate of size 600mm x 600mm x 6.0mm by embodying 3 to 4 mtr. below the ground level with 20 mm dia. G.I. 'B' class watering Pipe including all accessories like nut, bolts, reducer ,nipple, wire meshed funnel, and C.C. finished chamber covered with hinged type with locking arrangement C.I. Cover, C.I. Frame of size 300mm x 300mm complete with alternate layers of salt and coke/charcoal, testing of earth resistance as required.
1
2800
2800
... More
Supply & Fixing M S clamp set of 50x6 mm flat from iron with nuts and bolts etc for holding the riser pipe assembly of submersible pump set.
1
450
450
... More
Supply & Fixing tube well cover of MS sheet 8mm thick at top & 5mm thick 100mm wide shroud around the edge so as to form a cap on the top end of casing pipe with GI Nipple 45cm long & two GI flanges at both ends in 80mm sizes passing through a hole in the centre of MS sheet. A 25 mm socket with end plug shall also be welded over top plate. A GI nipple having outside thread of size 1/2" (for installation pressure gauge) shall be provided & welded with 80mm GI nipple near top plate nipple shall be provided with end plug.
-
-
-
... More
125 mm dia
1
550
550
... More
200 mm dia
1
750
750
... More
Providing & Lowering in tubewell ISI marked GI Pipe “B" (medium) class as per IS:1239 part I 2004 or amended up to date, threaded and double flanged (welded) on both ends and two number 25x3mm MS flat welded on both ends between pipe & flange, rubber washer & nut bolts etc. complete in all respect.
-
-
-
... More
32 mm dia
1
333
333
... More
50 mm dia
1
515
515
... More
80mm dia
1
724
724
... More
Providing, installing, testing and commissioning of double flanged bulk flow meter with removable mechanism, of class B conforming to ISO 4064/1 or amended upto date of approved make including cost of all material and labour as per specifications with GI Box (sheet 16 SWG) suitable with locking arrangement of following dia.
-
-
-
... More
50 mm dia
1
11201
11201
... More
65 mm dia
1
12671
12671
... More
80 mm dia
1
14951
14951
... More
Providing & Fixing pump safety cage as per specifications or as directed by Engineer in charge.
1
825
825
... More
Providing & Fixing of double flanged, CI body, ISI marked NRV of approved make of following sizes
-
-
-
... More
80 mm dia
1
2440
2440
... More
Supplying & Installing 100 mm diameter sealed diaphragm bourdon type pressure gauge of range 0 to 10 kg. including all jointing material as per specification with safety cover.
1
800
800
... More
Labour charges for horizontal boring 100 mm dia in open well in rocky strata with all types of rock cutting & drilling tools etc. including all T&P required for job including dewatering arrangement.
1
540
540
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements