Public Health Engineering Department Tender

... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Public Health Engineering Department - PHED Tender

Works
Eprocure
Opening Date14 Apr 2021
Closing Date19 May 2021
Tender AmountRefer Documents 
Notes
Download

Costs

  • EMD

    ₹ 24,000
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 1,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
100/110mm

1

-

299

... More
125/140mm

1

-

364

... More
150/160/180mm

1

-

381

... More
200/225mm

1

-

640

... More
Add on above item no. 1 for B.T. Road 5%

1

-

-

... More
Add on above item no. 1 for C.C. Road 10%

1

-

-

... More
Add on above no. 1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr.20%

1

-

-

... More
Add on above no. 1 item if depth of pipeline is above 3.0 mtr. 30%

1

-

-

... More
Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil -

1

-

-

1

-

296

... More
100mm

1

-

334

... More
125mm

1

-

360

... More
150mm

1

-

432

... More
200mm

1

-

656

... More
250mm

1

-

1032

1

-

1032

... More
Add on abofe item no.2 for B.T.Road 5%

1

-

-

... More
Add on abofe item no.2 for C.C..Road 10%

1

-

-

... More
Add on abofe item no.2 if depth of pipe line is above 1.5 and up to 3.0 mtr. 20%

1

-

-

... More
Add on abofe item no.2 if depth of pipe line is above 3.0 mtr. 30%

1

-

-

... More
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) In all type Soil

1

-

-

1

-

534

... More
100 mm

1

-

578

... More
125 mm

1

-

650

... More
150 mm

1

-

774

... More
200 mm

1

-

901

... More
250 mm

1

-

1261

... More
300 mm

1

-

1559

... More
350 mm

1

-

1989

... More
400 mm

1

-

-

... More
Add on abofe item no.3 for B.T.Road 5%

1

-

-

... More
Add on abofe item no.3 for C.C..Road 10%

1

-

-

... More
Add on abofe item no.2 if depth of pipe line is above 1.5 and up to 3.0 mtr. 20%

1

-

-

... More
Deduct on above item no. 4 if valve is fixed at plinth level / platform i.e. no excavation is required

1

-

-

... More
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil

1

-

-

1

-

310

... More
90/80 mm

1

-

317

... More
110/100 mm

1

-

354

... More
140/125 mm

1

-

419

... More
180/160/150 mm

1

-

436

... More
225/200 mm

1

-

915

... More
250 mm

1

-

989

... More
300 mm

1

-

1044

... More
Add on above item no. 4 for B.T. Road 5%

1

-

-

... More
Add on above item no. 4 for CC Road 10%

1

-

-

... More
Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 20%

1

-

-

... More
Add on above item no. 5 if depth of pipe line is above 3.0 mtr. -30%

1

-

-

... More
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour.

1

-

254

... More
Add on above item no. 4 for B.T. Road 5%

1

-

-

... More
Add on above item no. 4 for CC Road 10%

1

-

-

... More
Add on above item no. 5 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 20%

1

-

-

... More
Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size. All type of soil

1

-

-

... More
50 to 75 mm

1

-

420

... More
80-110 mm

1

-

445

... More
125 to 165 mm

1

-

529

... More
200 to 300 mm

1

-

909

... More
350 to 400 mm

1

-

1260

... More
Add on above item no.6 B.T. Road -5%

1

-

-

... More
Add on above item no.6 for CC Road -10%

1

-

-

... More
Add on above item no. 6 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr.- 20%

1

-

-

... More
Restoration of cement concrete road including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compacting cement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job.

1

-

1065.63



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.