If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Military Engineer Services - MES Tender

Works
Coronavirus COVID 19
Eprocure
Opening Date24 Oct 2018
Closing Date22 Nov 2018
Tender Amount₹ 8,63,280 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Air Blower coupled with 20 HP motor make Kirloskar and Shanktra - 03 Nos (at STP for MBBR)

-

-

-

... More
Pump set type DN coupled with induction motor 25 HP, make Kirloskar - 02 Nos (at STP for pressure filters)

-

-

-

... More
Centrifugal pump set type SPQM coupled with 1.02 HP electric motor, make Kirloskar - 02 Nos (at STP between claritube settler and thickner)

-

-

-

... More
Screw pump coupled with 1 HP motor, make ABB - 02 Nos (at STP for sludge sumps)

-

-

-

... More
TEFC type electric motor 2 HP, make Crompton Greaves - 02 Nos (at STP one for thickner scraper and one for clari tube settler)

-

-

-

... More
Centrifugal pump coupled with 5 HP electric motor - 02 Nos (at STP for lorry filling point)

-

-

-

... More
Dosing pump for mixing PAC with PP head and PVC fitting anti syphon valve, foot valve, LDPE tubing, make Milton Roy India - 01 No (at STP for pumping the water from HDPE water storage tank)

-

-

-

... More
Agitator motor with dosing pump with shaft and blade for mixing the chemical in tank, make Bonfiglioloi - 01 No (at STP for PVC water tank)

-

-

-

... More
Tulu pump , make Aqya Services - 02 Nos (at STP one for chloronome plant and one for circulation of water in blower motor)

-

-

-

... More
Electric control panel - 07 Set (at STP one at each plant)

-

-

-

... More
Diesel Gen Set of capacity 200 KVA water cooled - 01 No (in case of failure of electricity).

-

-

-

... More
NOTES FOR SRL ITEM NO 1.00 ABOVE :-

-

-

-

... More
To provide above services, the contractor shall employ one operator and one helper for each shift. The operator (FGM) deployed shall be ITI passed in relevant trade from any recognized institute by Govt with at least 01 (one) year experience in the same field and one helper having minimum experence of one year in running a such kind of plant.

-

-

-

... More
The helper deployed by the contractor shall be responsible for cleaning, brooming, cutting/uprooting of bushes, shrubs, plants around the STP/filtter plant, earth embankment to envirmental tank and cutting the same from the inside lining of raw water reservoirs/enviremental tank, sedimatation and taking out sludge/floating materials from screening chamber, collecting tank/envirmental tank and upto sludging tank complete upto during sludge etc and burning out the bushes and brooming material and throwing away and to keep neat and clean buildings and complete sewage treatment plant and system as directed by Engineer-in-charge.

-

-

-

... More
Dual media bed shall be regularly cleaned

-

-

-

... More
The operator will do the oiling, greasing, gland packing etc minor repairs.

-

-

-

... More
COMMON NOTES FOR ALL BOQ ITEMS :-

-

-

-

... More
Diesel and Engine oil (for running the DG set), Liquid Chlorine Gas, Poly Aluminium Chloride (PAC) powder, Altoch, Bleaching powder (to be used at STP) shall be issued under Schedule 'B' free of cost and same shall be carried from store yard of GE LGJ to installations as per requirement by the contractor at his own arrangement and nothing extra shall be paid on this account. Demand for these items shall be given by the contractor two days in advance.

-

-

-

... More
Time of shift will be as decided by Engineer–in-Charge. The operator is bound to perform the duty as per time of shift given by the Engineer-in-charge. No request of contactor will be entertained for change the time of shift. Duty roster will be prepared accordingly.

-

-

-

... More
Installation in operating state will be handed over at the commencement of the contract mentioned in work order.

-

-

-

... More
Necessary tools and plants required at installations shall be provided by the contractor. First aid box complete with medicines shall be provided by the contractor at the installation

-

-

-

... More
The operator shall attend any type of minor complaint, minor repair of pump set, DG set, all other equipments and electrical fault at the installations. The minor stores to attend minor repair like nuts, bolts, washers, screws, shaft seal, sleeves, tape insulation, thimbles, oil/grease, short piece of cable for small joints, rubber sheet, gland packing etc shall be provided by the contractor and cost of the same shall be deemed to be included in the quoted rates

-

-

-

... More
Major complaints if noticed in the installation shall be immediately intimated to concerned JE or AGE (E/M).

-

-

-

... More
It is the responsibility of contractor to provide rest reliever and make arrangement during the holiday/leave and the rate for the same shall be deemed to be included in the quoted rates and no extra payment will be given to contractor on this account

-

-

-

... More
Contractor should visit the installations before quoting the rates and no infrastructure will be provided by the department to perform the duty. The contractor may provide the temporary additional infrastructure if he feels the requirement for performing the duty by operator.

-

-

-

... More
Daily Log Sheet as per specimen given by department shall be provided & maintained by the contractor without any extra charges for stationery.

-

-

-

... More
The cost effect on account of above notes shall be deemed to be included in the quoted unit rates and nothing extra shall be payable over and above.

-

-

-

... More
Checkup and cleaning i.e. daily, weekly, monthly, Quarterly, Half yearly of all equipments installed at each installations shall be carried out by the operator as specified or chart given by Engineer-in-charge and contractor shall be fully responsible for the same.

-

-

-

... More
Any damage caused to the equipment due to mishandling/negligence of the operator shall be repaired by the contractor without any extra cost.

-

-

-

... More
For shift duties required to be performed as per duty chart, but if not performed by the operating staff of the contractor for what so ever reason, a penal recovery as mentioned in PSS-II shall be recovered from the contractor’s due.

-

-

-

... More
Providing the services for comprehensive manning and operation, to operate the sluice valves (any size) installed/connected with water supply distribution mains of overhead tanks located at different locations in Mil Stn LGJ in two shifts (each shift of 8 hours continuous duration, each shift operated by two operators) per day (including Sunday and holiday) complete all as specified and as directed by Engineer-in-charge.

660

-

-

... More
NOTES

-

-

-

... More
The contractor shall employ two operator (Valvemen) for manning operation in each shift as per time table and as per the direction of Engineer-in-Charge. Each operator shall report daily (at the time of starting of shift) at clear water complex and will perform duty as per further direction of Engineer-in-charge. The operator should be fully conversant with trade. Total 04 Nos (02 for 1st shift and 02 for 2nd shift) operator shall be employed by the contractor.

-

-

-

... More
After supplying the water in their respective areas valve men/operator will report to ON duty FGM at filtration plant near main power house and help him in cleaning the filtration plant, back washing the filter beds of water filtration plant, shifting of alum and general cleanliness of the pump house area.

-

-

-

... More
Time of shift will be as decided by Engineer–in-Charge. The operator is bound to performing the duty as per time of shift given by the Engineer-in-charge. No request of contactor will be entertained for change the time of shift.

-

-

-

... More
Operator shall attend any type of minor complaint of the area of OHR, minor maintenance of sulice valve and valve pit with minor stores i.e. nut, bolts, rubber sheet and gland packing etc. The contractor shall provide these minor items without any extra cost to the department

-

-

-

... More
Contractor should visit the installation/OHR before quoting the rates and no infrastructure will be provided by the department to perform the duty. The contractor may provide the temporary additional infrastructure if he feels the requirement for performing the duty by operator.

-

-

-

... More
All T & P and Vehicle required for efficient manning and operation and minor maintenance of water supply installation shall be arranged by the contractor and the cost of the same shall be deemed to be included in his quoted rates.

-

-

-

... More
Daily Log Sheet as per specimen given by department shall be provided & maintained by the contractor without any extra charges for stationery.

-

-

-

... More
It is the responsibility of contractor to provide rest reliever and make arrangement during the holiday/leave and the rate for the same shall be deemed to be included in the quoted rates and no extra payment will be given to contractor on this account.

-

-

-

... More
For shift duties required to be performed as per duty chart, but if not performed by the operating staff of the contractor for what so ever reason, a penal recovery as mentioned in PSS-II shall be recovered from the contractor’s due.

-

-

-

... More
Any damage caused to the equipment due to mishandling/negligence of the operator shall be repaired by the contractor without any extra cost.

-

-

-

... More
Operator (Valvemen) will ensure the availability of water in OHT and water supplied to troops in full quantity as per direction of Engineer-in-charge.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.