Military Engineer Services Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 20,000Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Cleaning Of Ug Sumps , Oht And Repair, Replacement Of Control Valves At Af Stn Nal
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_MES_561284_1Bid Award Id
ViewTender No
GE (AF) NAL/T-45/2022-23Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
SCHEDULE OF CREDIT, SCHEDULE A NOTES, SPECIAL CONDITIONS, PARTICULAR SPECIFICATIONS AND OTHER CONNECTED DOCUMENTS
BOQ Items
Cleaning of Over head tanks capacity 25,000.00 gallons of height approx 60 feet by under taking the cleaning in two stage process are as under :- Note : Writing the date of cleaning in bold letters as CLEANED ON DD//MM/YYYY ,height and width of each letter 10 cm and 5 cm respectivelywith synthetic enamel paint on white painted background on external wall /pillar of OHT complete all as specified and directed.
(a) Descalling the inner surface by using high pressure rotary jets, mannualy by wire brush, pumping out the mud, algae and other dust particles by suction pump and industrial vaccum cleaner.
(b) Treatment walls, roof and floor by bleaching powder and wash out the same after treatment process complete all as specified and directed.
1
-
-
All as per srl item no 04 above but 50000 gallons capacity.
3
-
-
All as per srl item no 04 above but 100000 gallons capacity.
1
-
-
Cleaning of 1 x 100000 Glns capacity at Booster Pump House ,UG Sumps of depth upto 4 Mtr below ground level by under taking the cleaning in two stage process are as under :- (a) Descalling the inner surface by using high pressure rotary jets, mannualy by wire brush, pumping out the mud, algae and other dust particles by suction pump and industrial vaccum cleaner.
(b) Treatment walls, roof and floor by bleaching powder and wash out the same after treatment process and writing the date of cleaning in bold letters with synthetic enamel paint on white painted background on external wall complete all as specified and directed.
2
-
-
All as per srl item no 07 above but of 1 x 150000 Glns capacity at Filtration Plant
1
-
-
All as per srl item no 07 above but of 50000 Glns capacity at Old Booster Pump House & Nal Pump House .
2
-
-
All as per srl item no 07 above but Jack Wells of capacity 5000 ltrs to 10000 ltrs capacity of depth up to 5 Mtr.
3
-
-
Surface dressing n exc 15 cm deep in soft/loose surface including clearing away all grass vegetation, saplings, shrubs, brushwood, undergrowth, roots, leveling & water spreading and removing rubbish, upto a distance of 50 meters outside the periphery of the area under clearance all as directed by EIC
850
-
-
M & L for prepration of old painted steel surface in MS Structure plant by scretching by wire brushes of steel surface over width or girth for Cast Iron pipe lines ( approx lenghth 80 RM) of overhead tanks ,including rising mains, gravity, mains overflow pipe, wash out pipe & Header (02 Nos),CI valves (4 Nos) ,Pit covers(4 Nos) & MS Pipe (25 mtr) and Panel Board (02 Nos) etc by applying two coats of synthetic enamel paint over a coat of red oxide primer as per colour code decided by Engineer-in Charge complete all as specified and directed. Note : (i) The rates is inclusive of all necessary safety equipment and arrangement like stagging , safety harness , rope & safety jackets etc.
(ii) Necessary safety measures shall be ensure by the contractor, during the currency of work.
(iii) writing the date of cleaning in bold letters as CLEANED ON DD//MM/YYYY ,height and width of each letter 10 cm and 5 cm respectively
3
-
-
M & L for prepration of old painted steel surface by scraping of old dull paints from the surface by scretching by wire brushes of steel surface over width or girth to SWT's tanks of any capacity including Inlet pipe, wash out pipe etc and applying two coats of synthetic enamel paint over a coat of red oxide primer as per colour code decided by Engineer-in Charge complete all as specified and directed.
Note : (i) The rates is inclusive of all necessary safety equipment and arrangement like stagging , safety harness , rope & safety jackets etc. (ii) Necessary safety measures shall be ensure by the contractor, during the currency of work.
28
-
-
M&L painting Motor & pump set of capacity upto 60 HP at site including to all accessories by Scrapping out the existing paint and spray painting with one coat of approved quality synthetic enamelled paint over a coat of red oxide primer complete and writing SM No & MES No. with letter size 10 mm and height 75 mm with black colour on white base complete all as specified and directed.
3
-
-
Supply and fixing as in repairs sluice valve 150 mm dia class PN 1.0 ISI marked ( IS 14846) flanged end with iron wheel and stainless steel spindle including rubber gasket joints, nuts, bolts etc including testing complete all as specified and directed.
4
-
-
Supply and fixing as in repairs sluice valve 100 mm dia class PN 1.0 ISI marked ( IS 14846) flanged end with iron wheel and stainless steel spindle including rubber gasket joints, nuts, bolts etc including testing complete all as specified and directed.
2
-
-
Supply and fixing as in repairs sluice valve 80 mm dia class PN 1.0 ISI marked ( IS 14846) flanged end with iron wheel and stainless steel spindle including rubber gasket joints, nuts, bolts etc including testing complete all as specified and directed.
2
-
-
Supply and fixing as in repairs Non Return valve with bypass arrangement Class PN 1.0, size 150 mm bore pipe include nuts & bolts and washers complete all as specified and directed.
2
-
-
Supply and fixing as in repairs Non Return valve with bypass arrangement Class PN 1.0, size 80 mm bore pipe include nuts & bolts and washers complete all as specified and directed.
2
-
-
Applying two coats of water proofing admixture of the make /brand : Aquaseal/Sikatop Seal R-107 /Acrocrete /Dampguard (Pidilite) on plastered surfaces complete all as specified and directed. Quantity of admixture shall be as per manufacturer's instructions. Note : Remove all scales by mechinical means or mannually, before applying the treatment to surfaces of Tanks . (Location : UG Sumps/ SWT/ OH Tanks & Jack wells)
635
-
-
Takiing out old unserviceable Motorised valve of size 150mm bore fitted on Booster Pump Header by arranging alternative arrangement and carry out repair to valve and replacement of defective PCB, Motor Coil, Water seal, lock key and other connected items and re-fixing the valve and motor in original position and testing complete all as specified and directed.
Note :
(i) Spare parts shall be of the the same make existing.
(ii) Contractor shall provide alternative arrangement during repair work to avoid uninterupted water supply and the unit quoted rate shall incude the usage thereof.
2
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements