Military Engineer Services Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Military Engineer Services - MES Tender

Works
Machinery and Tools
Eprocure
Opening Date21 Sep 2024
Closing Date19 Oct 2024
Tender Amount₹ 22,61,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Comprehensive preventive and periodical maintenance of electric passenger Lift No. 03 of OMEX make lift in G+3 storey in reliably safe and efficient operating condition by regularly examine, lubricating and adjust the equipment and carry out planned maintenance in a systematic and controlled manner of one No 13 passenger lift capacity 884 Kg speed 1 M/S equipped with microprocessor based AC variable voltage variable frequency controller, AC Motor governor ropes driving sleave, travelling cable working and electric fitting, microprocessor card, rectifier card, controller AC drive, door drive, indication card, SMPS luminous card and hall button and landing door shoe car guide shoe landing, CWT guide shoe landing, transformer, motor bush hooter, FP Card door hanger roller, door sensor, complete all as specified and as directed. Notes :- (a) (i) Labour component required for the replacement of unserviceable parts shall be deemed to be included in the unit rate quoted against this item. (ii) Major parts (as required) shall be measured and paid separately under appropriate items of this Sch 'A'. (iii) T&P for replacement of minor/major parts will be arranged by the contractor and the cost thereof shall be deemed to be included in the unit rate quoted against this item. (iv) Contractor shall be fully responsible for full functioning of lift 24x7 days. (v) Each Job shall be considered for 02 Months. (b) The above maintenance shall be done through only E-in-C Branch's approved OEM rep or authorised rep or authorised agent of OEM i.e M/S Kone India, M/S Schindier India Pvt Ltd., M/S Kinetic hyundai Elevator & movement tech Ltd., M/S Hitachi Lifts India Pvt Ltd, M/S Mitsubishi Elevator India Pvt Ltd, M/S Otis Elevator Company India Ltd, M/S Fujitech India Pvt Ltd, M/S Johnson Lifts Pvt Ltd, M/S Thyssenkurupp Elevator India Pvt Ltd. M/S Omega Elevators, M/S Escon Elevators Pvt Ltd, M/S LT Elevators Pvt Ltd and M/S IES Elevators or any other OEM approved by E-in-C's Branch.

4

-

-

... More
Notes for Serial item No. 2.00 to 4.00 :- (i) As per E-in-C's Branch OEM (Original Equipment Manufacturer) generated inspection report shall be submitted immediately after conclusion of contract and then at a frequancy of two months by the contractor. (ii) All repairs, overhauling, requirement of spares for repair/replacement under this contract shall be based on inspection report genereated by OEM. (iii) If lift is not operational/break down for period more than 2 days for minor repairs or beyond seven days for major repairs than a penalty @ Rs. 1000/- per day shall be levied on contractor. The offload and onload date and time of breakdown shall be obtained from users. (iv) Regarding the breakdown is major or minor, same shall be decided by GE and the decision of GE in this regard shall be final and binding.

-

-

-

... More
Supply only the following spare parts / components for 13/15 passenger lift G+3 storey in MH bldg required to be replaced under serial item No 2.00 to 4.00 here-in-before, Make :- OMEX Elevators.

-

-

-

... More
Travelling Cable, 5mm

75

-

-

... More
Landing door spring

2

-

-

... More
Car Door Roller

4

-

-

... More
Landing door mechanical lock

4

-

-

... More
Landing door lock contact (Male + Female)

4

-

-

... More
Landing door Key (mechanical)

4

-

-

... More
Push button

3

-

-

... More
Steel door Rope 3mm dia complete with accessories

2

-

-

... More
Door shoe

2

-

-

... More
Rectifier card

2

-

-

... More
Landing door header

1

-

-

... More
Car door hanger

1

-

-

... More
Governor steel rope 8 mm dia

75

-

-

... More
Maintenance box

1

-

-

... More
Flexible copper conductor cable of size 1.5 Sqmm 12 core

50

-

-

... More
Car gate Lock set

3

-

-

... More
Display card

4

-

-

... More
Door seal

4

-

-

... More
Door belt

4

-

-

... More
Limit switch

6

-

-

... More
Read switch

8

-

-

... More
Header roller

6

-

-

... More
Header Incentry

6

-

-

... More
Pully of main machine

1

-

-

... More
Magnet coil

16

-

-

... More
Gate lock

4

-

-

... More
Alarm Hooter

1

-

-

... More
Fire main switch

2

-

-

... More
Steel wire rope 13 mm dia

100

-

-

... More
LOP Switch (Landing Operating Panel)

2

-

-

... More
COP Switch (Car operating panel)

2

-

-

... More
Door Sensor

4

-

-

... More
Fire Switch Glass

1

-

-

... More
Lift master complete

1

-

-

... More
Door coupler

1

-

-

... More
Gear set complete

1

-

-

... More
Main drive complete

1

-

-

... More
Door drive 1.0 HP (Door drive control sensor)

1

-

-

... More
Lift Gear box oil

10

-

-

... More
M&L in replacement main panel for controlling of 13/15 passenger lifts made out of sheet steel metal of size 90cm x 90cm x 25cm indoor with the following accessories (a) PCB - 02 Nos (b) Connector - 05 Nos (c ) Fuse assembly - 01 Set (d) Transformer 300 VA range 230 Volts to 440 Volt - 01 No (e) Single phase preventer type S-B make ADCD - 01 No

1

-

-

... More
M&L for rewinding and refixing of induction motor with suitable guage of super enamelled copper conductor including winding with fibre cloth/PVC insulated winding paper, superior quality varnishing, servicing of ball bearing, suitable main connection from coil to terminal box, opening of motor, cutting /removing old burnt winding coils, cleaning /filling the stater slots, necessary mechanical work for shaft/ bearing housing, preparing and inserting coils running /starting winding, interconnecting, fixing, soldering, jointing, heating, drying up coils, connection and testing at site, satisfactory running of motor of capacity 12.5 HP, 3 Phase, 440 Volts, 50 Hz, complete all as specified and as directed.

2

-

-

... More
M&L for rewinding and refixing of induction motor with suitable guage of super enamelled copper conductor including winding with fibre cloth/PVC insulated winding paper, superior quality varnishing, servicing of ball bearing, suitable main connection from coil to terminal box, opening of motor, cutting /removing old burnt winding coils, cleaning /filling the stater slots, necessary mechanical work for shaft/ bearing housing, preparing and inserting coils running /starting winding, interconnecting, fixing, soldering, jointing, heating, drying up coils, connection and testing at site, satisfactory running of motor of capacity 15 HP, 3 Phase, 440 Volts, 50 Hz, complete all as specified and as directed.

2

-

-

... More
Comprehensive preventive and periodical maintenance (Revomax) of boiler (02 Nos) of capacity 200 Kg, steam pressure 5.5-7.5 Kg/sqcm and water consumption 200 Ltrs/Hr, regular examine, lubricating and adjust equipment and carry out planned maintenance in a systematic and controlled manner complete all as specified and as directed. Notes :- (a) (i) Labour component required for the replacement of unserviceable parts shall be deemed to be included in the unit rate quoted against this item. (ii) Major parts (as required) shall be measured and paid separately under appropriate items of this Sch 'A'. (iii) T&P for replacement of minor/major parts will be arranged by the contractor and the cost thereof shall be deemed to be included in the unit rate quoted against this item. (iv) Contractor shall be fully responsible for full functioning of boilers 24x7 days. (v) Each Job shall be considered for 02 Months. (vi) OEM (Original Equipment Manufacturer) generated inspection report shall be submitted immediately after conclusion of contract and then at a frequancy of three months by the contractor. (vii) All repairs, overhauling, requirement of spares for repair/replacement under this contract shall be based on inspection report genereated by OEM. (viii) If boilers are not operational/break down for period more than 2 days for minor repairs or beyond seven days for major repairs than a penalty @ Rs. 1000/- per day shall be levied on contractor. The offload and onload date and time of breakdown shall be obtained from users. (ix) Regarding the breakdown is major or minor, same shall be decided by GE and the decision of GE in this regard shall be final and binding.

4

-

-

... More
Supply only the following spare parts/components for boiler in MH bldg required to be replaced under serial item No. 9.00 here-in-before, Make :- REVOMAX.

-

-

-

... More
Hose pipe

2

-

-

... More
Pneumatic Valve

2

-

-

... More
Display board

2

-

-

... More
Steam solenoid valve

2

-

-

... More
Gas kit complete set

2

-

-

... More
Motor Coil 1.5 HP

2

-

-

... More
Temperatore Controller

2

-

-

... More
Nozzle

2

-

-

... More
Oil Pump

2

-

-

... More
Photo Cell

2

-

-

... More
Safety Valve

2

-

-

... More
Stop Valve

2

-

-

... More
NRV 3/4"

2

-

-

... More
V-Belt

2

-

-

... More
Descalling Chemicals

2

-

-

... More
Relay

2

-

-

... More
Oil Seal

2

-

-

... More
Sequence Controller

2

-

-

... More
UV Cell

2

-

-

... More
Pressure Gauge 300 psi

2

-

-

... More
Globe Valve

2

-

-

... More
Contactor 18 Amp

2

-

-

... More
Streem Trap 1"

2

-

-

... More
Electrode Rods

2

-

-

... More
Asbestos Rope

2

-

-

... More
Comprehensive preventive and periodical maintenance of mechanical laundry by the reprentative of company (Make - Fabecare), 03 Nos, Drying tumbler 30 Kg capacity (02 Nos) and 03 Nos of Flat iron machines regularly examine, lubricating and adjust the equipment and replacement of unserviceable parts, fuel pump coupling, burner blow, limit switch, Diesel filter, timer ignition/ sparking rod, pressure gauge, tempreature controller, etc and made functional including carryout planned maintenance in a systematic and controlled manner complete all as specified and as directed. Notes :- (a) (i) Labour component required for the replacement of unserviceable parts shall be deemed to be included in the unit rate quoted against this item. (ii) Major parts (as required) shall be measured and paid separately under appropriate items of this Sch 'A'. (iii) T&P for replacement of minor/major parts will be arranged by the contractor and the cost thereof shall be deemed to be included in the unit rate quoted against this item. (iv) Contractor shall be fully responsible for full functioning of laundry 24x7 days. (v) Each Job shall be considered for 02 Months. (vi) The rate for replacement of Elbow 2mmx8mm, nipple 2mmx 8mm, PU pipe 8mm dia, reducer, nuts, bolts, washers, etc minor parts shall be deemed to be included in the unit rate quoted against this item. (vii) OEM (Original Equipment Manufacturer) generated inspection report shall be submitted immediately after conclusion of contract and then at a frequancy of three months by the contractor. (viii) All repairs, overhauling, requirement of spares for repair/replacement under this contract shall be based on inspection report genereated by OEM. (ix) If mechanical laundry, Drying tumbler, Flat iron machines, etc are not operational/break down for period more than 2 days for minor repairs or beyond seven days for major repairs than a penalty @ Rs. 1000/- per day shall be levied on contractor. The offload and onload date and time of breakdown shall be obtained from users. (x) Regarding the breakdown is major or minor, same shall be decided by GE and the decision of GE in this regard shall be final and binding.

4

-

-

... More
Supply only the following spare parts/components for Mechanical laundry 30 Kg washer Extractor in MH bldg required to be replaced under serial item No. 11.00 here-in-before, Make :- FABECARE.

-

-

-

... More
Wash starker

2

-

-

... More
Solenoid valve

2

-

-

... More
Hose pipe

2

-

-

... More
Angle valve

2

-

-

... More
Power Display

2

-

-

... More
Oil seal 'O' ring

2

-

-

... More
Rubber Hose Pipe 3 x 1 metre

2

-

-

... More
Rubber Hose Pipe 2 x 1 metre

2

-

-

... More
V-Belt (B-92)

2

-

-

... More
Door gasket

2

-

-

... More
FRL 1/2"

2

-

-

... More
Pneumatic Valve 3"

2

-

-

... More
Pneumatic Valve 2"

2

-

-

... More
Steam Valve 1"

2

-

-

... More
Door Lock

2

-

-

... More
Metalic steam house pipe 1"

2

-

-

... More
Shock absorbers

2

-

-

... More
FRL unit (Filter, Regulator and Lubricator Unit) 1/4" (8mm)

2

-

-

... More
Supply only the following spare parts/components for heating system boiler - 02 Nos of cap 200 Kg, steam pressure 5.5 -7.5 Kg/sqcm and water consumption 200 Ltrs/Hr at 187 MH bldg required to be replaced under serial item No. 9.00 here-in-before, Make :- REVOMAX.

-

-

-

... More
Burner fuel pipe

1

-

-

... More
Diesel pipe

1

-

-

... More
Hose pipe

2

-

-

... More
Diesel filter

2

-

-

... More
GPC 503

2

-

-

... More
Coupling shaft

2

-

-

... More
Coupling belt

2

-

-

... More
Steam saftey valve

2

-

-

... More
Pneumatic Actuator, make Aira

2

-

-

... More
Water feed pump

2

-

-

... More
Gate valve of size 25 mm dia

2

-

-

... More
Burner rod assembly

2

-

-

... More
Oil spray nozzel

2

-

-

... More
Boiler pressure switch

2

-

-

... More
Water Pump

2

-

-

... More
Sequence Controller

2

-

-

... More
Photo Cell with Socket

2

-

-

... More
Temperatore Controller

2

-

-

... More
Contactor Safety

2

-

-

... More
Nozzle

2

-

-

... More
Descalling Chemical energy flock 1110

20

-

-

... More
Water Seal

2

-

-

... More
Valve Set Assy

2

-

-

... More
Water level switch

2

-

-

... More
Bearing Make- SKF/NBC/TATA

2

-

-

... More
Supply only the following spare parts/components for flat Iron Machine in repair of serial item No. 11.00 here-in-before :-

-

-

-

... More
Single phase preventer (VSPD-I)

2

-

-

... More
Steam angle valve 1/2"

2

-

-

... More
Bearing Make- SKF/NBC/TATA

2

-

-

... More
M&L for Chest Cleaning or polishing flat Iron Machine complete all as specified and directed.

2

-

-

... More
M&L for greasing, oiling and servicing/ overhauling complete including replacement of all connected items complete to make servicable 30 Kg drying tumbler machine (02 Nos) complete all as specified and directed.

3

-

-

... More
M&L in replacement Contactor, 3 Pole, 32 Amp, AC operated, 415 Volt complete all as specified and directed. Make : Type ML-2 of L&T or equivalent in makes mentioned in Appendix 'B' here-in-after.

3

-

-

... More
Supply and fixing in replacement LED fitting low height downlighter 12 Watt, CCT 5700K, complete with standard profile linear LED lighting fixture, prewired and connecting up with & including 2 core flexible copper conductor cable 23/0.00076 from ceiling rose to light fitting, with all accessories and following specifications complete all as specified & as directed :- (a) Lumen efficacy of luminaire shall be minimum 100 lumen per watt. (b) Voltage operating range : 160 to 270 Volts. (c) Temp operating range : Minus 10 degree C to Plus 50 degree C. (d) Power Factor : Minimum 0.95 (e) THD : Max 10% (f) IP rating : IP-65 (g) CRCA pre coated housing (h) LED driver

18

-

-

... More
M&L for galvanized steel water tubing medium grade of 25mm bore with & including all fittings, fixed to walls and ceilings or laid in floors, including taking up or down existing unserviceable steel water tubing and connections of 25mm bore complete all as specified and as directed. complete all as specified and as directed.

100

-

-

... More
S&F in repairs 25mm bore stop valve, cast copper alloy, screwed down, high pressure with crutch or butterfly handle screwed both ends for iron pipe or for unions complete all as specified & as directed.

4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.