If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 24,000Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Repairing Of Chiller Condenser Units,testing And Calibration And Other Connected Works In Btf,rt Cabin And Wsa Iii Central Ac Plant At Af Stn Nal
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_MES_554811_1Bid Award Id
ViewTender No
GE (AF) NAL/T-39/2022-23Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
SCHEDULE OF CREDIT, SCHEDULE A NOTES, SPECIAL CONDITIONS, PARTICULAR SPECIFICATIONS AND OTHER CONNECTED DOCUMENTS
BOQ Items
Supply and fixing in repairs pilot solenoid valve 3 way of brass metal for compressor complete all as specified and as directed.
Make : SPORLAN / DENFOSS / SANLAN
1
-
-
Supply only Refrigerant Gas R-407c of compressor complete all as specified and directed.
Note : (a) Contractor shall produce the original purchase vouchers along with test certificates of entire quantity.
(b) Cylinder shall be arranged by the contractor at his own. However, after charging of gas, emptied gas cylinder shall be returned to the contractor.
(c) Gas shall be arranged by the contractor as per the requirement given by the Engineer-in-Charge.
(d) During transportation if any leakage is found, contractor shall be held responsible for any lapses. However, net measured quantity shall be taken into account for payment purpose.
(e) Before top up the gas in the cylinder , it shall be ensured by the contractor that cylinder is in order for filling the gas, necessary calibration shall be carried out by the contractor at his own and unit rates of this item includes this element. While quoting the rates, this aspect shall be taken into account and nothing extra shall be adissible on this account.
120
-
-
Taking down old UNSV sensor from chiller/ condensor unit and replacement of thermoelectrical sensor of existing model , include testing and commissioning complete all as specified and directed.
2
-
-
Supply & fixing in repair condensor safety valve 350 PSI to 550 PSI complete all as specified and as directed.
Make – SPORLAN/DENFOSS/SANLAN
2
-
-
Taking down defective micro processor controller make Softhard, phase controller and connective items from panel board of water cooled chiller unit of capacity 37.5 TR make Voltas Model No WCDS037DPMN3X1 refixing the same after necessary repair/ replacement of parts defective PCB, relays, micro processer based controller as required including testing and commissioning of chiller unit of the satisfaction of Engineer-in-Charge. Contractor also submit the test sheet of relay functioning of chiller unit after completion of job.
1
-
-
Taking down defective micro processor control panel make Softhard, phase controller and connected items from panel board of Water cooled chiller unit of capacity 24 TR or equivalent make Voltas Model as existing refixing the same after necessary replacement of display unit of microprocessor based PCB, phase controller, by replacement of parts as required including replacement of control wiring , if required complete testing and commissioning of chiller unit of the satisfaction of Engr-in-Charge. Contractor also submit the test sheet of relay functioning of chiller unit after completion of job.
1
-
-
De-scaling of chiller unit 75 TR Cap with the help of De-scaling chemicals with pump rotation and mechanical mean with the help of nylon brushes of suitable sizes complete testing and commissioning all as specified and directed by Engr-in-Charge.
3
-
-
Taking down old UNSV sensor from chiller/ condensor unit and replacement of thermoelectrical sensor of existing model , include testing and commissioning complete all as specified and directed.
3
-
-
Taking down old gas filters from refrigerant line in chiller, supply and fix new filter suitable for above chillers complete as existing model, include testing and commissioning complete all as specified and directed.
9
-
-
Taking down defective micro processor controller make Softhard, phase controller and connective items from panel board suitablr for Water cooled chiller unit of capacity 75TR make Voltas Model No ACWCDS078DPMN3X2 PCB Model No (MCPWCDOL078-V4) SCR 66TR (MPO) (V4) type Delux HMI current rating 5- 30 Amp, Aux supply 0-11 VAC, 0-13VAC refixing the same after necessary repair/ replacement of parts defective PCB, relays, micro processer based controller as required including testing and commissioning of chiller unit of the satisfaction of Engr-in-Charge complete all as specified and directed. Contractor also submit the test sheet of relay functioning of chiller unit after completion of job.
1
-
-
Taking down existing burnt backalite connector from panel baord, replacement of Bacakalite cable connector up to 63 AMPs after replacement of burnout existing copper lugs complete all as specified and directed.
8
-
-