Local Self Government Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 1,77,400Document Cost
₹ 5,000Tender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_DLB_206130_1Bid Award Id
ViewTender No
1789 date 20-11-2020Tender Authority
Local Self Government Department ViewPurchaser Address
-Website
http://https://lsg.urban.rajasthan.gov.in/content/raj/udh/lsg-jaipur/en/home.html
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading,
grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of
compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) As per level sheet
12750
-
163
Providing and Laying Reinforced cement concrete pipe NP4/
prestrssed concrete pipe for culverts including jointing ends and fixing collar with cement mortar 1:2 complete as per clause 1000 & 2900 of MoRT&H specification including all material, labour form
work, machinery.600 mm internal diameter
37.5
-
3510
Random rubble masonry with hard stone in foundation and plinthCement mortar 1:6 (1 cement : 6 coarse sand)
21.6
-
3190
Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth
level 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40
mm nominal size).
7.4
-
3360
Cement plastering including T&P, scaffolding, material and complete
labpour, including cost of water, curing, racking of joints etc. with 20
mm cement plaster of mix :1:6 (1 cement : 6 fine/ coarse sand)
36
-
192
Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth
level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20
mm nominal size).
1.4
-
4700
Providing, laying, spreading and compacting of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as
per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion.
2175
-
969
Providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion.
2900
-
1360
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements