Indian Oil Corporation Limited Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Indian Oil Corporation Limited - IOCL Tender

Works
Energy, Oil and Gas
Eprocure
Opening Date22 Nov 2024
Closing Date13 Dec 2024
Tender Amount₹ 9,28,04,965 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
NPS 1 [DN 25] Sch 80 [wall thk 4.55mm]

5

-

3994.77

... More
NPS 3 [DN 80] Sch 80 [wall thk 7.62mm]

1100

-

2440240

... More
NPS 4 [DN 100] Sch 80 [wall thk 8.56mm]

10

-

30566.84

... More
NPS 6 [DN 150] Sch 80 [wall thk 10.97mm]

1100

-

6508574.38

... More
NPS 8 [DN 200] Sch 80[wall thk 12.70mm]

10

-

88482.06

... More
NPS 4 [DN 100] Sch 40 [wall thk 6.02mm] (For Dip Hatch )

50

-

172457

... More
NPS 6 [DN 150] Sch 40 [wall thk 7.11mm] (For Roof Drain )

220

-

1117058.8

... More
NPS 8 [DN 200] Sch 40[wall thk 8.18mm] (For Dip Hatch)

40

-

181410.37

... More
Valves

-

-

-

... More
NPS 1 diameter 150# (ISO 17292 ).

15

-

77294.84

... More
NPS 1 diameter Gate Valve (For TRV Line) API 600/603

2

-

13922.4

... More
NPS 1 dia 150# F/F BS 1868

3

-

14570.75

... More
NPS 3 diameter 150# Ball valves as per BS 5351

20

-

399939.52

... More
NPS 6 diameter SS-316 Butterfly valve

2

-

64703.36

... More
NPS 6 dia 150# Dual Plate Check Valve as per API 594

3

-

162559.88

... More
NPS 6 dia 150# F/F BS 1868

4

-

63165.31

... More
NPS 6 dia 150# F/F CS Gate valves as per API 600

23

-

539827.63

... More
NPS 8 dia ANSI 150# F/F CS Gate valves as per API 600

3

-

92664.17

... More
Pipe fittings conforming ASTM A 105 / A 352 Gr. LF2 / A 216 Gr. WCB / A 234 WPB and dimensions as per ASME B16.9 / ASME B16.5

-

-

-

... More
FLANGE WNRF, NPS 1, Class 150 (TRV and Fire/ Foam Line drain point )

10

-

3616.94

... More
FLANGE WNRF,NPS 2, Class 150

12

-

7372.69

... More
FLANGE WNRF,NPS 3, Class 150

240

-

212558.59

... More
FLANGE WNRF,NPS 4, Class 150

5

-

6503.16

... More
FLANGE WNRF,NPS 6, Class 150

240

-

497953.39

... More
FLANGE WNRF,NPS 8, Class 150

10

-

39093.16

... More
BLIND FLANGE, NPS 3, Class - 150

26

-

21481.52

... More
BLIND FLANGE, NPS 6, Class - 150

5

-

9866.22

... More
BLIND FLANGE, NPS 8, Class - 150

3

-

10847.23

... More
ELBOW, 45 DEG, NPS 3 Schedule 80

30

-

41298.35

... More
ELBOW, 45 DEG, NPS 4 Schedule 80

2

-

2186.19

... More
ELBOW, 45 DEG, NPS 6 Schedule 80

30

-

72750.89

... More
ELBOW, 45 DEG, NPS 8 Schedule 80

4

-

9679.02

... More
ELBOW, 90 DEG, NPS 1 Schedule 80

10

-

4181.21

... More
ELBOW, 90 DEG, NPS 6 Schedule 80

70

-

266778.18

... More
ELBOW, 90 DEG, NPS 8 Schedule 80

4

-

17182.07

... More
REDUCER, CONCENTRIC, NPS 6 x 3, Sch 80 (Sprinkler piping)

20

-

75822.79

... More
REDUCER, CONCENTRIC, NPS 8 x 6, Sch 80 (Sprinkler piping)

5

-

29427.9

... More
REDUCER, CONCENTRIC, NPS 6 x 4, Sch 80 (Foam piping)

10

-

44626.54

... More
REDUCER, CONCENTRIC, NPS 3 x 2, Sch 80 (Foam piping)

12

-

10714.02

... More
REDUCER, ECCENTRIC, NPS 8 x 6, Sch 40 (Roof Drain)

1

-

1496.55

... More
TEE, EQUAL, NPS 3 Straight, Sch 80 (Sprinkler piping)

5

-

3499.17

... More
TEE, EQUAL, NPS 4 Straight, Sch 80 (Foam and Sprinkler piping)

10

-

14523.56

... More
TEE, EQUAL, NPS 6 Straight, Sch 80 (Sprinkler piping)

20

-

49119.86

... More
HALF COUPLING CS, NPS 1/2, Class 3000; (Sprinkler line)

384

-

131989.32

... More
Spiral Wound Metallic Gaskets (SWMG)

-

-

-

... More
NPS 24 (inlet/outlet line)

3

-

4853.2

... More
NPS 6 (Roof Drain)

40

-

11643.77

... More
ASBESTOS FREE(AF) FIBRE JOINTING SHEETS - AF159-Oil/ AF110-water and their equivalents as per intended application

-

-

-

... More
8" - 150#

10

-

2406.02

... More
6" - 150#

200

-

33323.2

... More
4" - 150#

4

-

485.88

... More
3" - 150#

200

-

14832.6

... More
2" - 150#

25

-

964.06

... More
1" - 150#

14

-

450

... More
Neoprene gasket 815mmø x 20mmthk

1

-

13466.75

... More
Steel Fasteners (Studs / bolts conforming ASTM A 193 B7 with two nuts conforming ASTM A 194 Gr. 2H, both heavy hex pattern along with two round washer) Teflon Coated

-

-

-

... More
3/4" dia x 4.75" long (8"-150#)

200

-

68994.6

... More
3/4" dia x 4.50" long (6"-150#)

500

-

184917.8

... More
5/8" dia x 4.00" long (4"-150#)

800

-

385406.88

... More
Steel Fasteners (Studs / bolts conforming ASTM A 193 B7 with two nuts conforming ASTM A 194 Gr. 2H, both heavy hex pattern along with two round washer)

-

-

-

... More
3/4" dia x 4.75" long (8"-150#)

100

-

13377.66

... More
3/4" dia x 4.50" long (6"-150#)

1400

-

149142.56

... More
1" UNC x 8" long to suit 24" shell manholes

100

-

35349.26

... More
1.25" Diameter X 10" long to suit 30" outlet nozzle

20

-

17812.34

... More
1.5" Diameter X 11.75" long to suit stirrers and inet nozzle

200

-

213799.48

... More
1" UNC x 6" long to suit clean out doors

100

-

64845.72

... More
Other components of piping

-

-

-

... More
6" Y-type CS strainers suitable for fire-water service. For Foam header line

6

-

144214.08

... More
Foam maker - Seamless SS 316L (Capacity 200 LPM)

12

-

488495.22

... More
Male instantaneous coupling conforming to IS:903 threaded with Non Return Valve suitable for foam pourer inlet connection (Size 63mm ). Material of coupling, spring & nut shall be SS 316. Male coupling fitted with SS 316 flange.

6

-

57923.6

... More
1" 3000LB half coupling for fixing drain valve of foam line

10

-

2279.17

... More
Sprinkler nozzles 1/2" SS 316L with K factor based on design requirement

384

-

309834.39

... More
Supply of miscellaneous items as per contract specification

-

-

-

... More
Flexible Joint OR flexible hose type roof Drains (6" diameter)

3

-

5746751.43

... More
Primary seal system for floating roof

250

-

2941580.7

... More
Secondary seal system for floating roof

250

-

2582893.15

... More
Submerged shunts

84

-

461118.13

... More
Galvanised Iron strips of 40 mm x 5 mm for tank shell to earth pit connection

300

-

153027.12

... More
Sacrificial (Aluminium-Indium-Zinc Alloy) Anodes for Cathodic Protection (CP) of Tank Bottom (product side)

550

-

685480.29

... More
Guide roller set for gauge well pipe (Brass roller sleeve 2nos x 730mm x 5mm thk + IS 2062 roller 2nos x 40mm dia x 820mm long + Gun metal bush 4nos)

1

-

40985.75

... More
Rolling ladder wheel pair assembly (6mm thk Brass wheel plate over MS wheel plate, MS hub with press fit Brass bush, MS shaft rod, s plit pin, washer and hex nut assembly)

1

-

45494.18

... More
Bypass conductor (Retractable Grounding Assembly type)

9

-

1011509.44

... More
Pressure Vacuum Relief Valve (Breather Valve) including in-line type flame arrestor (deflagration type) of size 4".

4

-

149887.75

... More
Water for Hydrotesting: - Arrangement of potable water for hydro-test of tank under M&I and transporting the same to fire water pond or directly to tank under M&I as directed by EIC/ Site Engineer including supply of material, consumables, manpower, tools, tackles etc. complete on round the clock basis through tankers etc. as per the advice of EIC/ Site Engineer. Water shall be timely arranged by the contractor before the start of hydrotesting of tank to avoid any delay in hydrotesting & thereafter commissioning of tank.

12000

-

1489348.8

... More
Composite Items

-

-

-

... More
Dismantling in part or full of steel plates / pipes / structural shapes including attachments, support structures / clamps etc by ga s cutting / plasma cutting / deseaming / unbolting etc, retrieval of usebale appurtenances (such as pontoon manholes, guage hatch, b reather vales, bleeder vents, nozzles, manholes etc), transportation of dismantled materials to Owners yard, stack in proper manner as directed by Owner's representative and complete in all respect including supervision, manpower,scaffolding, machinery, tools, tac kles, consumables, non-consumables, equipments and other requisite resources.

-

-

-

... More
Roof plates and attachments (5mm/6mm)

25

-

234335.61

... More
Annular bottom plates (14mm / 16mm)

5

-

37522.35

... More
Bottom and sketch plates (8mm / 6mm)

5

-

39230.81

... More
Primary / secondary wind girder plates / curb angle / guard rails

25

-

187760.42

... More
Stairways and rolling ladder

50

-

307820.11

... More
Piping all sizes / all thickness / all heights [Note: The unit of measurement shall be Inch-Meter]

9000

-

1088762.4

... More
Repair by weld-on-patch on tank roof, bottom, shell, wind girders and reinforcement plate in front of inlet- outlet nozzle: The scop e of repair shall include but not limited to taking delivery of plates 5mm / 6mm / 8mm/14mm from Owners stock yard, transporting to site, cutting/ fabricating to required size, fitment, welding and NDE including supply of tools, tackles, consumables and other req uisite resources. Repair scope includes weld on patches on bottom , roof and leg support pad on bottom. NDE covered in separate SOR item

-

-

-

... More
Patch repair on tank roof (upper / lower deck) and wind girder with 5/ 6mm plates

300

-

454840.44

... More
Patch repair on tank bottom with 5mm/ 6mm / 8mm plates

3500

-

6257486.9

... More
Patch repair on shell at wind girder area (8/10mm plates)

10

-

15781.08

... More
Pad plates on tank bottom under leg supports

150

-

264406.14

... More
Replacement works: The scope shall include but not limited to taking delivery of 5/6/8/10/12/14/16 mm thick owner supplied plates fr om owner's store & shifting them to tank, fabrication and erection as per drawing or site specific conditions, welding, testing of welds by suitable NDE (soap solutions under 3 to 5 PSI vacuum for leak proofness / DP test of root & capping of radial butt weld joi nts / Oil-Chalk Test of shell to annular joint), including supply of labours, equipments, tools, tackles, supervision and other requ isite resources to complete the work as per the technical specifications and instructions of EIC/ Site Engineer. NDE covered in sep arate SOR item

-

-

-

... More
Roof upper / lower deck / foam dam (5/6mm)

25

-

828821.38

... More
Annular plates (14/16mm)

45

-

1239795.79

... More
Bottom plates (8mm)

10

-

294256.48

... More
Wind girders (8/10/12mm)

20

-

690236.99

... More
Shell (10/14mm) including its dismantling

10

-

30956.71

... More
Water draw-off sumps on tank bottom (12/14/16mm) including dismantling of existing sumps

4

-

172888.41

... More
Roof drain sumps (8/10mm)

3

-

159795.28

... More
Emergency drain sumps (6/8mm)

6

-

98174.11

... More
Pontoon manhole neck (5/6mm)

5

-

17524.83

... More
Pontoon manhole cover (5/6mm)

5

-

11425.35

... More
Foam guard plate including pourer system (8/10mm)

12

-

310373.46

... More
Funnels for Water Draw Off/ Roof drain (8/10mm)

9

-

197532.64

... More
Weld joint strengthening of tank bottom/ Shell/ Roof/Annular lap/ butt joints by depositing additional weld beads (with 3.15mm or 4m m AWS 5.1 E7018 / AWS 5.1 E 6013 ) wherever required to restore the joints (butt or fillet) including supply of all equipments, cons umables, labours, tools, tackles etc. required to complete the work in all respects as per the specifications and directions of the EIC/ Site Engineer. Testing of weld joints is to be done by vacuum box/ oil chalk/ DP test (covered in separate SOR items) as per si te conditions and instructions of EIC/ Site Engineer.

-

-

-

... More
Weld joint strengthening using AWS A5.1 E6013

300

-

46122.66

... More
Weld joint strengthening using AWS A5.1 E7018

600

-

78007.44

... More
Shell : Penetrations/ Modification /replacement:

-

-

-

... More
Installation of new nozzle: The scope shall include but not limited to cutting a hole on shell 1st course, fabrication of 6" nozzle similar to existing design, installation, providing reinforcement plate at shell penetration joint, welding, carrying out post weld heat treatment including supply of manpower, tools, equipment, machinery, consumables and any other resources

3

-

112471.04

... More
Blinding old nozzle: Scope of work to include but not necessarily limited to blinding of existing 8” diameter nozzles including supp ly of manpower, tools, equipment, machinery, consumables and any other resources

1

-

3207.44

... More
Fabrication, erection and testing of roof drain assembly including supervision, manpower, equipment, machinery, transportation, too ls, tackles, consumables and any other resources and complete the work as per drawing. Note: supply of pipes, roof drain, valves, fittings etc under separate SOR item

3

-

318317.97

... More
Fabrication and erection of diphatch piping (32" sleeve + 24" guide pole with 5 smaller dia (2x8"+3x4" pipes inside)) including supervision, manpower, equipment, machinery, transportation, tools, tackles, consumables and any other resources and complete the w ork as per drawing. [Note: supply of pipes, brass roller, brass flats, gaskets etc under separate SOR item]

800

-

413632.48

... More
Fabrication only of piping system NPS - All sizes upto sch 80, carbon steel . This includes piping of foam, sprinkler , Water draw o ff, product draw off, roof drain interconnection and TRV line including manpower, equipment, machinery, transportation, tools, tackl es, consumables and any other resources and complete the work as per drawing. [Note: The unit of measurement shall be Inch-Dia. Supp ly of pipes and fittings covered under separate SOR]

5000

-

2995725

... More
Erection (NPS - All sizes; all heights, carbon steel/stainless steel) : Assembling, installation and hydro-testing of piping systems (comprising pipe, fittings, valves, gaskets, fasteners etc) including supervision, manpower, equipment, machinery, transportation, tools, tackles, consumables and any other resources and complete the work as per drawing. The scope shall include piping of all size s upto schedule 80 and installed at all heights. [Note: The unit of measurement shall be Inch-Meter]

9500

-

1461447.7

... More
Auto Bleeder Vents:- The scope shall include but not limited to dismantling of existing corroded 8"/6" diameter auto bleeder vents, fabrication, installation, welding, NDE including supply of channel gaskets along with tools, tackles, consumables and any other res ources. NDE covered in separate SOR item.

2

-

21667.63

... More
Breather valves:- The scope shall include but not limited to disassembling, cleaning, testing, calibration & assembling tank breathe r valve along with flame arrestor, cutting, shifting, fabrication, installation, welding, NDE of breather valve piping connected to roof (near seal) as per existing design, blinding of earlier opening of breather valve on lower / upper deck with 5/6 mm plates incl uding the supply of stainless steel wire mesh for breather valve along with tools, tackles, consumables and other requisite resource s. Supply of breather valve along with flame arrestor is separate SOR item. NDE covered in separate SOR item.

4

-

61660.9

... More
Shifting of Leg Support:- The scope shall include but not limited to dismantling of existing leg support, blinding, shifting leg sup port to new location including fabrication, installation and welding of 4 inch sleeve pipe, pad welding on lower and upper deck, NDE including supply of channel gaskets along with tools, tackles including jacking etc. consumables and any other resources. NDE cover ed in separate SOR item.

10

-

41129.73

... More
Structural Works:

-

-

-

... More
Structural Works (shapes/sections/bars ):- The scope of structural steel work shall include supply, fabrication and erection of shap es/sections/bars of roof, staircases, rolling ladder, railings, curb angle, roof rim angle, support structures of wind girders / coo ling rings / foam lines / foam dam / peripheral seals, clamps, handles etc including supply of manpower, equipments, consumables, to ols & tackles etc. complete as per drawings / existing design .

25

-

2333655.03

... More
Structural Works (Stairway and Rolling Ladder steps):- Supply of pre-fabricated GI (thickness of Zinc coating shall be minimum 100µm ) gratings and installation of the same, inclusive of welding, supply of manpower, equipments, consumables, non-consumables, tools, tackles etc. to complete the work in all respects as per tender specifications.

10

-

1123733.23

... More
Staircases, rolling ladder :- The scope of contractor shall include taking delivery of new 8/10mm plates from Owners stock yard, tr ansporting to site,fabrication and erection of shapes/sections/bars of roof, staircases etc including supply of manpower, equipments , consumables, tools & tackles etc. complete as per drawings / existing design

10

-

325489.67

... More
Stairways/wind girder/rolling ladder hand rails:- Supply of 40 mm nominal diameter heavy class pipes as per IS-1239 part-I (latest) for staiways, wind girder and sch. 80 pipe as per SA-106 GrB for rollig ladder. The pipes shall be galvanised as per IS-4736 (Zinc coating shall be minimum 400g/m2), fabrication, welding and erection of stairways/ hand rails including supply of all equipments, ma npower, tools, tackles, consumables, non-consumables etc. to complete the job as per directions of EIC/ Site Engineer.

200

-

155254.96

... More
Cable Tray for rim seal/tank radar gauging/other cables:- Supply, installation & fixing of pre-fabricated ladder type GI cable trays of width 50mm, 100mm, 150 mm, 300 mm, 450 mm & 600 mm as per site requirement and with required fasteners & accessories for laying of cables with standard rung spacings. Load for support span of 2.5 meter as 30, 60, 75 & 90 (in Kg/m) for width of 150 mm, 300 mm, 450 mm & 600 mm respectively with concentric static load as 70 Kg at the centre, with materials, manpower, tools, tackles, consumabl es etc. as per directions of EIC/ Site Engineer.

300

-

37007.16

... More
Boxing up and hydrotesting

-

-

-

... More
Boxing up of the tank:- Boxing up of the tank including supply and fitment of all required gaskets, studs with two nuts and two wash ers of ASTM A 193 Gr.B7/194 2H, providing gaskets between flange connections, tightening as per direction of EIC/ Site Engineer. Sup ply and fitment of nuts/ studs/ bolts of all roof and shell manholes, clean out doors, roof drains, water drains, product drains, in let & outlet nozzles, all body & manifold valves along with all necessary manpower, equipments, tools, tackles, consumables, non-con sumables etc. shall be in scope of contractor. ( Note: Supply of nuts/studs/bolts / gaskets for cleanout doors and shell manholes is covered under seperate SOR items)

1

-

219519.31

... More
Hydrotesting of the tank:- Hydrotesting including making arrangement for filling water for hydrotest upto roof floatation height (2 .5-3m ) or shell height as approved by EIC, transportation of water from fire water pond to tank under M&I by installing 2 nos. dies el engine/ electric motor driven water pumps [with a min. pumping capacity of min. 100 KL/hr] (IOCL to provide diesel/ electric supp ly for operating pumps on chargable basis), holding the roof in floating condition for minimum 48 hours, inspecting all the joints, manholes, ABP area, valves etc.; arrangement of all necessary equipments, pump(s) of sufficient capacity, laying of required pipings / hoses, necessary connections, materials, consumables, non-consumables, manpower, tools, tackles etc. both for pumping the water in to the tank and for emptying the water from the tank; attending leakages through flange joints/ any other joints, if any, as per dir ections of EIC/ Site Engineer (Water shall be supplied by the contractor - separate SOR item). It shall be Contractor's responsibili ty for timely arrangement of water required for hydrotesting. After successful completion of hydrotesting, the water shall be draine d out and shifted/ pumped to the fire water tank/ fire pond (using the above pump & piping) or to the OWS as per instructions of EIC / Site Engineer. Note: In case, water filling is done using Owner's pump(s), only 20% of the SOR rate shall be payable to the contractor.

1

-

283654.54

... More
Civil works

-

-

-

... More
RCC Supports for the Sprinkler Line:- Providing and laying Reinforced Cement Concrete in foundation & column, as directed by EIC, in cluding centering and shuttering where necessary and curing with water including supply of steel reinforcements, necessary labours, tools, tackles, consumables etc. to complete the work in all respect. (M200/ 1 : 1.5 : 3 - 1-Cement : 1.5-sand : 3-stone aggregate 2 0 mm nominal).

50

-

521221.34

... More
PCC 1:3:6:- Providing and laying plain cement concrete of mix 1:3:6 for support of fire water piping system, repair of circumferenti al drain/ radial drain/ apron area, including centering and shuttering where necessary and curing with water complete including cost of materials, equipments, manpower, tools, tackles, consumables, non-consumables etc. to complete the work in all respects as per t ender specifications and directions of EIC/ Site Engineer.

25

-

154425.72

... More
PCC 1:2:4:- Providing and laying plain cement concrete of mix 1:2:4 as directed for support of fire water piping system including, r epair of circumferential drain/ radial drain/ apron area, centering and shuttering where necessary and curing with water complete in cluding cost of materials, equipments, manpower, tools, tackles, consumables, non-consumables to complete the work as per tender spe cifications and directions of EIC/ Site Engineer (excluding cost of reinforcement)

125

-

997473.17

... More
Restoration of the tank dyke wall, surface drains (radial/ circumferential), apron area etc. inclusive of supply of all required sto nes, bricks, sand, gravels, cement, manpower, tools, tackles, equipments, consumables, non-consumables etc. to complete the work in all respects as per directions of EIC/ Site Engineer.

1

-

131662.15

... More
Repair of dyke at fire line/ foam line crossing including necessary supply of all bricks, cements, gravels etc., manpower, tools, ta ckles, consumables, non-consumables etc. to complete work in all respects as per direction of EIC/ Site Engineer.

1

-

8155.55

... More
Earth Pit Renovation & Tank Earthing:- Complete renovation of the earth pits inclusive of excavation of pits for laying of strips, s upply of all type of materials like requisite Copper strips, GI Strips, GI pipe, Copper-GI bi-metallic strip for GI to Copper connec tion, Charcoal, salt, fastening bolts, pipe caps, covers, all required manpower, tools, tackles, consumables, non-consumables, equip ments etc. and civil works with supply of all required materials as per tender specifications. Providing earth resistance values for new pits, connecting them to tank, checking and correcting the earthing bolts on tank shell, as per the instructions of EIC/ Site E ngineer. [Note: The scope includes supply of all requisite materials except for GI strips of 40x5MM which are covered under separate SOR]

10

-

701135.11

... More
Bituminous Carpet Rectification : Supply, laying as per profile and compaction of 50mm thk bituminous carpet (Premix bitumen layer c onsisting 80/ 100 grade black bitumen, coarse river sand and stone gravels in the ratio of 8:25:67) under Tank Bottom/ Annular Plate s including removal & disposal of damaged bitumen padding. This shall include supervision, manpower, machinery, tools, tackles, cons umables, non-consumables, equipments and other requisite resources.

50

-

34560.43

... More
Removal of damaged padding and strengthening of tank bottom Bitumen Padding (in eroded condition) in outer shell to annular joint lo cation approx. size (0.050M x 0.100M). Sealing with hot bitumen of requisite grade by providing concrete weir as per the direction o f EIC/ Site Engineer along with necessary equipments, manpower, tools, tackles, consumables, non-consumables etc. to complete the wo rk in all respects.

250

-

63091.65

... More
Tank Surface Preparation and Painting works: (refer Section-7 of detailed technical specs): The scope includes surface preparation t o defined standard and application of paints to required DFT as per tender specification inclusive of supply of paints, providing al l required manpower, tools, tackles, consumables, non-consumables, equipments etc. to complete the work in all respects as per techn ical specifications and instructions of EIC/ Site Engineer.

-

-

-

... More
Surface cleaning St2 for roof deck internals and Galvanised structures (Stairways, Rolling Ladder, Ladder Track, Gauging Platform)

14200

-

1114441.56

... More
Sweep blasting (SSPC-SP 7/NACE No. 4): Roof lower deck underside & shell internal

5500

-

999460

... More
Surface cleaning (SA2/ NACE No. 3): Tank bottom & roof to make surface suitable for visual/NDT inspection

10000

-

1748288

... More
Surface preparation using water washing with low TDS potable sweet water followed by copper slag blasting (conforming to SA 2.5 surf ace finish) and and profile of 40 to 70µm on all structures plates / pipes / roof / shell / bottom/ attachments at all heights [Note separate SOR item exist for scaffolding]

8500

-

3322337.2

... More
Surface preparation using water washing with low TDS potable sweet water followed by Automated blast cleaning to SA 2.5 surface fini sh and profile of 40 to 70µm- Tank Internals (Bottom / sketch /annular plates, sumps) and Roof

10000

-

5547062

... More
Primer application for Deck Internals: Priming with Red Oxide Zn-phosphate primer (30-35microns) for internal portions of pontoon bo xes, lower side of top deck, upper side of bottom deck, structurals in between the decks, structural supports of floating roof, incl uding the supply of paints, equipments, tools & tackles, labours, consumables etc. to complete the work as per direction of EIC/ Sit e Engineer.

13700

-

1328521.88

... More
Soil side of bottom plates: Supply and application of two coats @ 100µm each of surface tolerant epoxy including the supply of paint s, equipments, tools & tackles, labours, consumables etc. to complete the work as per direction of EIC/ Site Engineer.

150

-

41871.12

... More
Painting Galvanised structures and CS Piping (stairs, handrails, CS Pipe etc):- 1 coat x 50µm per coat of epoxy primer + 1coat x 125 µm per coat of surface tolerant epoxy by brush / roller/ airless spray application followed by one coat of aliphatic polyurethane @ 50µm including supply and application of paints, strip coat on all weld joints projection and supply of all equipments, tools, tackl es, manpower, consumables, non-consumables etc. as per specifications of paint manufacturer and directions of EIC/ Site Engineer. Co lour for sprinkler fire water piping shall be fire red & colour for foam pourer piping shall be canary yellow.

500

-

156001.9

... More
Painting of roof upper deck with associated appurtenances, shell and wind girders: One coat of inorganic zinc silicate primer to a d ry film thickness of minimum 60-75Microns by airless spray application followed by intermediate coat (1 coat x 250µm per coat or 2 c oats x 125µm per coat of Surface tolerant epoxy) and top coat (50µm DFT of Aliphatic polyurethane) by airless spray application, sea ler coat on primed surface by airless spray, stripe coat of surface tolerant epoxy on all weld joints/ projections by brush includin g supply of all requisite resources (paints, equipments, tools, tackles, manpower, consumables, non-consumables etc.) to complete th e work in all respects as per specifications and directions of the EIC/ Site Engineer. The total DFT shall be minimum 360 microns.

12200

-

9076102.16

... More
Primer only application: Tank Internals (Bottom / sketch /annular plates, sumps, nozzles, piping, shell up to 1.5m and other attachm ents) :- Final cleaning of prepared bottom surface by industrial vacuum cleaning, supply and application of 1 (one) coat of epoxy pr imer to a DFT of minimum 50 microns. The painting area also includes painting beneath leg support pipe, small patch plate assembly ( for anode installation). The bolt stem to be covered with tape so that it does not get painted as it has to provide electrical conne ctivity between plate and anode. This item is inclusive of supply of all required resources ( paints, equipments, manpower, consumab les, tools, tackles, consumables, non-consumables etc) to complete the work in all respects as per specifications and instructions o f the EIC/ Site Engineer.

5700

-

883863.66

... More
Finish coat of tank Internals (Bottom / sketch /annular plates, sumps, nozzles, piping, shell internal below roof lower deck and oth er attachments) :- After surface preparation and application of primer on entire tank internals, the primed surface shall be cleaned by industrial vacuum cleaner followed by supply and application of 2 (two) coats of solvent free epoxy to a DFT of minimum 200 micr ons per coat (grey and off-white shades for the 1st and 2nd coats respectively) or single coat of 400 microns (offwhite shade) by Ai rless spray, by brush for stripe coat, carrying out MIBK test, adhesion test, recording DFT, 100% holiday test to detect any pinhole s etc. The painting area also includes small patch plate assembly (for anode installation). The bolt stem to be covered with tape so that it does not get painted as it has to provide electrical connectivity between plate and anode. The total DFT (including primer) shall be minimum 450µm. This item is inclusive of supply of all required paints, all equipments, manpower, consumables, tools, tack les, consumables, non-consumables to complete the work in all respects as per specifications and instructions of the EIC/ Site Engin eer.

5700

-

3054881.94

... More
Radium sticker background: Reflective radium sticker printing (background sticker) and apply including pasting and fixing with suppl y of all manpower, equipments, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at any height e tc. as per instruction of EIC/ Site Engineer to complete work in all respects.

600

-

93300.24

... More
Radium sticker lettering: Reflective radium sticker letter printing and apply in background stickering including pasting and fixing with supply of all manpower, equipments, tools, tackles, consumables, non-consumables, scaffolding (separate SOR item) working at an y height etc. as per instruction of EIC/ Site Engineer to complete work in all respects.

600

-

93300.24

... More
Tank Bottom CP works:

-

-

-

... More
Installation of Galvanic Cathodic Protection (CP) for Tank Bottom (product side):- Installation, Testing and Commissioning of Sacrif icial Anodes Al-In-Zn Alloy including fasteners and Powercrete R-95 / Protal 7000 epoxy coating for carrying out the work of providi ng Cathodic Protection to Tank bottom plates as per terms and conditions of the Tender and instructions of EIC/ Site Engineer.

550

-

167727.56

... More
Service Items

-

-

-

... More
Tank Inspection and Other Works:

-

-

-

... More
RGA Dismantling and Re-installation:- Dismantling of RGA, shifting to the owner’s store/ workshop and shifting back all the componen ts of RGA to the work site after M&I and re-installation of RGA and other accessories/ components upon completion of M&I. Supply of all required equipments, tools, tackles, labours, consumables, non-consumables etc. to complete the work in all respects as per dire ction of EIC/ Site Engineer.

9

-

28409.67

... More
SWG Deflector plate Dismantling and Re-installation:- Dismantling of SWG Deflector plate, shifting to the owner’s store/ workshop an d shifting back all the components of SWG Deflector plate to the work site after M&I and re-installation of SWG Deflector plate and other accessories/ components upon completion of M&I. Supply of all required equipments, tools, tackles, labours, consumables, non-c onsumables etc. to complete the work in all respects as per direction of EIC/ Site Engineer. (Note: Only 50% of the SOR rate is paya ble if only dismantling is carried out without re-installation)

1

-

108198.37

... More
Locking of roof (from operation legs to maintenance legs) including all required manpower, equipments, tools, tackles, as per the di rection of EIC/ Site Engineer.

2

-

59581.15

... More
Locking of roof (from maintenance legs to operation legs) including all required manpower, equipments, tools, tackles, as per the di rection of EIC/ Site Engineer.

2

-

57969.46

... More
Dismantling of secondary seal : Dismantling, transportation and storing of complete secondary seal assembly along with all its acces sories in the owner's store yard or location as designated by EIC/ Site Engineer. This shall include all required tools, tackles, c onsumables, non-consumables, manpower and supervision etc. to complete the work in all respects.

250

-

129587.6

... More
Dismantling of primary seal : Dismantling, transportation and storing of complete primary seal assembly along with all its accessori es in the owner's store yard or location as designated by EIC/ Site Engineer. This shall include all required tools, tackles, consu mables, non-consumables, manpower and supervision etc. to complete the work in all respects.

250

-

151736.2

... More
Installation of Primary Seal: Installation of "liquid mounted" new PolyUrethane seal as per drawing / existing practise & specificat ions inclusive of tools, tackles, equipments, consumables, non-consumables, manpower and supervision for completing the work in all respects as per tender specification.

250

-

166946.4

... More
Installation of Secondary Seal:- Installation of secondary seal system with all related accessories etc. along with provision for in sertion of nozzle of foam based rim seal fire protection system inclusive of necessary equipments, consumables, tools, tackles, manp ower and supervision for completing the work in all respects as per tender specifications.

250

-

186404.6

... More
Installation of Submerged shunts : Installation of submerged shunts as per drawing and direction of Owners representative.

84

-

297499.76

... More
Residual crude oil transfer to other tank:- Installation of (steel/ flexible) piping (approx. 300 m), provision of suitable pump(s), installation, connecting and pumping of residual crude oil/ crude-water mix in the tank (approx. 5000 KLs) from all the water/ prod uct draw offs to the nearest crude oil storage tank as per instructions of EIC/ Site Engineer along with required manpower, tools, t ackles, equipments, consumables, non-consumables etc. to complete the work in all respects.

2

-

336332.76

... More
Opening all the shell & roof manholes (NPS 30 / 24) & flush-out doors as per instructions of EIC/ Site Engineer with all required ma npower, tools, tackles, consumables, non-consumables, equipments etc. to complete the work in all respect.

12

-

32806.6

... More
Making of ramp at the flush-out doors to enable the placement of truck for loading of sludge and restoration after desludging as per instructions of EIC/ Site Engineer with necessary manpower, tools, tackles, consumables, non-consumables etc. to complete the work in all respects.

2

-

13478.9

... More
Arrangement & Installation of air driven flame proof eductor fan(s) for ventilation for gas freeing the tank, as per instructions of EIC/ Site Engineer along with all required tools, tackles, manpower, consumables, non-consumables etc. Suitable documents for the e ductor fan indicating that the same is flame proof shall be submitted to the EIC for its approval prior to using it at the site. Dou ble earthing of all the equipments like motors, eductor fan etc. shall be done. Degasification shall be done inline with API RP 2016 .

6

-

296060.18

... More
Blinding of inlet, outlet & Surge Line and its TRV (NPS 24/36/30): Blinding of flow lines including connected TRV lines (if any) as per directions of EIC/ Site Engineer and tender specifications along with all required manpower, tools, tackles, consumables, non-co nsumables, supervision etc. to complete the work in all respects.

1

-

53733.15

... More
De-Blinding of inlet, outlet & Surge Line and its TRV (NPS 24/36/30): De-Blinding of flow lines including connected TRV lines (if an y) as per directions of EIC/ Site Engineer and tender specifications along with all required manpower, tools, tackles, consumables, non-consumables, supervision etc. to complete the work in all respects.

1

-

62286.11

... More
Shifting of Sludge to Sludge lagoon: The scope shall include entry into tank, making manual / mechanical arrangement for collecting and shifting of sludge in trucks/trolleys placed at the clean out doors, transporting to sludge lagoon / pit located inside Owner’s installation including supervision, supply of all manpower, equipments, tools & tackles, PPE's, breathing apparatus, fire and saf ety appliances etc. to complete the job in all respects as per the direction of EIC/ Site Engineer and tender specifications. Explos ive meter with calibration should be brought by the contractor to continuously monitor the LEL & oxygen level inside the tank. Durin g transportation of sludge, the tractors should be covered properly to avoid any spillage of sludge oil mix inside the station.

1000

-

1078720.6

... More
Tank bottom, shell internal & roof lower deck scraping:- Thorough scraping of the tank bottom, internal surface of shell upto 1.5 m from tank bottom, all pipings, roof supporting legs, water draw off sumps, lower surface of lower deck & other internals etc. as per direction of EIC/ Site Engineer including all required manpower, tools, tackles, consumables, non-consumables etc. to complete the work in all respects.

10600

-

735220.24

... More
Dyke cutting:- Cutting of dykes to enable movement of truck to pick up sludge from tank for pumping the sludge and to enable movemen t of equipments, materials, etc. at site, inclusive of provision of piping for maintaining flow in storm water drain and cleaning, w ater flushing of all hume chambers inside the dyke area & its plugging, as per instructions of EIC/ Site Engineer with necessary man power, tools, tackles, consumables, non-consumables etc. to complete the work in all respects.

1

-

76873.92

... More
Dismantling of cable tray for making approach inside tank dyke along with all required manpower, tools, tackles, consumables, non-co nsumables etc. to complete the work in all respects as per directions of EIC/ Site Engineer.

1

-

21412.65

... More
Installation of cable tray after dyke restoration (after M&I) along with all required manpower, tools, tackles, consumables, non-con sumables etc. to complete the work in all respects as per directions of EIC/ Site Engineer.

1

-

12889.94

... More
Tank Inspection as per API: Carrying out various inspection tests to determine the general condition of tank (79.5m dia x 18.1m ht.) from corrosion and integrity point of view such as Visual Inspection, Bottom & annular plate scanning (approx 5000 sqm ) using the scanners based on MFL (Magnetic Flux Leakage)/ LFET (Low Frequency Electromagnetic Technique), Remote Controlled shell thickness su rvey, manual UT measurement, bottom & shell settlement measurement, roundness/ovality and plumbness measurement of tank as detailed in technical specification inclusive of all skilled/ unskilled manpower, tools, tackles, consumables and submission of detailed repo rt of in hard copies as well as in soft copy with software (if any). All the findings & recommendation with proper diagram/layout sh all be provided in report. An API tank inspector shall visit the site at least once during or after inspection & certify the report.

1

-

1159933.03

... More
Shell scanning:- Tank surface scanning of shell near PWG/SWG weld areas covering 200mm width using the floor scanners based on Magne tic flux leakage (MFL)/ Low Frequency Electromagnetic Technique (LFET) inclusive of all skilled/ unskilled labours, tools, tackles, consumables and submission of detailed report of individual plates in two nos. of hard copies as well as in soft copies with softwar e(s) (if any) in pen drives/DVDs, the reports shall be approved by ASNT level-II inspector.

500

-

264839.2

... More
Testing of weld joints:- Cleaning & buffing of weld joints for testing of the lap/ butt joints on the tank bottom/ top deck/ bottom deck surface/ shell patches/ shell replacement/ annular plate/ tank shell piping welds by Oil Chalk test/ Dye Penetration (DP) test/ Vacuum box test by soap solution under 21 Kpa/ 3PSI vacuum for leak-proofness, including supply of all manpower, tools, tackles, equipments, consumables, non-consumables etc. to complete the work as per API 650 latest edition and instructions of EIC/ Site Engineer.

-

-

-

... More
Vacuum Box Test

4000

-

254502.4

... More
Dye Penetration Test

500

-

46509.7

... More
Oil Chalk Test

250

-

23355.15

... More
Submission of Tank M&I Reports and Drawings:- Submission of tank M&I reports indicating as-built dimensional drawings, bottom/ roof/ shell plate repairs (i.e. position patch repair & plate's replacement), their dimensions, maintenance carried out in the tank, deta iled earth pit drawings along with tank M&I reports of repair and maintenance as per the directions of EIC/ Site Engineer. Details o f desludging works, foam pourer and sprinkler system, it’s as-built drawings, their bill of materials indicating pipe, flanges, fitt ings, fasteners etc. used, tank painting details indicating brand & type of paints used, flexible roof drain make, details & dimensi ons, any other repair & maintenance works shall be incorporated in report submitted by contractor. Contractor shall submit 2 hard co pies and 2 soft copies of all the drawings and tank M&I reports to the EIC within 21 days of the completion of M&I works.

1

-

86002.41

... More
Tank calibration by EODR method:- Calibration of the tank by EODR method including all liaison work with the Competent Authority (M/ s Weights and Measures or as confirmed by Engineer-In-Charge) for approval of the calibration charts, preparation of the charts and payment of fees to the Competent Authority for approval, submission of charts in hard copies as well as soft copy, as per directions of EIC/ Site Engineer including all required arrangement for tank calibration, tools, tackles, consumables etc. to complete the wor k in all respects.

1

-

147253.25

... More
Dismantling & shifting of Stirrers and re-installation after M&I:- Dismantling of electric motors, stirrer assembly, gear boxes, cou pling, belt etc. of the tank stirrers, shifting to the owner’s store/ workshop and shifting back all the components of stirrers to t he work site after M&I and re-installation of electric motors, stirrer assembly, gear box, coupling, belts, supply of gaskets etc. a nd other accessories/ components upon completion of M&I, including alignment of stirrer. Supply of all required equipments, tools, t ackles, labours, consumables, non-consumables etc. to complete the work in all respects as per direction of EIC/ Site Engineer.

3

-

93938.43

... More
Earth Work:- Earth work excavation in foundation trenches or drains upto the depth of 1.5 m including the dressing of sides and ramm ing of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within Owners premises including all required tools, tackles, manpower, consumables, non-consumables etc. to complete in all respects as directed by the EI C/ Site Engineer.

200

-

94286.72

... More
Double Steel Scaffolding:- Erection of Unit Frame type Independent Scaffold as per IS 2750 for working at heights in line with all s afety guidelines, safety equipments, PPEs as indicated in the contract and as per instructions of EIC/ Site Engineer. Supply of all materials, equipments, tools, tackles, materials, consumables, manpower etc. for scaffolding erection works shall be in the scope of contractor. Erection of double steel scaffolding is to be done during dismantling, erection & welding of foam pourer piping, sprink ler rings/ piping, spiral stairways, primary wind girder & secondary wind girder, radium sticker works and during surface preparatio n and painting of tank shell.

3500

-

754014.1

... More
Dehumidification of tank internals during surface preparation, priming and painting works:- Dehumidification of tank internals durin g (a) blasting surface preparation; (b) priming, and; (c) painting to maintain conditions as per technical specifications. Uninterru pted dehumidification conditions shall be maintained till the bottom and internal surface preparation, priming & painting activities are over; as per EIC's instructions. Supply of dehumidifiers, condensers and all equipments with required manpower, tools, tackles, consumables, non-consumables etc. to maintain the minimum required conditions during surface preparation, priming & painting activi ties shall be in the scope of contractor.

1

-

1167668.68

... More
Reconditioning of Gate valve 24/30/ 36"-150 # (Make - VALVO / NEWAY etc. )(Note: The work includes removing valve from the line with hydra Transportation including loading and unloading of valve from site to your workshop for repairs, dismantling of valve and clea ning of valve parts with approved cleaning agent, taking assessment of defects in the valveTaking measurement of valve gate thicknes s. Repair of valve gateincluding dechrome plating, removing damaged portion by machining, metal deposition, final machining, surface grinding and lapping on both sides followed by hardchrome plating on both side and thereafter ensuring dimensions matching to the o riginal measurement and tolerance of the components Repairing of floating seat- 2 nos. by re-metalizing, grinding and lapping in scr atched area. Providing new glass-filled teflon seat in required characteristics, replacement of feedback springProviding new stem se als, gland packing etc. Straightening and hard-chrome plating of valve shaft, replacement of rubber components like Bonnet "O" Ring etc. Providing new bonnet gasket, bottom flange gasket MOC: Spiral WoundAssembly of valveSeat & Hydro test as per API 6D standard sh all be carried out at your workshop in presence of IOCL representative. Coloring with epoxy paint, transportation including loading and unloading of repaired valve from workshop to M&I site, re-installation of repaired valve on the line with hydra.

1

-

470184.4

... More
Transportation of various materials by tractor trailor with minum 2.5 cu. metre for leads upto 3 Km or part thereof including loadin g & unloading, with necessary labours, tools, tackles etc. of items such as cement, sand, scrap, debris, metal, pipes, earth, refrac tory, insulation, furniture, plants etc. all such materials from one place to another place including battery area and outside batte ry area all complete as per the direction of the EIC/ Site Engineer.

40

-

43117.67



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.