Water Supply And Sanitation Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Water Supply And Sanitation Department Tender
Eprocure
Opening Date3 Dec 2021
Closing Date29 Dec 2021
Tender Amount₹ 9,98,999 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 15,159Document Cost
₹ 1,000Tender Fee
₹ 894
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_WB_78256_1Bid Award Id
ViewTender No
21750-810Tender Authority
Water Supply And Sanitation Department ViewPurchaser Address
-Website
http://http://www.worldbank.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Provision for Shunt Capacitor to improve the power factor.
2
-
-
Cost of automated Water Controller/ Chlorination Unit
-
-
-
Supplying, fixing and testing at site Automatic electronnic type water level indication system with gun metal float sensor and electrical cable suitable for three phase pump submersible/monoblock to be fix on existing panel for OHSR complete in all respect.
1
-
-
Providing, Installing, testing & commissioning one No. Electronically actuated, Diaphragm Operated, Metering System, Chemical Dosing Chlorinator, suitable for delivering 0.5 to 6 Litres of Bleaching Powder solution/ Sodium Hypo solution per hour under maximum delivery pressure upto 7 Kg.cm2, and suction lift not less than 1.5 m, as per DWSS standard specifications.
1
-
-
REPAIR OF PUMP CHAMBER :-
Cost of Repair and white washing of Pump Chamber. (Detail attached)
1
-
-
Development of Water works site :-
-
-
-
Providing & fixing G.I. Barbed wire 3 ply fencing around the head works site in three rows complete in all respects including cost of winding wire & aluminum painting complete in all respects as per standard drawing.
336
-
-
Providing & fixing PCC fencing pole with 6' height, 3"x3" top and 4"x3" base provided with 3 Nos. Hooks complete in all respect.
52
-
-
Providing & fixing D. Hook complete with MS Bolts size 300mm x 18mm as per standard Drawing complete in all respect.
22
-
-
Construction of Foot Path with masonry toe wall 40 mm thick C.C. 1:2:4 Toping over 100 mm thick C.C. 1:8:16 and earth filling inside water works as per standard drawing complete in all respect.
28
-
-
Construction of Plinth Protection arround OHSR of 25000 Ltr. Capacity.
1
-
-
Cost of Connection on Existing Pipe Line
-
-
-
Providing proposed water connection to house hold up to wall with providing, laying jointing, testing G.I pipe lines 15mm i/d=2.50 mtr,B-Class as per CSR 28.36 (A), (Above GL),Prov. & Fixing MDPE Pipe 15 mm i/d with specials 2.00 mtr including cost of specials such as tees, bends, sockets, elbow etc. cutting, threading, and testing in trenches in the ground and ISI cock 15mm i/d GM ferrule as per IS: 2692 and 3" i/d clamp with c.i bib cock 15mm i/d as per IS:210 with stainless steel spindle of approved make.
75
-
-
Providing, Stringing out PVC pipes 6 Kg/Cm² ISI Marked as per ISI-4985 casting along the Trenches and laying the same in Trenches To correct alignment and gradients, cutting. Jointing and testing complete as per specifications for more than 3 mtr street width (Excavation mechanically).
-
-
-
90 mm o/d
1530
-
-
Providing & laying, jointing, fixing & testing ISI marked G.I. Pipes line (As Per IS 1239) B-Class premium make including cost of specials such as Tees, Bends, Sockets, Elbows etc., cutting, threading and testing in trenches in the ground complete in all respect in concrete paved streets. (Without Excavation)
-
-
-
50 mm I/d
85
-
-
Providing & Fixing C.I. / D.I. Flanged end, stem of SS (AIS 1410) and bronz (Gun Metal) working parts sluice valve ISI marked 14846-2000 including jointing, testing & cost of nut bolt and insertion sheets all carriage complete (with approval of Engineer-in-charge).
-
-
-
100 mm i/d
3
-
-
Cost of Connection on Proposed Pipe Line
-
-
-
Providing proposed water connection to house hold up to wall with providing, laying jointing, testing G.I pipe lines 15mm i/d=2.50 mtr,B-Class, (Above GL),Prov. & Fixing MDPE Pipe 15 mm i/d with specials 2.00 mtr including cost of specials such as tees, bends, sockets, elbow etc. cutting, threading, and testing in trenches in the ground and ISI cock 15mm i/d GM ferrule as per IS: 2692 and 3" i/d clamp with c.i bib cock 15mm i/d as per IS:210 with stainless steel spindle of approved make.
12
-
-
Providing, Fixing M.S Sign Board Including Painting and writing as per standard size DWSS complete in all respects.
1
-
-
COST OF OPERATIONAL & MAINTENACE
-
-
-
O. & M. cost for water supply scheme for Kale Bagh (3 Nos.) villages for 3 months
1
-
-
Item for which no rate or price has been entered it will not be paid for by the Employer when executed and shall be deemed covered by the rates and prices in the Bill of Quantities.
-
-
-
Unit rates and prices shall be quoted by the bidder in Indian rupee.
-
-
-
Where there is a discrepancy between the rate in figures and words, the rates in words will govern.
-
-
-
Where there is a discrepancy between the unit rate and the line item total resulting from multiplying the unit rate by quantity, the unit rate quoted shall govern.
-
-
-
Any item of work not included in the above contract schedule of rates and got done at the site of work; the same will be paid according to CSR-2010 subject to the premium or discount tendered by the contractor. In the case of non-schedule items, the decision of the Engineer-in-charge will be final and binding upon the contractor. In case any item which is a part of lump-sum rate is not executed at site, the amount of the same shall be deducted @CSR rates + Ceiling premium prevailing on the date of tender.
-
-
-
The work will be carried out in accordance with PWD Book of specifications – 1963 edition with upto date amendments.
-
-
-
Approximate quantities are given in the contract schedule of rates and these can vary at the time of execution of the work. The payment will be made according to the actual work done by the contractor.
-
-
-
All amendments issued on the common schedule of rates 2020. up to the date of opening of tenders will be applicable on the contract schedule of rates.
-
-
-
Contractor should clearly quote his rates in figures & words. Conditional tender will be rejected.
-
-
-
All items and rates provided in the DNIT are subject to in CSR-2020.
-
-
-
The Engineer-in-charge will have full powers to change the layout of the work covered in this contract if considered necessary.
-
-
-
No claim will be entertained from the contractor in case, any mistake in description rates or unit occurs in any item taken in this schedule while preparing this DNIT or on account of typing or comparison or over writing. The same will be rectified at any time as per common schedule of rates 2010 along with up to date amendments.
-
-
-
The arrangement of bricks at site of work would be done by the contractor at his own level from his own source.
-
-
-
For any other non-schedule items, the contractor will submit through Engineer-in-charge, the analysis of rates in triplicate based on purchased vouchers. A margin of 10% shall be allowed for the material components and 21.5% on labour components and contractor shall produce photo stat copies of the purchase vouchers in support of his claim. The decision of the Engineer-in-charge/competent authority in the matter shall be final and binding on the contractor.
-
-
-
All the extra items will be got approved from the competent authority and no premium will be allowed on non schedule items.
-
-
-
Pavement for the carriage of material shall be paid as per the rates quoted by the tenderer.
-
-
-
Time period allowed for completion of work in 2 month + 3 months
-
-
-
ii) If contractor failed to start the work within 7 days from the date of allotment, DWSS reserve the right to impose penalty or withdraw the work and propose action for debarring in future tendering or both; decision of Chief Engineer, shall be binding.
-
-
-
Item for which no rate or price has been entered in will not be paid for by the Employer when executed and shall be deemed covered by the other rates and prices in the Bill of Quantities..
-
-
-
We agree to execute the works in accordance with the approved drawings and technical specifications at a total contract price of INR.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements