Northern Railway Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Northern Railway - NR Tender

Goods
Civil And Construction
Bridge Construction
Ireps
Opening Date18 Jul 2024
Closing Date12 Aug 2024
Tender Amount₹ 34,29,106.72 
Notes
Download

Costs

Summary

Trd Work In C/w (i) Construction Of Lhs 5.0 X 5.0m At Manned L-xings No.c-37 On Asr- kemk Sec By Pushing Method In The Section Under Aden-ii/asr, (ii) Provision Of Lhs In Lieu of Level Crossing No. S-70 On Ldh-asr Section, (iii) Construction Of Rob At Km 6.934 In amritsar-khemkaran Section And (iv) Soft Improvement To Phagwara Railway Station By providing 6 Meter Wide Covered Fob With Lift, Waiting Hall, Uplifting The Face Of Pgw Station.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of single earth electrode with earth pit complete as per RDSO Drg No.ETI/OHE/P/7020 or latest

5

1182

5911.8

... More
Supply of Structure Bonds

50

745

37276

... More
Erection of Structure Bonds

50

197

9864.5

... More
Supply of Transverse (cross rail, inter-track, Z & special type) bonds

25

835

20886

... More
Erection of Transverse (cross rail, inter-track, Z & special type) bonds

25

137

3432.25

... More
Supply of Longitudinal bonds

50

525

26279

... More
Erection of Longitudinal bonds

50

124

6233.5

... More
Supply of earth bus

100

194

19471

... More
Erection of earth bus

100

68

6865

... More
Change of incumbrance / Re-droppering of span

12

1740

20890.92

... More
Slewing of OHE

12

1496

17962.08

... More
Supply of various types of 25KV Danger Boards / plates as per explanatory notes

25

436

10908.25

... More
Erection of various types of 25KV Danger Boards / plates as per explanatory notes

25

55

1388.25

... More
Change of incumbrance / Re-droppering of span-@ 100% Extra on erection rates for work done under Power Block

12

1740

20890.92

... More
Slewing of OHE -@ 100% Extra on erection rates for work done under Power Block

12

1496

17962.08

... More
Supply of Concrete for foundation and plinth in other than hard & rocky soil

8

4975

39806.4

... More
Erection of Concrete for foundation and plinth in other than hard & rocky soil

8

1311

10492.48

... More
Supply of galvanized steel fabricated masts/ other supporting structure

1

108323

108323.8

... More
Erection of galvanized steel fabricated masts/ other supporting structure

1

8648

8648.33

... More
Supply of fabricated and galvanized steel work (SPS) other than mast with necessary components

0.54

-

60761.7

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components

0.54

-

3902.47

... More
Supply of Single bracket assembly (without insulator)

2

15225

30451.58

... More
Erection of Single bracket assembly

2

1615

3230.7

... More
Supply of Porcelain type Stay tube and Bracket Tube insulators (CD 1050mm) for single bracket assembly

2

9207

18414.3

... More
Erection of Porcelain type Stay tube and Bracket Tube insulators (CD 1050mm) for single bracket assembly

2

1087

2175.66

... More
Supply of Structure Bonds

4

677

2711.36

... More
Erection of Structure Bonds

4

113

452.2

... More
Supply of longitudinal bonds

5

589

2948.55

... More
Erection of longitudinal bonds

5

88

444.2

... More
Cutting and removal of existing structure

1

908

908.98

... More
Dismantling of fabricated steel other than mast

2

12721

25443.22

... More
Slewing of OHE

8

1520

12166.88

... More
Change of incumbrance / redroppering of spans

8

1424

11397.76

... More
Transfer of equipments from one mast or support to another

2

2891

5782.8

... More
Handling, Leading, loading and transportation charges for Rly supply material from different Railway site and released material from different Railway site, if any to concerned TRD Depot

0.8

-

1794.59

... More
Erection of galvanized steel fabricated masts/ other supporting structure -@ 100% Extra on erection rates for work done under Power Block

1

8648

8648.33

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components -@ 100% Extra on erection rates for work done under Power Block

0.54

-

3902.47

... More
Erection of Single bracket assembly -@ 100% Extra on erection rates for work done under Power Block

2

1615

3230.7

... More
Erection of Porcelain type Stay tube and Bracket Tube insulators (CD 1050mm) for single bracket assembly -@ 100% Extra on erection rates for work done under Power Block

2

1087

2175.66

... More
Dismantling of Bracket Assembly -@ 100% Extra on erection rates for work done under Power Block

2

1355

2711

... More
Cutting and removal of existing structure -@ 100% Extra on erection rates for work done under Power Block

1

908

908.98

... More
Dismantling of fabricated steel other than mast -@ 100% Extra on erection rates for work done under Power Block

1

12721

12721.61

... More
Slewing of OHE -@ 100% Extra on erection rates for work done under Power Block

8

1520

12166.88

... More
Change of incumbrance / redroppering of spans -@ 100% Extra on erection rates for work done under Power Block

8

1424

11397.76

... More
Transfer of equipments from one mast or support to another -@ 100% Extra on erection rates for work done under Power Block

2

2891

5782.8

... More
Erection of galvanized steel fabricated masts/ other supporting structure -@ 50% Extra on erection rates for work done mannualy under Power Block

1

4324

4324.17

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components -@ 50% Extra on erection rates for work done mannualy under Power Block

0.54

-

1951.24

... More
Preparation of drawing as per RDSO design for Over Head Equipment

1

-

10166.62

... More
Supply of Concrete for foundation and plinth in other than hard & rocky soil

10

5963

59639.1

... More
Erection of Concrete for foundation and plinth in other than hard & rocky soil

10

1480

14809.6

... More
Supply of galvanized steel fabricated masts / other supporting structure

1.3

120651

156846.82

... More
Erection of galvanized steel fabricated masts / other supporting structure

1.3

8847

11502.11

... More
Supply of fabricated and galvanized steel work (SPS) other than mast with necessary components

0.15

-

18259.98

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components

0.15

-

1205.72

... More
Supply of Single bracket assembly (without insulator)

3

19049

57147.3

... More
Erection of Single bracket assembly

3

1877

5632.59

... More
Supply of Stay and bracket tube Porcelain type insulators (CD 1050mm) for single bracket assembly

3

9762

29288.79

... More
Erection of insulators (CD1050mm) for single bracket assembly

3

1231

3694.47

... More
Supply of OHE with complete fitting (For Conventional type) without Contact & Catenary Wires as per explanatory Notes

0.25

-

5729.79

... More
Erection of OHE with complete fitting (For Conventional type) without Contact & Catenary Wires as per explanatory Notes

0.25

-

5538.97

... More
Supply of copper jumper wire

2

6766

13532.28

... More
Erection of copper jumper wire

2

681

1362.84

... More
Manufacturing supply of Retro Reflective type structure Number plate as per RDSO drg. No.ETI / OHE / P / 7503 or latest along with all fixing arrangement.

5

594

2974.2

... More
Erection / Fixing of Retro Reflective type structure Number plate as per RDSO drg. No.ETI / OHE / P / 7503 or latest along with all fixing arrangement.

5

74

374.35

... More
Supply of various types 25KV caution Board / Plates as per explanatory Notes

6

327

1965.54

... More
Erection of various types 25KV caution Boards / plates as per explanatory Notes

6

77

467.34

... More
Supply of single earth electrode with earth pit complete as per RDSO Drg No. ETI / OHE / P / 7020 or latest

2

3706

7413.58

... More
Erection of single earth electrode with earth pit complete as per RDSO Drg No. ETI / OHE / P / 7020 or latest

2

1203

2407.36

... More
Supply of Structure Bonds

10

794

7946.8

... More
Erection of Structure Bonds

10

190

1900

... More
Erection of Transverse (cross rail, inter-track, Z & special type) bonds

4

128

515.04

... More
Supply of Longitudinal bonds

4

608

2433

... More
Erection of Longitudinal bonds

4

122

488.92

... More
Supply of earth bus

20

199

3993

... More
Erection of earth bus

20

70

1406.8

... More
Supply of splicing and extension of anchored over head equipment with components

1

6163

6163

... More
Erection of splicing and extension of anchored over head equipment with components

1

5392

5392.17

... More
Erection of Contact Wire only after dismentling of Catenary wire under FOB (Overline structure)

0.05

-

886.42

... More
Supply of Contact wire Ending Clamp

4

415

1660.32

... More
Supply of Catenary wire Ending Clamp

4

857

3431.32

... More
Supply of electrolytic Copper Hard drawn Dropper wire 5mm dia

5

1109

5549.55

... More
Dismantling of Bracket Assembly

3

1439

4319.85

... More
Cutting and removal of existing structure

3

1006

3020.52

... More
Dismantling of fabricated steel other than mast

0.15

-

2144.22

... More
Dismantling of copper jumper

3

612

1836.48

... More
Change of incumbrance / Re-droppering of span

4

1657

6629.84

... More
Slewing of OHE

8

1496

11974.72

... More
Preparation of computerized OHE Layout Plan (LOP) for station Yards

4

-

18662.6

... More
Supply of various types of Staff and Public Caution / Danger Boards as per explanatory Notes

6

256

1538.28

... More
Erection of various types of Staff and Public Caution / Danger Boards as per explanatory Notes

6

55

332.04

... More
Supply of Contact wire Dropper Clip assembly (1180) with component

36

79

2845.08

... More
Handling, Leading, loading and Transportation charges for Railway supply material from different Railway sites and released material from different Railway sites, if any to concerned TRD Depot

1.3

2498

3247.87

... More
Erection of galvanized steel fabricated masts / other supporting structure -@ 100% Extra on erection rates for work done under Power Block

1.3

8847

11502.11

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components -@ 100% Extra on erection rates for work done under Power Block

0.15

-

1205.72

... More
Erection of Single bracket assembly -@ 100% Extra on erection rates for work done under Power Block

3

1877

5632.59

... More
Erection of insulators (CD1050mm) for single bracket assembly -@ 100% Extra on erection rates for work done under Power Block

3

1231

3694.47

... More
Erection of OHE with complete fitting (For Conventional type) without Contact & Catenary Wires as per explanatory Notes -@ 100% Extra on erection rates for work done under Power Block

0.25

-

5538.97

... More
Erection of copper jumper wire -@ 100% Extra on erection rates for work done under Power Block

2

681

1362.84

... More
Erection of splicing and extension of anchored over head equipment with components -@ 100% Extra on erection rates for work done under Power Block

1

5392

5392.17

... More
Erection of Contact Wire only after dismentling of Catenary wire under FOB (Overline structure) -@ 100% Extra on erection rates for work done under Power Block

0.05

-

886.42

... More
Dismantling of Bracket Assembly -@ 100% Extra on erection rates for work done under Power Block

3

1439

4319.85

... More
Cutting and removal of existing structure -@ 100% Extra on erection rates for work done under Power Block

3

1006

3020.52

... More
Dismantling of fabricated steel other than mast -@ 100% Extra on erection rates for work done under Power Block

0.15

-

2144.22

... More
Dismantling of copper jumper -@ 100% Extra on erection rates for work done under Power Block

3

612

1836.48

... More
Change of incumbrance / Re-droppering of span -@ 100% Extra on erection rates for work done under Power Block

4

1657

6629.84

... More
Slewing of OHE -@ 100% Extra on erection rates for work done under Power Block

8

1496

11974.72

... More
Erection of galvanized steel fabricated masts / other supporting structure -@ 50% Extra for steel erection work done manually under Power Block

1.3

4423

5751.06

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components -@ 50% Extra for steel erection work done manually under Power Block

0.15

-

602.86

... More
Preparation of drawing as per RDSO design for Over Head Equipments.

1

-

7475.32

... More
Supply of Concrete for foundation and plinth in other than hard & rocky soil

30

4975

149274

... More
Erection of Concrete for foundation and plinth in other than hard & rocky soil

30

1311

39346.8

... More
Supply of galvanized steel fabricated masts/ other supporting structure

5

108323

541619

... More
Erection of galvanized steel fabricated masts/ other supporting structure

5

8648

43241.65

... More
Supply of fabricated and galvanized steel work (SPS) other than mast with necessary components

1

110616

110616.88

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components

1

7104

7104.47

... More
Supply of Single bracket assembly (without insulator)

11

15225

167483.69

... More
Erection of Single bracket assembly

11

1615

17768.85

... More
Supply of porcelain type Stay tube and Bracket tube insulators (CD 1050mm) for single bracket assembly

11

9207

101278.65

... More
Erection of porcelain type Stay tube and Bracket tube insulators (CD 1050mm) for single bracket assembly

11

1087

11966.13

... More
Supply of OHE as per explanatory Notes

1

-

18737.82

... More
Erection of OHE as per explanatory Notes

1

-

18108.52

... More
Supply of Guy Rod Assembly

1

7742

7742.66

... More
Erection of Guy Rod Assembly

1

848

848.54

... More
Supply of 9 tonne Porcelain insulator (CD 1050mm)

1

6236

6236.48

... More
Erection of 9 tonne insulator (CD 1050mm)

1

1088

1088.47

... More
Manufacturing / supply of retro reflective type structure No. plate as per RDSO drg. No.ETI/OHE/P/7503 or latest along with all fixing arrangement.

4

525

2103.48

... More
Erection / Fixing of retro reflective type structure No. plate as per RDSO drg. No.ETI/OHE/P/7503 or latest along with all fixing arrangement.

4

66

264.88

... More
Supply of Structure Bonds

20

677

13556.8

... More
Erection of Structure Bonds

20

113

2261

... More
Supply of transverse (cross rail, intertrack, Z) bonds

10

910

9103.5

... More
Erection of transverse (cross rail, intertrack, Z) bonds

10

83

839

... More
Supply of longitudinal bonds

50

589

29485.5

... More
Erection of longitudinal bonds

50

88

4442

... More
Supply of splicing and extension of anchored over head equipment with components

1

6219

6219.77

... More
Erection of splicing and extension of anchored over head equipment with components

1

5342

5342.25

... More
Dismantling of Bracket Assembly

6

1355

8133

... More
Cutting and removal of existing structure

2

908

1817.96

... More
Dismantling of fabricated steel other than mast

0.5

-

6360.81

... More
Slewing of OHE

20

1520

30417.2

... More
Dismantling of Guy Rod Assembly

1

513

513.67

... More
Change of incumbrance / re-droppering of spans

12

1449

17388.72

... More
Supply and erection of "Caution live wire" Board size 400x270x2mm with supply of fixing material (Clamp, back flat strip & fasterners)

10

2056

20563.3

... More
Supply and erection of "Caution clearance to OHE nearby restricted" Board size 450x270x2mm with supply of fixing material (Clamp, back flat strip & fasterners)

10

1149

11492.1

... More
Preparation of computerized OHE Layout Plan (LOP) for station Yards

5

-

23207.6

... More
Handling, Leading, loading and transportation charges for Rly supply material from different Railway site and released material from different Railway site, if any to concerned TRD Depot

6

2243

13459.44

... More
Erection of galvanized steel fabricated masts/ other supporting structure -@ 100% Extra on erection rates for work done under Power Block

5

8648

43241.65

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components -@ 100% Extra on erection rates for work done under Power Block

1

7104

7104.47

... More
Erection of Single bracket assembly -@ 100% Extra on erection rates for work done under Power Block

11

1615

17768.85

... More
Erection of Porcelain type Stay tube and Bracket Tube insulators (CD 1050mm) for single bracket assembly -@ 100% Extra on erection rates for work done under Power Block

11

1087

11966.13

... More
Erection of OHE as per explanatory Notes -@ 100% Extra on erection rates for work done under Power Block

1

-

18108.52

... More
Erection of Guy Rod Assembly -@ 100% Extra on erection rates for work done under Power Block

1

848

848.54

... More
Erection of 9 tonne insulator (CD 1050mm) -@ 100% Extra on erection rates for work done under Power Block

1

1088

1088.47

... More
Erection of splicing and extension of anchored over head equipment with components- @ 100% Extra on erection rates for work done under Power Block

1

5342

5342.25

... More
Dismantling of Bracket Assembly -@ 100% Extra on erection rates for work done under Power Block

6

1355

8133

... More
Cutting and removal of existing structure -@ 100% Extra on erection rates for work done under Power Block

2

908

1817.96

... More
Dismantling of fabricated steel other than mast -@ 100% Extra on erection rates for work done under Power Block

0.5

-

6360.81

... More
Slewing of OHE -@ 100% Extra on erection rates for work done under Power Block

20

1520

30417.2

... More
Dismantling of Guy Rod Assembly -@ 100% Extra on erection rates for work done under Power Block

1

513

513.67

... More
Erection of galvanized steel fabricated masts/ other supporting structure -@ 50% Extra for steel erection work done manually under Power Block .

5

4324

21620.85

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components -@ 50% Extra for steel erection work done manually under Power Block

1

3552

3552.23

... More
GST @ 18%

1

523084

523084.08



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.