Northern Railway Tender

... More
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Northern Railway - NR Tender

Works
Telecommunication Services
Ireps
Opening Date5 Mar 2025
Closing Date27 Mar 2025
Tender Amount₹ 2,10,56,945.29 
Notes
Download

AI Insights

Bid Capacity
... View More
To determine the bid capacity required, we look at the conditions that specify the requirements for similar works and their values. The tender requires the bidder to have successfully completed any of the following during the last 07 years: - Three similar works each costing not less than 30% of the advertised value of the tender. - Two similar works each costing not less than 40% of the advertised value of the tender. - One similar work costing not less than 60% of the advertised value of the tender. Given the advertised value is 21056945.29, we can calculate the bid capacity required as follows: - For three similar works: 30% of 21056945.29 = 0.3 * 21056945.29 = 6317083.587 - For two similar works: 40% of 21056945.29 = 0.4 * 21056945.29 = 8422778.116 - For one similar work: 60% of 21056945.29 = 0.6 * 21056945.29 = 12634107.174 Therefore, the bid capacity required in terms of value for the given tender can be determined based on these calculations.
Technical Capacity
... View More
The required prior work experience for the bidder involves completing specific similar works within the last 7 years. The bidder must have successfully completed one of the following: - Three similar works each costing not less than 30% of the advertised value of the tender, - Two similar works each costing not less than 40% of the advertised value of the tender, - One similar work costing not less than 60% of the advertised value of the tender. A similar work is defined as the design, supply, erection, testing, and commissioning of 50 HZ, single phase 25 kV AC OHE. Additionally, the bidder should have a minimum average annual contractual turnover, calculated based on the advertised value of the tender and the number of years prescribed for completion of the work. The specific details of the work executed, including values and percentages of similar works completed, should be provided by the bidder as per the given annexures, along with certified audited balance sheets.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of galvanized steel fabricated masts / other supporting structure 05

27

120651

3257587.8

... More
Erection of galvanized steel fabricated masts / other supporting structure

27

8847

238890.06

... More
Supply of fabricated and galvanized steel work (SPS) other than mast with necessary components

8

121733

973865.68

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components 08

8

8038

64305.2

... More
Supply of Single bracket assembly (without insulator) 09

95

19049

1809664.5

... More
Erection of Single bracket assembly

95

1877

178365.35

... More
Supply of Stay and bracket tube Porcelain type insulators (CD 1050mm) for single bracket assembly

95

9762

927478.35

... More
Erection of insulators for single bracket assembly

-

-

11

... More
Supply of OHE with complete fitting (For Conventional type) without Contact & Catenary Wires as per explanatory Notes

-

-

12

... More
Erection of OHE with complete fitting (For Conventional type) without Contact & Catenary Wires as per explanatory Notes 14

-

-

13

... More
Supply of copper jumper wire 15

12

6766

81193.68

... More
Erection of copper jumper wire 16

12

681

8177.04

... More
Supply of Guy Rod Assembly 17

8

9281

74255.76

... More
Erection of Guy Rod Assembly 18

8

1067

8539.12

... More
Supply of 9-Tonne Porcelain insulator (CD 1050mm) 19

40

7698

307938.8

... More
Erection of 9-Tonne insulators

40

1220

48812.4

... More
Manufacturing supply of Retro Reflective type structure Number plate as per RDSO drg. No.ETI / OHE / P / 7503 or latest along with all fixing arrangement.

50

594

29742

... More
Erection / Fixing of Retro Reflective type structure Number plate as per RDSO drg. No.ETI / OHE / P / 7503 or latest along with all fixing arrangement. 22

50

74

3743.5

... More
Supply of various types 25KV caution Board / Plates as per explanatory Notes 23

25

327

8189.75

... More
Erection of various types 25KV caution Boards / plates as per explanatory Notes

25

77

1947.25

... More
Supply (without insulator) of 25KV Single Pole(SP) Isolator without earth contact assembly 25

4

47022

188088.48

... More
Erection of 25KV Single Pole(SP) Isolator without earth contact assembly 26

4

4121

16486.08

... More
Supply of 25KV post / pedestal insulators for isolators 27

28

8092

226578.24

... More
Erection of 25KV post / pedestal insulators for isolators 28

28

343

9610.72

... More
Supply of copper bus bar 18mm 29

30

1270

38115.6

... More
Erection of copper bus bar 18mm 30

30

112

3370.2

... More
Supply & erection of post and operating rod insulator

4

18019

72079.2

... More
Supply of single earth electrode with earth pit complete as per RDSO Drg No. ETI / OHE / P / 7020 or latest

4

3706

14827.16

... More
Erection of single earth electrode with earth pit complete as per RDSO Drg No. ETI / OHE / P / 7020 or latest 33

4

1203

4814.72

... More
Supply of an Earth contact assembly in an isolator 34

2

7329

14659.7

... More
Erection of an Earth contact assembly in an isolator

2

1106

2212.4

... More
Supply of Section Insulator assembly including bar insulator assembly for conventional OHE 36

-

-

35

... More
Erection of Section Insulator assembly including bar insulator for conventional OHE 37

6

3076

18457.86

... More
Supply of Structure Bonds 38

100

794

79468

... More
Erection of Structure Bonds 39

100

190

19000

... More
Supply of Transverse (cross rail, inter-track, Z & special type) bonds 40

40

952

38098.4

... More
Erection of Transverse (cross rail, inter-track, Z & special type) bonds 41

40

128

5150.4

... More
Supply of Longitudinal bonds 42

400

608

243300

... More
Erection of Longitudinal bonds 43

400

122

48892

... More
Supply of earth bus 44

488

199

97429.2

... More
Erection of earth bus 45

487

70

34255.58

... More
Supply of material without insulators for termination of OHE conductor 46

8

6138

49104

... More
Erection of material for termination of OHE conductor 47

8

845

6762.96

... More
Supply of splicing and extension of anchored over head equipment with components 48

4

6163

24652

... More
Erection of splicing and extension of anchored over head equipment with components 49

4

5392

21568.68

... More
Dismantling of Bracket Assembly 50

60

1440

86409

... More
Dismantling of Guy Rod Assembly 51

5

691

3459.45

... More
Dismantling of fabricated steel other than mast 52

12

14294

171537.48

... More
Dismantling of OHE / Alluminium Feeder Wire 53

-

16610

16610.88

... More
Adjustment of insulated / un-insulated overlap 55

11

1454

16003.13

... More
Dismantling of section insulator assembly 56

3

3330

9992.46

... More
Supply of different types of 160 Sqmm Copper Jumper wire as per explanatory Notes 57

15

1916

28753.65

... More
Erection of different types of 160 Sqmm Copper Jumper wire as per explanatory Notes

15

343

5151.9

... More
Supply and erection of "Electric Engine Stop" Board size 900x600x 2mm with supply of fixing material (Clamp, back flat strip & fasterners)

10

3585

35857.6

... More
Supply and erection of "Caution live wire" Board size 400x270x2mm with supply of fixing material (Clamp, back flat strip & fasterners)

30

2048

61454.7

... More
Supply and erection of "Power Block Working Limit" Board size 450x450x2mm with supply of fixing material (Clamp, back flat strip & fasterners) 61

40

1445

57808

... More
Supply of various types of 25KV Danger Boards / plates as per explanatory notes 62

-

-

61

... More
Erection of various types of 25KV Danger Boards / plates as per explanatory notes

110

56

6176.5

... More
Handling, Leading, loading and Transportation charges for Railway supply material from different Railway sites and released material from different Railway sites, if any to concerned TRD Depot

18

2624

47235.24

... More
Erection of galvanized steel fabricated masts / other supporting structure - @ 100% Extra on erection rates for work done under Power Block

27

8847

238890.06

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components -@ 100% Extra on erection rates for work done under Power Block

8

8038

64305.2

... More
Erection of Single bracket assembly -@ 100% Extra on erection rates for work done under Power Block

95

1877

178365.35

... More
Erection of insulators for single bracket assembly -@ 100% Extra on erection rates for work done under Power Block

95

1231

116991.55

... More
Erection of copper jumper wire -@ 100% Extra on erection rates for work done under Power Block

12

681

8177.04

... More
Erection of Guy Rod Assembly -@ 100% Extra on erection rates for work done under Power Block

8

1067

8539.12

... More
Erection of 9-Tonne insulators -@ 100% Extra on erection rates for work done under Power Block

40

1220

48812.4

... More
Erection of 25KV Single Pole(SP) Isolator without earth contact assembly -@ 100% Extra on erection rates for work done under Power Block

4

4121

16486.08

... More
Erection of 25KV post / pedestal insulators for isolators -@ 100% Extra on erection rates for work done under Power Block

28

343

9610.72

... More
Erection of copper bus bar 18mm -@ 100% Extra on erection rates for work done under Power Block

30

112

3370.2

... More
Erection of an Earth contact assembly in an isolator -@ 100% Extra on erection rates for work done under Power Block

2

1106

2212.4

... More
Erection of Section Insulator assembly including bar insulator for conventional OHE -@ 100% Extra on erection rates for work done under Power Block

6

3076

18457.86

... More
Erection of material for termination of OHE conductor -@ 100% Extra on erection rates for work done under Power Block

8

845

6762.96

... More
Erection of splicing and extension of anchored over head equipment with components -@ 100% Extra on erection rates for work done under Power Block

4

5392

21568.68

... More
Dismantling of Bracket Assembly -@ 100% Extra on erection rates for work done under Power Block

60

1440

86409

... More
Dismantling of Guy Rod Assembly -@ 100% Extra on erection rates for work done under Power Block

5

691

3459.45

... More
Dismantling of fabricated steel other than mast -@ 100% Extra on erection rates for work done under Power Block

12

14294

171537.48

... More
Dismantling of OHE / Alluminium Feeder Wire -@ 100% Extra on erection rates for work done under Power Block

-

-

82

... More
Adjustment of insulated / un-insulated overlap -@ 100% Extra on erection rates for work done under Power Block

11

1454

16003.13

... More
Dismantling of section insulator assembly -@ 100% Extra on erection rates for work done under Power Block

3

3330

9992.46

... More
Erection of different types of 160 Sqmm Copper Jumper wire as per explanatory Notes -@ 100% Extra on erection rates for work done under Power Block

15

343

5151.9

... More
Erection of galvanized steel fabricated masts / other supporting structure -@ 50% Extra for steel erection work done mannualy under Power Block

27

4423

119445.03

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components -@ 100% Extra on erection rates for work done under Power Block

8

4019

32152.64

... More
Preparation of drawing as per RDSO design for Over Head Equipment 02

-

81332

81332.96

... More
Supply of Concrete for foundation and plinth in other than hard & rocky soil 03

50

5963

298195.5

... More
Erection of Concrete for foundation and plinth in other than hard & rocky soil 04

50

1480

74048

... More
Supply of galvanized steel fabricated masts / other supporting structure 05

4

120651

482605.6

... More
Erection of galvanized steel fabricated masts / other supporting structure

4

8847

35391.12

... More
Supply of fabricated and galvanized steel work (SPS) other than mast with necessary components

6

121733

730399.26

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components 08

6

8038

48228.9

... More
Supply of Single bracket assembly (without insulator) 09

25

19049

476227.5

... More
Erection of Single bracket assembly

25

1877

46938.25

... More
Supply of Stay and bracket tube Porcelain type insulators (CD 1050mm) for single bracket assembly 11

25

9762

244073.25

... More
Erection of insulators for single bracket assembly

25

1231

30787.25

... More
Erection of OHE with complete fitting (For Conventional type) without Contact & Catenary Wires as per explanatory Notes 14

-

-

13

... More
Supply of copper jumper wire 15

6

6766

40596.84

... More
Erection of copper jumper wire 16

6

681

4088.52

... More
Supply of Guy Rod Assembly 17

4

9281

37127.88

... More
Erection of Guy Rod Assembly 18

4

1067

4269.56

... More
Supply of 9-Tonne Porcelain insulator (CD 1050mm) 19

20

7698

153969.4

... More
Erection of 9-Tonne insulators 20

20

1220

24406.2

... More
Supply of regulating equipment 3 pulley type ATD with counter weight 21

2

65758

131517.86

... More
Erection of regulating equipment 3 pulley type ATD with counter weight

2

3803

7606.98

... More
Manufacturing supply of Retro Reflective type structure Number plate as per RDSO drg. No.ETI / OHE / P / 7503 or latest along with all fixing arrangement.

40

594

23793.6

... More
Erection / Fixing of Retro Reflective type structure Number plate as per RDSO drg. No.ETI / OHE / P / 7503 or latest along with all fixing arrangement. 24

40

74

2994.8

... More
Supply of various types 25KV caution Board / Plates as per explanatory Notes 25

20

327

6551.8

... More
Erection of various types 25KV caution Boards / plates as per explanatory Notes

20

77

1557.8

... More
Supply (without insulator) of 25KV Single Pole(SP) Isolator without earth contact assembly 27

1

47022

47022.12

... More
Erection of 25KV Single Pole(SP) Isolator without earth contact assembly 28

1

4121

4121.52

... More
Supply of 25KV post / pedestal insulators for isolators 29

8

8092

64736.64

... More
Erection of 25KV post / pedestal insulators for isolators 30

8

343

2745.92

... More
Supply of copper bus bar 18mm 31

18

1270

22869.36

... More
Erection of copper bus bar 18mm 32

18

112

2022.12

... More
Supply & erection of post and operating rod insulator

1

18019

18019.8

... More
Supply of single earth electrode with earth pit complete as per RDSO Drg No. ETI / OHE / P / 7020 or latest

1

3706

3706.79

... More
Erection of single earth electrode with earth pit complete as per RDSO Drg No. ETI / OHE / P / 7020 or latest 35

1

1203

1203.68

... More
Supply of an Earth contact assembly in an isolator 36

1

7329

7329.85

... More
Erection of an Earth contact assembly in an isolator

1

1106

1106.2

... More
Supply of Section Insulator assembly including bar insulator assembly for conventional OHE 38

-

-

37

... More
Erection of Section Insulator assembly including bar insulator for conventional OHE 39

1

3076

3076.31

... More
Supply of Structure Bonds 40

30

794

23840.4

... More
Erection of Structure Bonds 41

30

190

5700

... More
Supply of Transverse (cross rail, inter-track, Z & special type) bonds 42

20

952

19049.2

... More
Erection of Transverse (cross rail, inter-track, Z & special type) bonds 43

20

128

2575.2

... More
Supply of Longitudinal bonds 44

40

608

24330

... More
Erection of Longitudinal bonds 45

40

122

4889.2

... More
Supply of earth bus 46

194

199

38732.1

... More
Erection of earth bus 47

193

70

13575.62

... More
Supply of material without insulators for termination of OHE conductor 48

4

6138

24552

... More
Erection of material for termination of OHE conductor 49

4

845

3381.48

... More
Supply of splicing and extension of anchored over head equipment with components 50

4

6163

24652

... More
Erection of splicing and extension of anchored over head equipment with components 51

4

5392

21568.68

... More
Dismantling of Bracket Assembly 52

12

1440

17281.8

... More
Cutting and removal of existing structure 53

8

1006

8054.72

... More
Dismantling of Guy Rod Assembly 54

4

691

2767.56

... More
Dismantling of fabricated steel other than mast 2055 0.50 Per Track

2

14294

28589.58

... More
Dismantling of OHE / Alluminium Feeder Wire 56

-

8305

8305.44

... More
Dismantling of copper jumper 57

4

625

2503.04

... More
Dismentling of an Isolator 58

1

1539

1539.33

... More
Dismantling of Three Puley type ATD & termination 59

2

3480

6960.4

... More
Dismantling of section insulator assembly 60

1

3330

3330.82

... More
Supply of aluminium bus bar connectors Bus terminal (6310) 61

6

1930

11584.56

... More
Erection of aluminium bus bar connectors Bus terminal (6310) 62

6

31

188.76

... More
Supply of different types of 160 Sqmm Copper Jumper wire as per explanatory Notes 63

4

1916

7667.64

... More
Erection of different types of 160 Sqmm Copper Jumper wire as per explanatory Notes

4

343

1373.84

... More
Handling, Leading, loading and Transportation charges for Railway supply material from different Railway sites and released material from different Railway sites, if any to concerned TRD Depot

2

2624

5248.36

... More
Erection of galvanized steel fabricated masts / other supporting structure -@ 100% Extra on erection rates for work done under Power Block

4

8847

35391.12

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components -@ 100% Extra on erection rates for work done under Power Block

6

8038

48228.9

... More
Erection of Single bracket assembly -@ 100% Extra on erection rates for work done under Power Block 68

25

1877

46938.25

... More
Erection of insulators for single bracket assembly

25

1231

30787.25

... More
Erection of copper jumper wire -@ 100% Extra on erection rates for work done under Power Block

6

681

4088.52

... More
Erection of Guy Rod Assembly -@ 100% Extra on erection rates for work done under Power Block

4

1067

4269.56

... More
Erection of 9-Tonne insulators -@ 100% Extra on erection rates for work done under Power Block

20

1220

24406.2

... More
Erection of Regulating equipment 3 pulley type ATD with counter weight -@ 100% Extra on erection rates for work done under Power Block

2

3803

7606.98

... More
Erection of 25KV Single Pole(SP) Isolator without earth contact assembly -@ 100% Extra on erection rates for work done under Power Block

1

4121

4121.52

... More
Erection of 25KV post / pedestal insulators for isolators -@ 100% Extra on erection rates for work done under Power Block

8

343

2745.92

... More
Erection of copper bus bar 18mm -@ 100% Extra on erection rates for work done under Power Block

18

112

2022.12

... More
Erection of an Earth contact assembly in an isolator -@ 100% Extra on erection rates for work done under Power Block

1

1106

1106.2

... More
Erection of Section Insulator assembly including bar insulator for conventional OHE -@ 100% Extra on erection rates for work done under Power Block

1

3076

3076.31

... More
Erection of material for termination of OHE conductor -@ 100% Extra on erection rates for work done under Power Block

4

845

3381.48

... More
Erection of splicing and extension of anchored over head equipment with components -@ 100% Extra on erection rates for work done under Power Block

4

5392

21568.68

... More
Dismantling of Bracket Assembly -@ 100% Extra on erection rates for work done under Power Block

12

1440

17281.8

... More
Cutting and removal of existing structure -@ 100% Extra on erection rates for work done under Power Block

8

1006

8054.72

... More
Dismantling of Guy Rod Assembly -@ 100% Extra on erection rates for work done under Power Block

-

-

83

... More
Dismantling of fabricated steel other than mast -@ 100% Extra on erection rates for work done under Power Block

2

14294

28589.58

... More
Dismantling of OHE / Alluminium Feeder Wire -@ 100% Extra on erection rates for work done under Power Block

-

-

85

... More
Dismantling of copper jumper -@ 100% Extra on erection rates for work done under Power Block

4

625

2503.04

... More
Dismentling of an Isolator -@ 100% Extra on erection rates for work done under Power Block

1

1539

1539.33

... More
Dismantling of Three Puley type ATD & termination -@ 100% Extra on erection rates for work done under Power Block

2

3480

6960.4

... More
Dismantling of section insulator assembly -@ 100% Extra on erection rates for work done under Power Block

1

3330

3330.82

... More
Erection of aluminium bus bar connectors Bus terminal (6310) -@ 100% Extra on erection rates for work done under Power Block

6

31

188.76

... More
Erection of different types of 160 Sqmm Copper Jumper wire as per explanatory Notes -@ 100% Extra on erection rates for work done under Power Block

4

343

1373.84

... More
Erection of galvanized steel fabricated masts / other supporting structure -@ 50% Extra for steel erection work done mannualy under Power Block

4

4423

17695.56

... More
Erection of fabricated and galvanized steel work (SPS) other than mast with necessary components -@ 50% Extra for steel erection work done mannualy under Power Block

6

4019

24114.48

... More
GST @ 18% applicable on all items under Schedule-1 & Schedule-2.

1

3212076

3212076.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.