Military Engineer Services Tender

... More
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Military Engineer Services - MES Tender

Works
Electronics Equipment
Electrical and Electronics
Eprocure
Opening Date19 Nov 2024
Closing Date22 May 2025
Tender Amount₹ 4,34,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(ii) Three phase RF meter - 133 Nos (iii) Single phase cellular meter - 41 Nos (iv) Three phase cellular meter - 173 Nos (c) The meter should be capable to run in both prepaid and post-paid mode & must support online and offline recharging system.

-

-

-

... More
Design, supply, installation, testing, commissioning , integrate and maintain the Advance Metering Infrastructure (AMI) for station Ferozepur Cantt under GE (East) FZR comprising of following :- (a) Supply, installation, testing & commissioning of Single Phase, 2 Wire, AC Static Direct connected, Smart Energy Meter , ISI Marked of different makes (not more than 33% of a particular make to ensure inter-changeability at a later date) as per BIS-16444 with communication technology including GPRS/RF/Hybrid (RF+GPRS)/ any other advanced technology as per CEA/TRAI/regulations in existing meter board/floor panel and in meter box where as required, current range 10-60 Amp, 240 V, accuracy class 1.0 UC1 category and above along with in-built load control switch, containing provision for TOD & RTC, capable to define multiple tariff slabs Note: The cost of meter box will be measured and paid separately in respective Item Srl No. 6.0 of BOQ). Meter should support the following data : (i) 15 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, daily and monthly billing survey for Cumulative Energy and Max Demand. (ii) Meter should have connect / disconnect functionality operable for MDM/billing software and prepaid features would be operable for MDM / Billing end as per IS 15959 part 2. (iii) Meter should support open communication protocol DLMS through RF/5G/ 4G/NB IOT with the software all as required at site and directed. In case of RF Communication, if repeaters are technically required in between meters and DCU, the cost there of irrespective of their numbers are deemed to be included in the quoted rate for meters. (iv) The meter should support open communication protocol DLMS with the software.

3194

-

-

... More
(xii) Meter Installation Module : The software would include an app based meter installation module where the meter installation or changes can be captured on the app itself and the readings may be demonstrated to the user if required on the app itself. (xiii) Activities Communication : The software support communication of the various activities such as occupation, vacation, meter change. personal detail change etc. with the user as well as the department on email. (xiv) Prepayment/Recharging Facility: The system should periodically monitor the energy consumption of prepaid consumers and decrease the available credit based on the consumption. The system should allow online / digital recharging through consumer App (Android and iOS based) and Web portal. The configuration and necessary arrangement for payment gateway and E-MRO facility shall be deemed to be included in the quoted rate. The system should send connect/disconnect command on the basis of available credit. Low credit alarm: The system will give an alarm over the consumer App and SMS to the registered mobile number in case the credit in the meter goes down below a predefined limit. Emergency credit: The meter will work even when the credit falls down to zero to prevent disconnection. This limit shall be configurable. The system should support happy hours in order to prevent disconnection in non-working hours and on holidays. The Happy hours should be configurable. (xv)The software should be demonstrated to work in both RF and GPRS-based systems for future compatibility. (xvi) Cyber security of software:- The software provided for the smart meters shall be secure from cyber threats and shall be provided regular security patches and updates including firewall and latest feature updates. Make: As per the OEM of the meter developed in India. The AMISP/contractor will be responsible for making the entire AMI system including the service provider immune to Cyber Attacks, while taking care of following guidelines : (a) All the hardware, OS and application software shall be hardened. (b) Application, scanning and hardware scanning tools shall be provided to identify vulnerability & security threats.

-

-

-

... More
Supply and Configuration, testing & commissioning of Cloud-Hosted multi-user web-based software including cloud hosting charge during 2- year defect liability period with following modules: (i) Head End System (HES) module : The HES to acquire data from different end points and monitor them automatically and remotely .The HES should be suitable to support the collection and storage of 15-minute interval data from end points. (ii) Meter Data Management Module :-The meter data management module would be responsible for collecting the data from the concentrator and make the data available to the billing system. The meter data management system would capture and provide the following data:- (a) Real time energy monitoring with 15 min instantaneous data from all the meters for seven parameters – Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency. (b) Monthly and quarterly billing survey data for Cumulative energy and max demand. (iii) Post-paid /Prepaid Billing Module :-The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data / billing data available to admin and end users. The billing module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It would allow post-paid and prepaid functionality as required. (iv) Occupation and Vacation Module:-The system would support occupation / vacation and billing reports, including license fee, furniture charges, water charges in addition to electric charges. The software would be collecting data from meter. The software would provide access to authorised MES rep as well as the occupant for the data. (v) Web site: There would be a dedicated website for the AGE and BSO team to view all the data and information. The designated users in MES would have the admin access to the application. The MES staff would also have the access of the key information on an android mobiles app (for admin use).

24

-

-

... More
Supply and fixing of Transparent polycarbonate Meter Box of suitable size with IP-54 for above mentioned 3-Phase, 4-wire Smart Energy Meter. The Polycarbonate Meter box shall comply with IS 14772:2000 and IS 11000:1984. It shall be totally shock proof, safe weather proof, rust proof , dust proof , water proof, halogen free, silica free and having internally embedded gasket technology, transparent hinged lid and sealing provision including bakelite connector, complete all as specified and directed by Engineer-in-Charge. Make:- Anchor/Panasonic/ L&T/ HPL/ Secure

153

-

-

... More
Material and labour for sub main wiring in replacement with two run of 6 Sqmm (nominal cross sectional area of single core unsheathed PVC insulated cables FRLS-H cable 1100 volts grade multi stranded copper conductor and one run 6 Sqmm multi stranded copper conductor PVC insulated cable (green colour) as earth wire connected to common earth dolly drawn through & including non-metallic rigid PVC conduit not less than 25 mm dia with necessary conduit accessories fixed concealed / surface only on roof & column) type including chase cutting in brick/ stone masonry for fixing conduit and making good the disturb surfaces of wall as per existing complete all as specified & directed

3194

-

-

... More
(i) Strong encryption capabilities for data in transit or at rest. (ii) Indentity and Access Management (IAM). This controls users access to cloud services create and manage users and groups , and grant or deny access. (iii) Managed Threat Detection : This service provides a more accurate and easy way to continuously monitor and protect cloud accounts and workloads. (iv) Managed DDoS Protection: This protection service that safeguards web applications running on cloud. (v) Web Application Firewall: It helps protects web applications from common web exploits that can affect application availability , compromise security or consume excessive resources. (vi) Key Management Service (KMS) : This service makes it easy to create and control the encryption keys used to encrypt data. (vii) Certificate Manager: This manange and deploys Secure Sockets Layer/ Transport Layer Security (SSL/TLS ) certificates. (viii) Cloud Hardware Security Module (HSM) : This meets regulatory compliance requirement for data security by using dedicated HSM appliances within the cloud. (b) CSPs also offers access to additional third- party security tools (e.g., IDS/intrusion Detection system (IDS), Intrusion prevention system (IPS), system information and event management (SIEM) to complement and enhance the consumers operation in the cloud. The third-party security tools complement existing cloud services to enable consumers to deploy acomprehensive security architecture. These security tools on cloud are equivalent and identical to the existing controls in an on-premises environment. (c) The contractor needs to review and validate the security configurations, review the notifications and patches released by CSP and validate the same is being taken into consideration during operations, confirm that the audit trails (e.g., who is accessing the services, changes to the configurations etc.) are captured for supporting any downstream audits of the projects by the finance or audit organization such as Standard Testing & Quality certificate (STQC), MEity Govt of India.

-

-

-

... More
Supply, installation, testing & commissioning of DCUs/Gateways and the arrangement of Sim cards and Internet (data pack) to enable reliable medium for two-way communication between Smart Meter & HES. The data acquisition (Push/Pull) frequency shall be configurable. It shall push events such as tamper, power off/on etc. to HES immediately on occurrence/receipt from meters. It shall have provision for the cellular, WiFi and Ethernet communication for the backhaul to HES. It shall be capable to handle data of minimum 200 Nos. of any type of smart meter (1ph/3ph). It shall be able to communicate with the nearest meters at a distance of at least 500 m, depending on topographical features. Communication of the nearest meters with other meters shall be established through appropriate mesh formation. RF Mesh shall support self-forming and self-healing features. The equipment shall be weather proof and dust proof (minimum rating: IP54 for indoor and IP65 for outdoor installation). It shall have rechargeable lithium ion battery with backup for 1(one) hour for normal meter reading, to push tamper event, carry out on demand reading, etc. Notes : (i) DCU would be compatible to at least three different makes of smart meter. Make : Anchor/Panasonic, L&T, HPL, Secure. (ii) The rate of sim as well as data pack for 24 months from date of completion of work for connectivity is deemed to be included in quoted rate.

18

-

-

... More
(d) The manufacturer or their service provider shall furnish 10 (Ten) years replacement guarantee for smart meters installed under this contract. The cost of the same are deemed to be included in the rates quoted for the item. (e) In case of Cellular communication such as 4G, NBIOT, 5G etc, the meter should be demonstrated working with more than one telecom service provider available in all the areas/stations covered under this contract. (f) All RF meters shall be based on "MESH Technology". (g) Meter should be integrable to third party software. Meter vender should provide all the necessary protocols and passwords including LLS key, HLS key, authentication passwords, encryption password. (h) Meter shall be supplied with repeater battery backup of RTC. (j) The rates quoted for this items are deemed to be inclusive of all other additional works including materials which is not mentioned here but need to be executed for proper and smooth functioning of smart meter system. (k) The smart meter should also have provn to receive connect/disconnect command locally at optical port with use of CMRI or any other equivalent arrangement.

-

-

-

... More
(vi) Customer Module:- The system would include a customer portal for the resident /occupant to log in and view their own energy / billing data. There would be android and iOS mobile apps for the user to monitor its own data and balance on regular basis. (vii) Energy Accounting Module: The system would include features of energy accounting. The system would be able to account for total energy block wise, facility wise and would also allow calculations of unaccounted energy in case total energy meter is also available. (viii) Communication Module: The system would provide communication of energy data and bills via print, email and sms methods. (ix) Meter Master Data :The system would support meter master data repository. The system would support meter replacement process. (x) Excel Export :The system would support export of metering and billing data in excel format. (xi) Customer Care Module : The software would include a customer care module where the user would be log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaints resolution.

-

-

-

... More
Supply of vending station desktop/ PC with configuration of i5, 8 GB RAM, 1 TB Hard disk, 19 " monitor, Windows 10/11, MS office, wireless keyboard and mouse, CD ROM Read/Write, USB ports etc. alongwith 1 KVA capacity UPS all as specified. Make: HP/ Dell/ Lenovo. Note: Installation and provision of broad band connection alongwith telecom charges 01 No. at the GE (East) FZR and 01 No. at GE (West) FZR with high speed internet for 10 years deemed to be included in quoted rate.

2

-

-

... More
(f) The software would support other charges such as water charges, license fee, furniture charges and other allied charges. (g) The software would allow supporting both prepaid and post-paid billing plans. Separate groups can be created for the same. (h) One bank account detail will be provided by MES. The cost of integration of payment gateway with software and bank account deemed be included in the quoted rates. No extra charges will be paid by MES on account of integration of payment gateway with bank account and software. (j) The software would be scalable and expandable for meters and system of different make complying with IS-16444. (k) The software should strictly adhere to IS:15959 standard & must be compatible with all makes of smart meters and the software should be capable of handling at-least 3500 number of meters of different makes as per BIS-16444 with 25% expansion without any additional infrastructure and cost implication to MES. (l) The software must be audited by CERT India empaneled firm/CERT auditor of Armed Forces and documentary proof of same must be produced at the time of commissioning.

-

-

-

... More
Supply, installation, testing & commissioning of Three Phase, 4 Wire, AC Static Direct connected, Smart Energy Meter , ISI Marked of different makes (not more than 33% of a particular make to ensure inter-changeability at a later date) as per BIS-16444 with communication technology including GPRS/RF/Hybrid (RF+GPRS)/ any other advanced technology as per CEA/TRAI/regulations in existing meter board/floor panel and in meter box where as required, current range 10-60 Amp, 415 V, accuracy class 1.0 UC1 category and above along with in-built load control switch, containing provision for TOD & RTC, capable to define multiple tariff slabs. Note: The cost of meter box will be measured and paid separately in respective Item Srl No. 7.00 of BOQ). Meter should support the following data : (i) 15 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, daily and monthly billing survey for Cumulative Energy and Max Demand. (ii) Meter should have connect / disconnect functionality operable for MDM/billing software and prepaid features would be operable for MDM / Billing end as per IS 15959 part 2. (iii) Meter should support open communication protocol DLMS through RF/ 5G/4G/NB IOT with the software all as required at site and directed. In case of RF Communication, if repeaters are technically required in between meters and DCU, the cost there of irrespective of their numbers are deemed to be included in the quoted rate for meters. (iv) The meter should support open communication protocol DLMS with the software. Notes for item No. 2 & 3 (a) The OEM will be performing site survey and deciding the communication technology to ensure data availability/ connectivity of all the consumers. (b) Tentative quantity of smart meters and communication instruments are as follows. However, actual quantity shall be worked out by contractor after field survey report and same shall be approved by GE before execution. (i) Single phase RF meter - 3153 Nos

306

-

-

... More
(b) BCS software should have the provisions to visualize /present all the data, which includes Instantaneous, Billing Load Survey and Events, In both tabular and graphical format. (c) BCS software should have Export options of data /reports in Excel and PDF. (xiii) Accessories : (a) Optical Probe – one (b) RS232 Communication cable –One (c) USB Cable -One (d) User Manual in CD-One (e) Carry Case- One.

-

-

-

... More
Taking down old Single / Three phase Energy Meter from any location and deposit to MES store complete all as specified and directed by Engineer-in-Charge/GE. The Quoted rate shall deemed to be inclusive of following parameters: - (a) Meter reading record shall be submitted before and after replacement duly signed by the contractor representative and MES representative. (b) Old meters should be handed over at AGE E/M store yard. (c) Any re-joining of wires / cables shall be done using suitable ferrule / cable connectors after removal of meter. (d) The cost of making disturbed surfaces good & matching to the existing surface is deemed to be included in the unit quoted rates and nothing shall be admissible on this account

3500

-

-

... More
(c) Date shall be encrypted at system/device/technology level. (d) While procuring cyber security items testing must be done and the system must be secure by design. (e) Residual information risk shall be calculated by contractor and same shall be submitted for perusal cyber audit teams. (f) Penetration & vulnerability assessment test from certified auditors during Field Acceptance Test (FAT). Site Acceptance test (SAT) & operations and maintenance period. (g) Audit of software for smart meter will be done by cert India empanelled firm cert auditor of armed forces. The cost of audit will be borne by the contractor. (h) Cert Audit of smart metering system at the time of commissioning shall be carried out. Subsequent audit of the system shall be carried out after every three years cost of such audits and rectifications thereof shall be borne by contractor. (xvii) Cloud Security : (a) The following basic security features should be ensured by any cloud service provider(CSP) :-

-

-

-

... More
Supply and fixing Transparent polycarbonate Meter Box of suitable size with IP-54 for above mentioned 1-Phase, 2- wire Smart Energy Meter. The Polycarbonate Meter box shall comply with IS 14772:2000 and IS 11000:1984. It shall be totally shock proof, safe weather proof, rust proof , dust proof , water proof, halogen free, silica free and having internally embedded gasket technology, transparent hinged lid and sealing provision including bakelite connector, complete all as specified and directed by Engineer-in-Charge. Make:- Anchor/Panasonic/ L&T/ HPL/ Secure

1597

-

-

... More
Material and labour for sub main wiring in replacement with four run of 6 Sqmm (nominal cross sectional area of single core unsheathed PVC insulated cables FRLS-H cable 1100 Volts grade multi stranded copper conductor and one run 6 Sqmm multi stranded copper conductor PVC insulated cable (green colour) as earth wire connected to common earth dolly drawn through & including non-metallic rigid PVC conduit not less than 25 mm dia with necessary conduit accessories fixed concealed / surface only on roof & column) type including chase cutting in brick/ stone masonry for fixing conduit and making good the disturb surfaces of wall as per existing complete all as specified & directed.

306

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.