If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 40,000Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Repair And Cleaning Of Sewage Line, Septic Tanks And Soakage Wells In Lal Tikku Khad Area Under Age B/r-ii Of Ge (south) Mamun
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_672088_1Bid Award Id
ViewTender No
GE(S)/M-53/2024-25Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Demolition of brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, drains etc, but excluding ashlar facings, dressed stonework and precast concrete articles, including removal of deberies from the site complete all as specified and directed.
40
-
-
Demolition of (un-reinforced) cement concrete of any description and in any position including removing debris from the site complete all as specified and directed.
26
-
-
Taking down existing cement plaster from brick walls or stone walls built in cement mortar etc. including raking out joints, hacking for key, scrubbing down with water etc, to receive plaster, including removing debris from the site complete all as specified and directed.
699
-
-
Cutting into existing manholes for connecting new drains, making good to pipe and rendering, cutting out existing benching and forming branch channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B-1 (using 20mm graded crushed stone aggregates), smooth finished and reforming benching as required of 150 mm bore pipe, including making good of manhole surface to match existing surface complete all as specified and directed.
5
-
-
All as per description of Srl item No. 07 here in before but for 200 mm bore pipe.
5
-
-
Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n.exc 10 sq m on plan and n.exc1.5 m in depth and getting out in any type of soil complete all as specified and directed.
120
-
-
M&L for 150mm bore reinforced cement concrete pipes, class NP-2, laid in trenches and jointed, with collars, complete all as specified and directed.
200
-
-
M&L for 200mm bore reinforced cement concrete pipes, class NP-2, laid in trenches and jointed, with collars, complete all as specified and directed.
100
-
-
M&L for PCC 1:4:8, type D-2 (using 40mm graded crushed stone aggregates) as in foundation, filling in and mass concrete, complete all as specified and directed.
6
-
-
M&L for concrete bed in cement concrete 1:4:8, type D-2 (using 40mm graded crushed stone aggregates) to 150 mm bore drain pipes including packing under and haunching against the sides of pipe after they are laid and tested complete all as specified and directed.
200
-
-
All as per description of Srl item No. 14 here in before but 200 mm bore pipe.
100
-
-
M&L for precast steel fiber reinforced concrete factory made manhole cover medium duty weight, sqare size 750mmx750mm thickness not less than 50mm, set in CM 1:6 as in cover slabs (for manhole, drains etc) with iron frame all round of plain fair faces, complete all as specified and directed.
379
-
-
M&L for brick work with subclass 'B; bricks, straight or curved on plan exc 6 Mtr mean radius, built in CM 1:4 complete all as specified and directed.
20
-
-
M&L for brick work with subclass 'B; bricks, straight or curved on plan exc 6 Mtr mean radius, in half brick wall built in CM 1:4 complete all as specified and directed.
300
-
-
M&L for PCC 1:2:4, type B-1 (using 20mm graded crushed stone aggregates) as in benching, copings etc. including necessary form work, complete all as specified and directed.
10
-
-
M&L for 15mm thick rendering in CM 1:6 on brick work or concrete surfaces, finished even and smooth without using extra cement including making necessary arrengments for scaffolding where required complete all as specified and directed.
1000
-
-
M&L for PCC 1:3:6, type C-1 (using 20mm graded crushed stone aggregates) as in surface channels and drains complete all as specified and directed.
10
-
-
Rectifying complaints of blockage of bathroom / kitchen / WHB / urinals / WCs of any pattern by cleaning the Nahani traps / gully traps / floor traps and making it fully functional. The blockage shall be cleared manually / mechanically as required at site. Note:- (a) The period of rectifying each complaint shall be maximum 48 hrs and in case of failure in rectification of complaint within the stipulated period, a penality of Rs 200 /- against each complaint shall be charged from the contractor's dues.
(b) The payment shall be done complaint wise.
(c) The contractor shall provide adequate labours and tools to rectify the complaints.
(d) The sludge obtained during rectifying the complaints shall be disposed off beyond the periphery of defence land and burried in borrow pits. The cost there of shall be deemed included in unit rate.
8000
-
-
Rectifying complaints of blockage of manholes of depth not exc 1.00 mtr by removing manhole cover, cleaning the blockage manually / mechanically as required at site, including removing of all sludge complete all as specified and directed.
Note:- (a) The period of rectifying each complaint shall be maximum 48 hrs and in case of failure in rectification of complaint within the stipulated period, a penality of Rs 200 /- against each complaint shall be charged from the contractor's dues.
(b) The payment shall be done by complaint wise.
(c) The contractor shall provide adequate labours and tools to rectify the complaints.
(d) The sludge obtained during rectifying the complaints shall be disposed off beyond the periphery of defence land and burried in borrow pits. The cost there of shall be deemed included in unit rate.
500
-
-
Rectifying complaints of blockage of manholes of depth exc 1.00 mtr but not exc 1.50 mtr by removing manhole cover, cleaning the blockage manually / mechanically as required at site, incl removing of all sludge complete all as specified and directed.
Note:- (a) The period of rectifying each complaint shall be maximum 48 hrs and in case of failure in rectification of complaint within the stipulated period, a penality of Rs 200 /- against each complaint shall be charged from the contractor's dues.
(b) The payment shall be done by complaint wise.
(c) The contractor shall provide adequate labours and tools to rectify the complaints.
(d) The sludge obtained during rectifying the complaints shall be disposed off beyond the periphery of defence land and burried in borrow pits. The cost there of shall be deemed included in unit rate.
200
-
-
Rectifying complaints of blockage of sewage lines of 100 mm bore dia SGSW / AC / Concrete / PVC pipes of any length at any depth by cleaning manually / mechanically and making fully functional complete all as specified and directed.
Note:- (a) The period of rectifying each complaint shall be maximum 48 hrs and in case of failure in rectification of complaint within the stipulated period, a penality of Rs 200 /- against each complaint shall be charged from the contractor's dues.
(b) The payment shall be done by complaint wise.
(c) The contractor shall provide adequate labours and tools to rectify the complaints.
(d) The sludge obtained during rectifying the complaints shall be disposed off beyond the periphery of defence land and burried in borrow pits. The cost there of shall be deemed included in unit rate.
150
-
-
Rectifying complaints of blockage of sewage lines of 150 mm bore dia SGSW / AC / Concrete / PVC pipes of any length at any depth by cleaning manually / mechanically and making fully functional complete all as specified and directed.
Note:- (a) The period of rectifying each complaint shall be maximum 48 hrs and in case of failure in rectification of complaint within the stipulated period, a penality of Rs 200 /- against each complaint shall be charged from the contractor's dues.
(b) The payment shall be done by complaint wise.
(c) The contractor shall provide adequate labours and tools to rectify the complaints.
(d) The sludge obtained during rectifying the complaints shall be disposed off beyond the periphery of defence land and burried in borrow pits. The cost there of shall be deemed included in unit rate.
2000
-
-
Rectifying complaints of blockage of sewage lines of 200 mm bore dia SGSW / AC / Concrete / PVC pipes of any length at any depth by cleaning manually / mechanically and making fully functional complete all as specified and directed.
Note:- (a) The period of rectifying each complaint shall be maximum 48 hrs and in case of failure in rectification of complaint within the stipulated period, a penality of Rs 200 /- against each complaint shall be charged from the contractor's dues.
(b) The payment shall be done by complaint wise.
(c) The contractor shall provide adequate labours and tools to rectify the complaints.
Note:- The sludge obtained during rectifying the complaints shall be disposed off beyond the periphery of defence land and burried in borrow pits. The cost there of shall be deemed included in unit rate.
350
-
-
De watering & de-sludging septic tank 25 users capacity by mechanical pumping after plugging inlet, removing manholes covers, rectangular/circular, CI or RCC, any type as per site, cleaning the septic tank, removing sewage sludge out of MoD premises, making septic tank fully functional to the entire satisfaction of Engr -In- Charge including carrying the effluent and re-instating the manhole cover to its original position complete all as specified and directed.
Note:- (d) The sludge obtained during rectifying the complaints shall be disposed off beyond the periphery of defence land and burried in borrow pits. The cost there of shall be deemed included in unit rate.
5
-
-
De watering & de watering & de-sludging septic tank 100 users capacity by mechanical pumping after plugging inlet, removing manholes covers, rectangular/circular, CI or RCC, any type as per site, cleaning the septic tank, removing sewage sludge out of MoD premises, making septic tank fully functional to the entire satisfaction of Engr -In- Charge including carrying the effluent and re-instating the manhole cover to its original position complete all as specified and directed.
Note:- The sludge obtained during rectifying the complaints shall be disposed off beyond the periphery of defence land and burried in borrow pits. The cost there of shall be deemed included in unit rate.
5
-
-
De watering & de-sludging septic tank 150 users capacity by mechanical pumping after plugging inlet, removing manholes covers, rectangular/circular, CI or RCC, any type as per site, cleaning the septic tank, removing sewage sludge out of MoD premises, making septic tank fully functional to the entire satisfaction of Engr -In- Charge including carrying the effluent and re-instating the manhole cover to its original position complete all as specified and directed.
Note:-The sludge shall be deposited beyond the periphery of defence land.
2
-
-
De-watering of soakage well or pit 1.20 mtr internal dia x 3.00 mtr deep by mechanical pumping after plugging inlet, removing manholes covers, rectangular/circular, CI or RCC, any type as per site, cleaning the septic tank, removing sewage sludgy water out of MoD premises, making soakage well/pit fully functional to the entire satisfaction of Engr -In- Charge including carrying the effluent and re-instating the manhole cover to its original position complete all as specified and directed.
Note:-The sludgy water shall be deposited beyond the periphery of defence land.
5
-
-
De-watering of soakage well or pit 1.20 mtr internal dia x 4.50 mtr deep by mechanical pumping after plugging inlet, removing manholes covers, rectangular/circular, CI or RCC, any type as per site, cleaning the septic tank, removing sewage sludgy water out of MoD premises, making soakage well/pit fully functional to the entire satisfaction of Engr -In- Charge including carrying the effluent and re-instating the manhole cover to its original position complete all as specified and directed.
Note:-The sludgy water shall be deposited beyond the periphery of defence land.
5
-
-
De watering of soakage well or pit 1.80 mtr internal dia x 3.00 mtr deep by mechanical pumping after plugging inlet, removing manholes covers, rectangular/circular, CI or RCC, any type as per site, cleaning the septic tank, removing sewage sludgy water out of MoD premises, making soakage well/pit fully functional to the entire satisfaction of Engr -In- Charge including carrying the effluent and re-instating the manhole cover to its original position complete all as specified and directed.
Note:-The sludgy water shall be deposited beyond the periphery of defence land.
2
-
-
Removing of excavated materials to a distance exc.250m but not exc.500m and deposited where directed at a level n.exc 1.5m above the starting point complete all as specified and directed.
15
-
-
Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and directed.
105
-
-