Military Engineer Services Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Military Engineer Services - MES Tender

Works
Electrical and Electronics
Eprocure
Opening Date8 Nov 2024
Closing Date7 Dec 2024
Tender Amount₹ 5,80,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
EXPANSION TANK FOR CHILLED WATER/ HOT WATER CIRCUIT S & F of ASME pre-charged vertical closed bladder expansion tank, stamped for 125 psi (862 kPa) working pressure having carbon steel shell, conforming to IS 2825: 1969, coated (inside & outside) with anti-corrosion paint with a heavy-duty but replaceable bladder, ring base, lifting rings and 20 mm NPT piping connection protected by strainer at the water inlet, air charging valve connection to facilitate adjusting pre-charge pressure to meet actual system conditions complete with pressurization unit (pumps, etc.) accessories as specified and directed by the Engineer-in-Charge for the following:-

-

-

-

... More
100 Litre (Chilled Water circulation)

1

-

-

... More
50 Litre (Hot Water circulation)

1

-

-

... More
Supply, installation, testing and commissioning of fully BMS and SCADA compatible IP 55 rated electric Hot Water Generator (HWG) in vertical configuration, suitable for 150 KW heat output or 11484 kg/hr water flowrate, 2.5 to 4.0 kg/cm2 operating pressure range and 30 °C to 95 °C operating temperature range, having automatic stage sequence reversal, slave SCR power controller to modulate the entire load from 0-100%, embedded LCD, RS-232C / RS-485 port & ethernet port for communication, in-built self-diagnostic tool, etc. complete all as specified and directed by the Engineer-in-Charge. [Site #02]

1

-

-

... More
The HWG shall conform to the following requirements / specifications: [A] HEATING ELEMENTS (i) Pressure-rated flanged type immersion heaters, conforming to IS 4159: 2002, consisting of multiple tubular heating elements formed into hairpins which are silver-brazed to a mating flange [B] PRESSURE VESSEL (i) Water Vessel, conforming to IS 2825: 1969 rated for 160 PSIG maximum working pressure at 120 °C and tested at 300 PSIG having top openable thick MS plate designed for maximum element to water contact for efficient operation, welded to shell flange (ii) Connections for water inlet & outlet with mating flanges (iii) Descaling point & drain connection for system drainage [C] INSULATION (i) 50 mm thick resin bounded fibre glass wool of density 32 kg/cum and cladded with aluminum sheet to minimum heat loss [D] CONTROL CABINET (i) Integral control panel made out of 2.0 mm thick powder coated CRCA sheet having louvers to insure adequate ventilation of the control and heater terminal compartment (ii) Base frame fabricated out of ISMC100 channel (iii) Hinged doors with lockable padlocks for access to all control compartments

-

-

-

... More
[E] CONTROL & SAFETY (i) Incomer MCCB with electrolytic grade copper busbar and mechanical interlock for safe operation (ii) Magnetic Contactors with MCB / HBC fuses for heater switching (iii) Pilot lights indicating the functional operation, i.e. Phase Indication, Each Stage ON, Supply ON, etc. (iv) Alarm package to de-energiz the boiler and give audible and visual indications of high temperature, low water level or zero flow rates (each condition should be indicated with a separate pilot light) (v) Pressure Relief Valve & Air Purge Valve (vi) Temperature & Pressure gauges at both inlet and outlet [F] STEP CONTROLLER (i) Temperature Control using microprocessor based multi-stage electronic progressive staging sequencer with thermistor sensor to control the HWG in stages (ii) Logic and Control circuits to continuously monitor the input signal to determine if more or less heat is required [G] BMS (i) Dry contacts for start / stop command, on / off status indication, fault indications, viz., high temperature and low water level, etc. (ii) Provision for remote operation and local remote selector switch status (iii) RS-485 communication port for remote programming and control (iv) Remote interlock to user enabled energizing or de-energizing of the HWG from remote or any field / pump interlock

-

-

-

... More
HOT WATER PUMP (1W + 1S) Supply, installation, testing and commissioning of monoblock, self-priming, single-stage centrifugal pump suitable for 3.21 litre/s discharge @ 23 mWC head having cast iron casing, enclosed type dynamically balanced cast iron impeller, carbon steel pump shaft, gland packed sealing, deep groove ball bearings, etc. with energy efficient (IE4) TEFC squirrel cage induction motor, conforming to IS 12615: 2018, and suitable for operation on 3-Ph, 415 V±10%, 50 Hz AC supply, base plate, mounting channel frame, accessories and fittings, viz. pressure gauges, thermometers, drains, coupling, coupling guard, vibration isolation arrangement by means of spring / rubber type mounting duly insulated with FM approved highly- flexible, closed-cell thermal insulation of elastomeric foam based on synthetic rubber (NBR) of appropriate thickness laminated with 12 micron aluminium foil facing with reinforced glass scrim along with adhesives and other necessary accessories complete all as specified and directed by Engineer-in-Charge. NOTES: [i] The rate include for necessary civil work viz. foundation for placement of pump and pump accessories shall be covered in the scope of work. [ii] Pressure gauges, thermometers and drains shall be measured and paid for saperately.

2

-

-

... More
(B) HVAC PANEL Supply, installation, testing and commissioning of factory made, CPRI / ERDA type tested, fully compartmentalized bolted type HVAC Panel (design verified assembly- DVA) of suitable size conforming to IEC 61439-1 & 2 and IEC 61641 and having modular extensible design suitable for indoor mounting, internal arc compliance of minimum 70 kA for 0.5 s, made out of 2.0 mm thick mild steel CRCA sheet, having both sides openable with hinged doors and locking arrangement, IP 43 & IK 10 protection, supported and fixed on structural frame of angle iron of suitable size, including earthing stud, labelling, painting to all internal & external exposed steel surfaces with powder coating paint (7 tank process), duly fixed in ground with PCC foundation (1:2:4) type B1, with danger notice plate of 1.6 mm thick mild steel vitreous enamelled (white) with letters, figures and conventional skull and bones in signal red colour suitable for 3-Phase, 4-Wire system, 500 V grade with necessary wiring, PVC sheathed stranded copper conductor of appropriate length and size, including fixing lugs, bolts, screws, etc. complete all as specified and directed by the Engineer-in-Charge.

1

-

-

... More
The HVAC Panel shall comprise of the following: [A] BUSBAR CHAMBER [i] 01 Set (3L + N) of Aluminum busbar of rated capacity 630 A, covered with PVC insulated sleeves including insulator, nuts, bolts, etc. with complete connection [B] INCOMING [i] Circuit Breaker (a) 630 A, 415 V, Ics = 100% Icu = Icw (1 sec for total selectivity) = 50 kA, 50 Hz electrical draw-out type 4P ACB (with LSIG protection), conforming to IS/IEC 60947-2 & 3, having 100% neutral with inbuilt release protection, no derating up to 50 ⁰C, microprocessor based trip & LED based display systems with thermal memory providing overload, short-circuit, instantaneous & earth-fault protection, zone selective interlocking, pre-trip alarm & individual fault indicating LEDs, 20 trip record, % loading, bar graph, max. & min. meter and pre-alarm function for overload, short-circuit & earth fault - 01 Nos. [ii] Instrumentation & Measurement (a) Cl 1.0 multi-function meter capable of measuring V, A, F, PF, W/VA, Wh/VAh, Runhrs. Onhrs & interupts- 01 Nos. (b) 800/5A Cl. 1.0 C.T. with 15 VA burden- 01 Nos. (c) 800/5A Cl. 5P10 C.T. with 15 VA burden- 01 Nos. (d) 415/√3 V / 110/√3 V P.T. Cl.3P, 50 VA burden- 01 Nos. (e) 6A, 10kA, 415V, 50 Hz 4P MCB- 02 Nos. [iv] Indication & Annunciation (a) LED phase indicators (Red, Yellow, Blue)- 01 Set (b) LED status indicators (ON, OFF, TRIP)- 01 Set (c) LED status indicators (SC, CSH, RTC)- 01 Set

-

-

-

... More
[C] OUTGOING [i] Circuit Breaker (a) 320 A, 415 V, Ics = 100% Icu = 36 kA, 50 Hz 4P MCCB, conforming to IEC 60947-2: 2016, having microprocessor based trip unit, adjustable overload setting, adjustable short-circuit setting, adjustable neutral protection, electrical interlocking, front indication LEDs, etc.- 02 Nos. [for HWG & SPARE] (b) 200 A, 415 V, Ics = 100% Icu = 25 kA, 50 Hz 3P MCCB, conforming to IEC 60947-2: 2016, having thermal magnetic trip unit, adjustable overload setting, adjustable short-circuit setting, front indication LEDs, etc.- 05 Nos. [for chiller] (c) 100 A, 415 V, Ics = 100% Icu = 25 kA, 50 Hz 3P MCCB, conforming to IEC 60947-2: 2016, having thermal magnetic trip unit, adjustable overload setting, adjustable short-circuit setting, front indication LEDs, etc.- 03 Nos. [for AHU Panel & SPARE] (d) 32 A, 415 V, Ics = 100% Icu = 25 kA, 50 Hz 3P MCCB, conforming to IEC 60947-2: 2016, having thermal magnetic trip unit, adjustable overload setting, adjustable short-circuit setting, front indication LEDs, etc.- 06 Nos. [for CWP HWP & SPARE] [ii] Motor Starter / Drive (a) Variable Frequency Drive (VFD) of 5.5 kW rating with IP 55 enclosures and mains disconnect switch and comprising of the following complete with accessories- 03 Nos. [for CHWP & SPARE] (b) Variable Frequency Drive (VFD) of 2.2 kW rating with IP 55 enclosures and mains disconnect switch and comprising of the following complete with accessories - 03 Nos. [for HWP & SPARE] The VFD shall conform to the following specification. (1) built-in dual 5% impedance DC link reactor (harmonic filters) on the positive and negative rails of the DC bus of the variable frequency drive (VFD). (2) built-in EMC filters (electro magnetic compatibility filters) for restriction of conducted emissions to comply with IEC61800: 3 (unrestricted distribution): 2004 category C 1 (50 meter) (3) three feedback PID controller having capability to simultaneously accept 3 feedback signals from temperature sensors or pressure sensors for process optimization and accordingly control the speed of pumps. (4) integral graphical keypad. [ii] Indication & Annunciation (a) LED status indicators (ON, OFF, TRIP)- 16 Set

-

-

-

... More
NOTES: [i] ACBs shall have separately powered, individual fault trip indication LEDs (For overload, short circuit, earth fault and trip-unit failure) shall be available on the trip unit which shall function even in the absence of external power supply to the breaker.ACB shall be suitable for ZSI. Trip units shall have thermal memeory as standard. [ii] All the MCCBs up to 320 A shall be with thermal magnetic trip unit & above 320A shall be with microprocessor trip units. To ensure failsafe emergency tripping of the breakers (ACBs & MCCBs), it shall be supplied with continuous rated shunt trip coils. [iii] Necessary control and switching devices to execute the switching and control logic shall be deemed inclusive of the scope of supply irrespective of them being specified / not specified above or in the SLD. [iv] The Panel / Switchboard shall be tested to withstand vibration caused by an earthquake in accordance with IEC 60068-3-3:2013 or IS 1893 Zone V. [v] The Panel shall be purchased from the original equipment manufacturer (OEM) or OEM authorized franchises only. [vi] All the necessary noble components (viz., structural, Door noble like hinge, Bush, Door alignment guage and Bus bar noble - Bus bar support, Close profile structure - horizontal & vertical) of the Panel shall be supplied by the OEM. [vii] The Contractor shall furnish dimensional drawings of the items offered indicating all the fittings, dimensional tolerances, typical GADs, etc. to the engineer-in-charge [ix] The Contractor shall intimate the Engineer-in-Charge of the routine tests in the OEM factory in presence of a representative nominated by CWE before dispatch.

-

-

-

... More
M & L for 1.1 KV grade aluminum conductor, XLPE insulated armoured cables, of the following size conforming to IS: 7098 (Part 1)- 1988 outer sheath conforming to IS: 5831- 1984, including necessary clamping / dressing with cable ties and termination complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
25 Sqmm, 3.5 Core

80

-

-

... More
120 Sqmm, 3.5 core

60

-

-

... More
M & L for 1.1 KV grade copper conductor, XLPE insulated unarmoured cable conforming to IS 7098 (Part 1): 1988, PVC inner sheath and PVC Type ST-2 outer sheath conforming to IS 5831: 1984, including necessary clamping / dressing with cable ties and termination complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
4.0 Sqmm, 3 core

60

-

-

... More
6.0 Sqmm, 3 core

60

-

-

... More
70 Sqmm, 4 core

150

-

-

... More
S & F of perforated hot dipped galvanized iron cable tray having galvanization thickness not less than 50 microns and perforation not more than 17.5% including fittigs viz. joints, bends, tees, etc. for the following sections of length complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
300 mm X 50 mm X 1.2 mm

35

-

-

... More
150 mm X 50 mm X 1.2 mm

35

-

-

... More
100 mm X 50 mm X 1.2 mm

50

-

-

... More
M & L for earthing complete with copper earth plate electrode of 60 cm X 60 cm X 3.15 mm size, buried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5 m below normal ground level, connected to copper strip of size 20 mm x 3 mm as earth lead, by means of bolts, buts, check nuts and washers of galvanised iron or steel, galvanized iron pipe of 40 mm diameter, connected to earthing test point, all as shown in electrical plate No. 5 connected to earthing test point all as specified or indicated including testing on completion and including excavation, earthwork, PCC earth pit of dimensions 550 mm X 550 mm (outer) and 300 mm X 300 mm (inner) and 250 mm deep, with a 10 mm thick CI cover, hinged to CI frame on ground level, GI watering pipe, funnel, etc. complete as specified and directed by the Engineer-in-Charge.

1

-

-

... More
M & L for earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required 20 mm X 3 mm copper strip complete as specified and directed by the Engineer-in-Charge.

15

-

-

... More
M & L for earthing complete with galvanized steel earth plate electrode of 60 cm x 60 cm x 6 mm size, buried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5 m below normal ground level, connected to GI wire of 4.0 mm diameter as earth lead, by means of bolts, buts, check nuts and washers of galvanised iron or steel, galvanized iron pipe of 40 mm diameter, connected to earthing test point, all as shown in electrical plate No. 5 connected to earthing test point all as specified or indicated including testing on completion and including excavation, earthwork, PCC earth pit of dimensions 550 mm X 550 mm (outer) and 300 mm X 300 mm (inner) and 250 mm deep, with a 10 mm thick CI cover, hinged to CI frame on ground level, GI watering pipe, funnel, etc. complete as specified and directed by the Engineer-in-Charge.

3

-

-

... More
M & L for earth continuity conductor or main earthing lead fixed to wall on batten / recess / chases / buried in ground / drawn in conduit/pipe / fixed to poles / any other indicated situation for loop earthing etc. as required GI wire of 4.0 mm diameter complete as specified and directed by the Engineer-in-Charge.

20

-

-

... More
M & L for earth continuity conductor or main earthing lead fixed to wall on batten / recess / chases / buried in ground / drawn in conduit/pipe / fixed to poles / any other indicated situation for loop earthing etc. as required GI strip of size 32 mm x 6 mm complete as specified and directed by the Engineer-in-Charge.

15

-

-

... More
M & L for chilled water MS ERW, Class-C pipe including necessary fittings viz. flexible connections, bends, tees, reducers, flanges, air purge valves, drain valves, structural support, necessary clamps, vibration isolators, etc. including painting and supporting / fixing the pipe in excavated trenches or on floor / wall / ceiling with clamps, hangers, angles, channels (using anchor fasteners) with necessary accessorie, duly insulated complete for following all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
100 mm

205

-

-

... More
80 mm

20

-

-

... More
65 mm

40

-

-

... More
Supply, installation, testing and commissioning of MS bolted cover Y-type strainer with CCS body of following nominal bore size conforming to ASTM A- 216 Gr. WCB, AISI 304 screen with 1.2 mm diameter perforation, 40 kg/cm2 body test pressure & 20 kg/cm2 maximum working pressure and standard flange end conforming to BS 10 Table F / Class-150, duly insulated complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
100 mm

2

-

-

... More
80 mm

1

-

-

... More
65 mm NOTES: Insulation shall be measured and paid for separately.

1

-

-

... More
Supply, installation, testing and commissioning of wafer type PN 1.6 rated short pattern CI butterfly valve having Gr. FG-200 CI body conforming to IS 210: 2009, seat having EPDM rubber lining, CF 8 stainless steel disc, AISI- 410 stainless steel stem, 2.4 MPa body test pressure & 1.6 MPa seat test pressure and standard flange end conforming to BS 10 Table D/E & ANSI B 16.1 CI- 125, duly insulated complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
100 mm

4

-

-

... More
80 mm

2

-

-

... More
65 mm NOTES: Insulation shall be measured and paid for separately.

6

-

-

... More
Supply, installation, testing and commissioning of 100 mm NB wafer type PN 1.6 rated swing check type multidoor reflux valve (NRV), designed & tested as per IS 5312 (Part- 2): 1986, suitable to handle clear water having turbidity up to 5000 PPM, having CI body, door and diaphragm, leaded tin bronze seat rings and flange drilling standard end connection, etc., duly insulated complete all as specified and directed by the Engineer-in-Charge. NOTES: [i] Insulation shall be measured and paid for separately.

2

-

-

... More
M & L for PN 1.6 rated precise balancing double regulation type cast iron (CI) balancing valve of having CI Gr. FG200 body, EPDM / nitrile seal, stainless steel disc, ASTM A 276, Gr SS410 stem, EPDM / nitrile bush, MS gland nut, ASTM A 276 spindle, CI bonnet, SS304 baancing nut, MS bonnet cap, CI hand wheel, MS plug, stainless steel fastener, flanged end connection, etc., and duly insulated with elastomeric thermal insulation with necessary accessories complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
80 mm

1

-

-

... More
65 mm NOTES: Insulation shall be measured and paid for separately.

5

-

-

... More
Supply, installation, testing and commissioning of PN 16 rated 2-way pressure independent control valve (PICV) of following size with sensor operated flow rate or power control and energy monitoring function, flange end connections, etc. for modulating water-side control of air handling units along with valve actuator complete all as specified and directed by the Engineer-in-Charge. The valve shall conform to the following technical specification: [i] Material (a) Valve body: EN-GJL-250 (b) Flow measuring pipe: EN-GJL-250 with protective paint (c) Closing element: Stainless steel AISI 316 (d) Spindle: Stainless steel AISI 304 (e) Spindle seal: EPDM (f) Seat: PTFE, O-ring Viton (g) Imersion sleeve: Stainless steel AISI 316 [ii] Electrical Data (a) Nominal Voltage: AC / DC 24 V (b) Nominal Voltage frequency: 50 Hz (c) Power consumption in operation: ≤ 7 W (d) Power consumption in rest position: ≤ 5 W [iii] Flow Measurement (a) Measuring principle: Ultrasonic volumetric flow measurement (b) Measuring accuracy flow: ±2%

-

-

-

... More
80 mm

1

-

-

... More
65 mm NOTES : (i) The 2-way control valve shall be pre-calibrated to the given maximum flow rate. (ii) Closing off differential pressure of actuator connected with 3-way diverting globe valve shall not be less than the pump head.

1

-

-

... More
Supply, installation, testing and commissioning of 65 mm NB PN 1.6 rated short pattern CI Motorised butterfly valve having Gr. FG-200 CI body conforming to IS 210: 2009, seat having EPDM rubber lining, CF 8 stainless steel disc, AISI- 410 stainless steel stem, 2.4 MPa body test pressure & 1.6 MPa seat test pressure and standard flange end conforming to BS 10 Table D/E & ANSI B 16.1 CI- 125, duly insulated complete all as specified and directed by the Engineer-in-Charge. NOTE: [i] Insulation shall be measured and paid for separately.

4

-

-

... More
S & F of 32 mm thick off-white flexible closed-cell elastomeric thermal insulation for following pipes (in tubular form) made of elastomeric foam based on synthetic rubber (NBR / PVC), tested for maximum service temperature 100 ºC as per ASTM C534 & minimum service temperature -50 ºC as per ASTM C534, thermal conductivity λ ≤ 0.037 W/mK at mean temperature θm = 24 ºC as per ASTM C518 / C177, ASTM C335, water absorption by volume ≤ 0.2% as per ASTM C 209 / C1763, flame spread index (FSI) & smoke development index (SDI) 25/50 as per ASTM E84, flammability HB, V-0 as per UL 94, fungi resistance as per ASTM G21/C1338, mould growth resistance as per ASTM E2180-18 / UL 181 and ozone resistance as per ASTM D 1149-18 along with self pre-covered self-adhering, UV treated glass cloth of thickness 7 mm / 200 GSM adhesives and other necessary accessories complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
100 mm

45

-

-

... More
65 mm

20

-

-

... More
UNDER GROUND INSULATION S & F of fire-retardant quality expanded polystyrene moulded pipe section (EPS) insulation for following pipes of density 20 kg/m3, with a thick coat of cold setting adhesive (CPRX compound) wrapping with 500g polythene faced hessian and finally sand cement plaster and tar felt cladding complete with type, grade-1 roofing felt strip, conforming to IS 1322: 1993, at joints repairing of damage to building etc. for the following diameters as required complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
100 mm

160

-

-

... More
80 mm

20

-

-

... More
65 mm

20

-

-

... More
GI DRAIN PIPE M & L for drain water pipe of 15 mm NB including necessary fittings viz. flexible connections, bends, tees, reducers, flanges, air purge valves, drain valves, structural support, necessary clamps, vibration isolators, etc. including painting and supporting / fixing the pipe in excavated trenches or on floor / wall / ceiling with clamps, hangers, angles, channels (using anchor fasteners) with necessary accessories complete all as specified and directed by the Engineer-in-Charge. NOTES: [i] The pipe size 150 mm NB & below shall be MS 'C' class as per IS 1239 (Part- 1): 2004 & IS 1239 (Part- 2): 2011. [ii] The pipe size above 150 mm NB shall be welded black steel pipe heavy class as per IS 3589: 2001. [iii] Minimum thickness of MS sheet for pipe size above 150 mm NB and up to 350 mm NB shall be 6.35 mm and it shall be 7 mm for pipe size 400 mm NB and above.

19

-

-

... More
M & L for CL#125 two-piece design cast iron (CI) straight pattern ball valve of 15 mm NB, conforming to IS 9890: 1981 and having FG 200 cast iron body conforming to IS 210: 2009, AISI 410 stem, stainless steel AISI 304 ball, renewable PTFE seat & gland packing and screwed female BSP parallel threaded ends conforming to BS 21 with necessary accessories all complete as specified and directed by the Engineer-in-Charge.

15

-

-

... More
M & L for hot water piping including necessary fittings viz. flexible connections, bends, tees, reducers, flanges, air purge valves, drain valves, structural support, necessary clamps, vibration isolators, etc. including painting and supporting / fixing the pipe in excavated trenches or on floor / wall / ceiling with clamps, hangers, angles, channels (using anchor fasteners) with necessary accessories, duly insulated for the following pipes complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
50 mm

185

-

-

... More
40 mm [i] The pipe size 150 mm NB & below shall be MS 'C' class as per IS 1239 (Part- 1): 2004 & IS 1239 (Part- 2): 2011. [ii] The pipe size above 150 mm NB shall be welded black steel pipe heavy class as per IS 3589: 2001. [iii] Minimum thickness of MS sheet for pipe size above 150 mm NB and up to 350 mm NB shall be 6.35 mm and it shall be 7 mm for pipe size 400 mm NB and above. [iv] Insulation shall be measured and paid for separately.

40

-

-

... More
S & F of off-white flexible closed-cell 32 mm thick elastomeric thermal insulation (in tubular form) made of elastomeric foam based on synthetic rubber (NBR / PVC), tested for maximum service temperature 100 ºC as per ASTM C534 & minimum service temperature -50 ºC as per ASTM C534, thermal conductivity λ ≤ 0.037 W/mK at mean temperature θm = 24 ºC as per ASTM C518 / C177, ASTM C335, water absorption by volume ≤ 0.2% as per ASTM C 209 / C1763, flame spread index (FSI) & smoke development index (SDI) 25/50 as per ASTM E84, flammability HB, V-0 as per UL 94, fungi resistance as per ASTM G21/C1338, mould growth resistance as per ASTM E2180-18 / UL 181 and ozone resistance as per ASTM D 1149-18 along with self pre-covered self-adhering, UV treated glass cloth of thickness 7 mm / 200 GSM adhesives and other necessary accessories for 50mm bore pipe complete all as specified and directed by the Engineer-in-Charge.

35

-

-

... More
S & F of fire-retardant quality expanded polystyrene moulded pipe section (EPS) insulation of density 20 kg/m3, with a thick coat of cold setting adhesive (CPRX compound) wrapping with 500g polythene faced hessian and finally sand cement plaster and tar felt cladding complete with type, grade-1 roofing felt strip, conforming to IS 1322: 1993, at joints repairing of damage to building etc. for the following diameters as required complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
50 mm

150

-

-

... More
40 mm

40

-

-

... More
Supply, installation, testing and commissioning of cast iron bolted cover Y-type strainer with CI body conforming to IS:210 Gr.FG200, SS AISI 304 screen having 1.2 mm perforation, 24 kg/cm2 body test pressure & 16 kg/cm2 maximum working pressure and standard flange end conforming to BS 10 Table F / Class-150 duly insulated with elastomeric thermal insulation with necessary accessories for the following sizes complete all as specified and directed by Engineer-in-Charge.

-

-

-

... More
50 mm

2

-

-

... More
40 mm

2

-

-

... More
NON-RETURN VALVE Supply, installation, testing and commissioning of wafer type PN 1.6 rated swing check type multidoor 50 mm NB reflux valve (NRV), designed & tested as per IS 5312 (Part- 2): 1986, suitable to handle clear water having turbidity up to 5000 PPM, having CI body, door and diaphragm, leaded tin bronze seat rings and flange drilling standard end connection, etc., duly insulated complete all as specified and directed by the Engineer-in-Charge. NOTE: Insulation shall be measured and paid for separately.

2

-

-

... More
Supply, installation, testing and commissioning of PN 16 of 40 mm dia rated 2-way pressure independent control valve (PICV) with sensor operated flow rate or power control and energy monitoring function, flange end connections, etc. for modulating water-side control of air handling units along with valve actuator complete all as specified and directed by the Engineer-in-Charge. The valve shall conform to the following technical specification: [i] Material (a) Valve body: EN-GJL-250 (b) Flow measuring pipe: EN-GJL-250 with protective paint (c) Closing element: Stainless steel AISI 316 (d) Spindle: Stainless steel AISI 304 (e) Spindle seal: EPDM (f) Seat: PTFE, O-ring Viton (g) Imersion sleeve: Stainless steel AISI 316 [ii] Electrical Data (a) Nominal Voltage: AC / DC 24 V (b) Nominal Voltage frequency: 50 Hz (c) Power consumption in operation: ≤ 7 W (d) Power consumption in rest position: ≤ 5 W [iii] Flow Measurement (a) Measuring principle: Ultrasonic volumetric flow measurement (b) Measuring accuracy flow: ±2% NOTE: The 2-way Control valve shall be pre-calibrated to the given maximum flow rate.

2

-

-

... More
Supply, installation, testing and commissioning of wafer type PN 1.6 rated short pattern CI butterfly valve of folowing sizes having Gr. FG-200 CI body conforming to IS 210: 2009, seat having EPDM rubber lining, CF 8 stainless steel disc, AISI- 410 stainless steel stem, 2.4 MPa body test pressure & 1.6 MPa seat test pressure and standard flange end conforming to BS 10 Table D/E & ANSI B 16.1 CI- 125, duly insulated complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
50 mm

6

-

-

... More
40 mm

4

-

-

... More
M & L for PN 1.6 rated 40 mm NB precise balancing double regulation type cast iron (CI) balancing valve of having CI Gr. FG200 body, EPDM / nitrile seal, stainless steel disc, ASTM A 276, Gr SS410 stem, EPDM / nitrile bush, MS gland nut, ASTM A 276 spindle, CI bonnet, SS304 baancing nut, MS bonnet cap, CI hand wheel, MS plug, stainless steel fastener, flanged end connection, etc., and duly insulated with elastomeric thermal insulation with necessary accessories complete all as specified and directed by the Engineer-in-Charge. NOTE: Insulation shall be measured and paid for separately.

2

-

-

... More
M & L for PN 1.6 rated air vent valve having brass body, cover, adopter, disc assembly & cap, stainless steel strainer, plastic float and 20 mm screwed threaded ends suitable for maximum operating temperature 100 °C installed on all high points in the water piping system to automatically remove the trapped air with necessary accessories all complete as specified and directed by the Engineer-in-Charge.

4

-

-

... More
S & F of 150mm dual scale (°F / °C), lower mount (radial), bimetal thermometer having 0.5 NPT process connection, Grade A accuracy class as per ASME B40.200, stem diameter 6.35 mm, laminated safety glass window, stainless steel 304 case, steam, process connection & joint, aluminium dial & pointer, IP67 protection, scale range 0- 60 °C with necessary accessories all complete as specified and directed by the Engineer-in-Charge.

18

-

-

... More
S & F of 100mm bourdon tube pressure gauge conforming to EN 837-1, having copper alloy process connection & pressure element, plastic black pointer & case, plastic crystal-clear window, snap-fitted in case, accuracy class 2.5, scale range 0- 25 bar with necessary accessories all complete as specified and directed by the Engineer-in-Charge.

28

-

-

... More
Supply, installation, testing and commissioning of double-skin type horizontal, floor-mounted, top / side discharge air handling unit having thermal break profile complete with air-tight casing using gaskets and self-adhesive tapes 0.8 mm thick pre-coated outer skin and 0.6 mm thick GI inner skin, 45±2 mm thick double skin panel with pressure injected CFC/HCFC free PUF having 'k' value of 0.02 W/°C/m & density 40 kg/m³, AMCA certified energy efficient plug fan(s) with backward curved impellers for high static pressure mounted on aluminium extruded siderail base frame with VFD, EU4 pre-filter and EU7 fine filter (mounted on a common frame), combination of 6/8 rows deep chilled water coil(s), 2/4 rows deep hot water coil(s) and reheat coil with anti-corrosion aluminium fins, suitable high efficiency (IE3) TEFC squirrel cage flame proof induction motor, PVC/nylon hinges & handles, view port and marine lamp, limit switch, SS-304 drain pan, vibration isolators/rubber pads (minimum 25mm thick) inspection windows / doors, mixing box and supply / return / fresh air openings fitted with aluminium volume control dampers, thermostat & humidistate,etc. complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
The AHU shall comprise of the following: [a] Suitable SISW backward curved plug fan, dynamically balanced, with AMCA certified blower [b] Flame proof foot mounted (B3 construction) 3-Phase squirrel cage induction motor 415 V ± 10%, 50 Hz ± 5 %, combined variation ±10%, insulation class F with temperature rise limited to class B, degree of protection IP 55, duty 51, ambient temperature 45 ºC, conforming to IS 12615: 2011, IS/IEC 60079-1: 2007, IS 3682: 1966 gas group II A, II B [c] Flexible connection made with airtight ASTM E84 (Class I) polyester fire retardant cloth riveted on periphery of cloth with extruded aluminium 'L' angle flange as per fan size at discharge duct/plenum [d] Washable type of 'EU4' filter (pre-filter, efficiency 90% down to 10 micron) and 'EU7' filters (Micro Vee filters, efficiency 99% down to 3 micron) [e] 6 / 8 rows deep chilled water cooling coil section with 0.15 mm thick aluminium fins and 0.36 mm diameter copper tubes tested on 21 kg/cm², with SS sandwiched drain tray, etc. (a 350 mm service section between eliminator and heater is required) [f] Condensate drain pan fabricated from 18 gauge SS 304, powder coated and insulated with elastomeric insulation of suitable thickness [g] 2/4 row deep heating coil section with aluminium fins and copper tube tested on 21 kg/cm² with SS sandwiched drain tray, etc. [h] AHU panel made out of 2.00 mm thick mild steel CRCA sheet, duly powder coated in compartmentalized construction with incomer and outgoing feeders for AHU motor, valve actuator motor, fire damper actuator motor, etc. complete with required variable frequency drive (VFD), relays, timers, contactors, PT, push buttons, switches, internal wiring, etc.

-

-

-

... More
[i] Variable Frequency Drive (VFD) with IP 55 enclosures and mains disconnect switch suitable and comprising of the following complete with accessories (1) Built in dual 5% impedance DC link reactor (harmonic filters) on the positive and negative rails of the DC bus of the Variable Frequency Drive. (2) Built in EMC filters (electro magnetic compatibility filters) for restriction of conducted emissions to comply with IEC61800:3 (un restricted distribution) :2004 Category C 1 (50 meter). (3) Three feedback PID controller having capability to simultaneously accept 3 feedback signals from temperature sensors or pressure sensors for process optimization and accordingly control the speed of the AHUs or pumps. (4) Integral graphical keypad. NOTES: [i] The rate of VFD and other necessary control equipment is deemed included in the quoted rate. [ii] The rate include for Necessary civil work viz. foundation for placement of AHU, mounting of variable frequency drive (VFD) panel, construction of opening(s) for fresh/exhaust air etc. shall be covered in the scope of work.

-

-

-

... More
Air Handling Unit suitable for delivering 26400 ft3/min @ 750 Pa total static pressure and having 6/8 rows deep cooling coil having cooling capacity 44 TR, 2/4 rows deep heating coil having capacity 75 kW and reheating coil of suitable size having capacity 40 kW with 18 kW flame-proof plug fan and VFD

1

-

-

... More
Air Handling Unit suitable for delivering 24000 ft3/min @ 750 Pa total static pressure and having 6/8 rows deep cooling coil having cooling capacity 32 TR, 2/4 rows deep heating coil having capacity 75 kW and reheating coil of suitable size having capacity 12 kW with 15 kW flame-proof plug fan and VFD

1

-

-

... More
M & L for CBRI certified 16-gauge GI fire damper, at least of 120 minutes fire-rating, spring activated on melting of fusible link having melting point 67.13° C complete with smoke detector / thermistor, fusible link etc. and actuator as required for operation, located in the SA / RA ducts, at all fire rated crossovers (shafts, walls, etc.) along with control panel (located in such a way that the reset may easily be done), interlocked with the building management system for the fire detection or HVAC to trip / close in the event of fire / smoke in the respective zone and tested as per UL-555 complete all as specified and directed by the Engineer-in-Charge. The fire dampers shall meet the following criteriaon: [i] Bare fire dampers with 400 mm sleeve [ii] Control panel actuator, including electrical spring type actuator, remote indication of the fire damper position [iii] Interconnection wire for the fire detection & alarm system with the AHU and the smoke dampers [iv] Sealing any openings around the sleeve of the fire dampers with approved fire sealant as per the specification & recommandations of the manufacturer.

-

-

-

... More
Motorized, spring return type, combination fire and smoke damper

2.5

-

-

... More
Control panel actuator, including electrical spring type actuator, remote indication of the fire damper position.

2

-

-

... More
Supply, installation, testing and commissioning of high performance airfoil class 1A leakage rated GI volume control damper having galvanised steel hat channel frame reinforced with corner braces, galvanised steel airfoil shaped blades (double skin construction) of 14 gauge thicknes, neoprene blade edge seals, flexible metal compressible jamb seals, stainless steel sleeve, linkage concealed in frame, etc. tested as per AMCA Standard 500-D-98 complete all as specified and directed by Engineer-in-Charge.

2.5

-

-

... More
Supply, installation, testing & balancing and commissioning of factory fabricated GI round / rectangular low pressure ducting of following sheet thickness having zinc coating of 120 g/m² total on both sides and complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, volume control dampers, hangers, supports, etc. as per approved drawings and conforming to IS 655: 2006 & the latest edition of HVAC Duct Construction Standards - Metal and Flexible of SMACNA along with required scaffolding work to install the ducts at site complete all as specified and directed by Engineer-in-Charge (only for OT rooms).

-

-

-

... More
24 gauge

95

-

-

... More
22 gauge

80

-

-

... More
20 gauge

455

-

-

... More
AIR TERMINALS M & L for exhaust air grill having welded steel border with aerodynamically shaped extruded aluminum blades having 30º fixed deflection & 20 mm blade spacing, countersunk screw holes in border, anodic acrylic paint finish etc. and tested as per ANSI / ASHRAE standard 70-2006 complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
Neck size 42''X8'' (Supply air grill)

38

-

-

... More
Neck size 42''X20'' (Return air grill)

4

-

-

... More
Neck size 46''X20'' (Return air grill)

4

-

-

... More
S & F of black flexible closed-cell elastomeric thermal insulation made of elastomeric foam based on synthetic rubber (NBR / PVC), tested for maximum service temperature 100 ºC as per ASTM C534 & minimum service temperature -50 ºC as per ASTM C534, thermal conductivity λ ≤ 0.037 W/mK at mean temperature θm = 24 ºC as per ASTM C518 / C177, ASTM C335, water absorption by volume ≤ 0.2% as per ASTM C 209 / C1763, flame spread index (FSI) & smoke development index (SDI) 25/50 as per ASTM E84, flammability HB, V-0 as per UL 94, fungi resistance as per ASTM G21/C1338, mould growth resistance as per ASTM E2180-18 / UL 181 and ozone resistance as per ASTM D 1149-18 along with self pre-covered self-adhering, UV treated glass cloth of thickness 7 mm / 200 GSM adhesives and other necessary accessories complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
19 mm thick thermal insulation (for supply air ducting)

512

-

-

... More
13 mm thick thermal insulation ( for return air ducting)

113

-

-

... More
S & F of wall mounted digital temperature cum %RH controller complete with large LCD, English display having operating voltage 24±10% V AC, 50 Hz frequency, ≤ 8 VA power consumption, 0.5 ºC temperature display resolution, 0.1% relative humidity display resolution, IP20 protection, etc. including battery and control wiring in PVC conduit from thermostat / humidistat in return air duct to AHU Room complete as specified and directed by Engineer-in-Charge.

2

-

-

... More
S & F of Indoor type wall mounted digital temperature cum %RH meter (Digital Thermo Hygrometer) complete with large LCD, English display having operating with 12/24H Max/Min temperature and humidity memory function range -50°C to 70°C Temperature accuracy 0.5 ºC and Humidity range 10% to 99% RH Humidity accuracy 5% RH Humidity resolution 1% RH Power source 1*AAA (1.5V) battery complete as specified and directed by the Engineer-in-Charge.

2

-

-

... More
Dismantling carefully and removing the existing water cooled chilled complete of 3 x 24 TR capacity including standby compressor, chilled & condensor water pump and all connecting water pipe lines, cooling tower and ducting, electrical control panel etc (Note: The rates quoted deemed to be inclusive of dismantling the existing AC Plant and its connected items including ducting, control panels with its accessories and also making good the disturbed surface i.e. repair to false celing, wall, floors, fitting electrical fittings fire fighting ceiling, smoke detector beam detector, damage wire etc caused while dismatling of AC Plant and its connected items pertains to B/R & E&M)

1

-

-

... More
AC PLANT AT UNCHIBASSI WATER-COOLED SCROLL CHILLER (3W+ 1S) Supply, installation, testing and commissioning of factory designed, pre-fabricated and floor-mounted modular type scroll chiller machine of min 52 TR actual capacity at site conditions complete with hermetic scroll compressors having independent refrigerant circuits, water-cooled S/T type condenser, S/T horizontal flooded type evaporator / cooler with carbon steel shell and seamless copper tubes with elastomeric insulation, suitable numbers of squirrel cage induction motor of suitable rating with class 'F' insulation, along with necessary drive arrangement, lubrication system as per manufacturer's design required for smooth and trouble-free operation of the chiller package, common base frame, interconnected copper refrigerant piping along with elastomeric insulation, fittings, valves, expansion valves and accessories to interconnect compressor, condenser, chiller and expansion valve, microprocessor based control panel comprising of controls including sensors and equipped with a keyboard, LCD touchscreen access input system, protection and monitoring devices to perform control functions, wiring, vibration isolators, gauge panel, automatic safety controls, flow switch at evaporator and condenser and ozone friendly, CFC-free refrigerant all complete as specified and directed by the Engineer-in-Charge The chiller shall conform to the following requirements / specifications: [i] Chilled water inlet/outlet temperature: 9.5°C /4.5 °C [ii] Evaporator fouling factor: 0.00010 ⁰Fft²hr/Btu [iii] Evaporator side pressure drop: 10 Ft of H2O (maximum) [iv] Condenser water inlet/outlet temperature: 32/36 °C [v] Condenser fouling factor: 0.00025 ⁰Fft²hr/Btu [vi] Condenser side pressure drop: 16 Ft of H2O (maximum) [vii] Minimum COP @ 100% load: 4.7 at AHRI condition [viii] Minimum IPLV @ 100% load: 5.8 at AHRI condition [x] Refrigerant (Ozone friendly type): R407C / R410a [xi] Test standard: ARI 550 / 590

4

-

-

... More
NOTES: [i] The quoted rate shall be inclusive of variable frequency drive (VFD) configured in accordance with site parameters, Victaulic coupling and system integrator capable of giving industry standard (Modbus/BACnet) output to BMS for critical parameters. [ii] The chiller OEM shall be manufacturer of its own compressors for easy maintenance. [iii] Mapping shall be required for all critical points displayed on the chiller control panel. The chiller shall be BMS compatible and shall have RS485 / RS232 serial communication protocol. [iv] The unit shall be suitable for 3- Phase, 415 V ± 10%, 50 Hz AC electric supply, with a built-in microprocessor based control panel. [v] Initial / first charge of refrigerant gas & lubrication oil shall be deemed included in the quoted rate [vi] Necessary civil work viz. foundation for placement of chillers, etc. shall be deemed included in the scope of work. [vii] Evaporator and condenser shall be of 2 pass only.

-

-

-

... More
CHILLED WATER CIRCULATION PUMP (2W + 1S) Supply, installation, testing and commissioning of self-priming, single-stage, centrifugal, monoset pump (chilled water circulation pump) suitable for 14.7 litre/s discharge @ 24 mWC head, conforming to IS 9079: 2018 & tested as per IS 5120: 1977 having cast iron casing, enclosed type dynamically balanced cast iron impeller, carbon steel pump shaft, gland packed sealing, deep groove ball bearings, etc. with energy efficient (IE4) TEFC squirrel cage induction motor, conforming to IS 12615: 2018, and suitable for operation on 3-Ph, 415 V±10%, 50 Hz AC supply, base plate, mounting channel frame, accessories and fittings, viz. pressure gauges, thermometers, drains, coupling, coupling guard, vibration isolation arrangement by means of spring / rubber type mounting duly insulated with FM approved highly- flexible, closed-cell thermal insulation of elastomeric foam based on synthetic rubber (NBR) of appropriate thickness laminated with 12 micron aluminium foil facing with reinforced glass scrim along with adhesives and other necessary accessories complete all as specified and directed by the Engineer-in-Charge. NOTES: [i] Necessary civil work viz. foundation for placement of pump and pump accessories shall be covered in the rates quoted by the contractor & nothing extra shall be admissible on this account. [ii] Pressure gauges, thermometers and drains shall be measured and paid for separately.

3

-

-

... More
FRP INDUCED DRAUGHT COOLING TOWER (1W + 0S) Supply, installation, testing and commissioning of CTI certified factory assembled / field erected, industrial duty, induced draft, counter-flow type, film fill P-FRP cooling tower suitable for 2625000 Btu/hr (220 TR) actual load to cool water from 36 ºC to 32 ºC (∆T 4 ºC) at entering wet bulb temperature 36.2 ºC having uniform water distribution and optimal heat transfer having casing of at least 5 mm thick UV stabilised fiberglass reinforced plastic (FRP) panels, laminated to each other providing a watertight seal, with stainless steel support structure of sufficient structural strength to withstand vibrations and wind velocity up to 60 m/s, mechanical access platform, HDPE shell and sump, FRP basin, low pressured spray system having totally enclosed, non-corroding PVC pipe with large orifice non-clog spray nozzle distribution with single water inlet for hot water distribution, diagonal offset flute, film type thermoformed PVC counterflow fill suitable for entering water temperatures up to 60 ºC, thermoformed UV resistant polypropylene cellular drift eliminators having drift losses ≤ 0.0005% of the water flow rate, propeller type direct driven fan incorporating wide-chord geometry and having FRP blades and steel hubs, energy efficient (IE4) TEFC squirrel cage induction motor squirrel cage induction motor(s), conforming to IS 12615: 2018, with class 'F' insulation complete with accessories all as specified and directed by the Engineer-in-Charge. NOTES: [i] Necessary civil work viz. foundation, supporting structure, etc. for placement of cooling tower shall be deemed included in the rates quoted by the contractor & nothing extra shall be admissible on this account. [ii] The fan motor shall be suitable for 3- Phase, 415 V ± 10%, 50 Hz AC supply.

1

-

-

... More
CONDENSER WATER PUMP (2W + 1S) Supply, installation, testing and commissioning of self-priming, single-stage, centrifugal, monoset pump (condenser water pump) suitable for 23.03 litre/s discharge @ 15 mWC head, conforming to IS 9079: 2018 & tested as per IS 5120: 1977 having cast iron casing, enclosed type dynamically balanced cast iron impeller, carbon steel pump shaft, gland packed sealing, deep groove ball bearings, etc. with energy efficient (IE4) TEFC squirrel cage induction motor, conforming to IS 12615: 2018, and suitable for operation on 3-Ph, 415 V±10%, 50 Hz AC supply, base plate, mounting channel frame, accessories and fittings, viz. pressure gauges, thermometers, drains, coupling, coupling guard, vibration isolation arrangement by means of spring / rubber type mounting along with adhesives and other necessary accessories complete all as specified and directed by the Engineer-in-Charge. NOTES: [i] Necessary civil work viz. foundation for placement of pump and pump accessories shall be covered in the rates quoted by the contractor & nothing extra shall be admissible on this account. [ii] Pressure gauges, thermometers and drains shall be measured and paid for saperately.

3

-

-

... More
EXPANSION TANK FOR CHILLED WATER/ HOT WATER CIRCUIT S & F of ASME pre-charged vertical closed bladder expansion tank, stamped for 125 PSI (862 kPa) working pressure having carbon steel shell, conforming to IS 2825: 1969, coated (inside & outside) with anti-corrosion paint with a heavy-duty butyl replaceable bladder, ring base, lifting rings, and 20 mm NPT piping connection protected by strainer at the water inlet, air charging valve connection to facilitate adjusting pre-charge pressure to meet actual system conditions complete with pressurization unit (pumps, etc.) accessories as specified and directed by the Engineer-in-Charge.

-

-

-

... More
100 Litre (Chilled Water circulation)

1

-

-

... More
50 Litre (Hot Water circulation)

1

-

-

... More
Supply, installation, testing and commissioning of fully BMS and SCADA compatible IP 55 rated electric Hot Water Generator (HWG) in vertical configuration, suitable for 400 kW heat output or 28000 kg/hr water flowrate, 2.5 to 4.0 kg/cm2 operating pressure range and 30 °C to 95 °C operating temperature range, having automatic stage sequence reversal, slave SCR power controller to modulate the entire load from 0-100%, embedded LCD, RS-232C / RS-485 port & ethernet port for communication, in-built self-diagnostic tool, etc. complete all as specified and directed by the engineer-in-charge. [Site #02] The HWG shall conform to the following requirements / specifications: [A] HEATING ELEMENTS (i) Pressure-rated flanged type immersion heaters, conforming to IS 4159: 2002, consisting of multiple tubular heating elements formed into hairpins which are silver-brazed to a mating flange [B] PRESSURE VESSEL (i) Water Vessel, conforming to IS 2825: 1969 rated for 160 psig maximum working pressure at 120 °C and tested at 300 psig having top openable thick MS plate designed for maximum element to water contact for efficient operation, welded to shell flange (ii) Connections for water inlet & outlet with mating flanges (iii) Descaling point & drain connection for system drainage [C] INSULATION (i) 50 mm thick resin bounded fibreglass wool of density 32 kg/cum and cladded with aluminum sheet to minimum heat loss

1

-

-

... More
[D] CONTROL CABINET (i) Integral control panel made out of 2.0 mm thick powder coated CRCA sheet having louvers to insure adequate ventilation of the control and heater terminal compartment (ii) Base frame fabricated out of ISMC100 channel (iii) hinged doors with lockable padlocks for access to all control compartments [E] CONTROL & SAFETY (i) Incomer MCCB with electrolytic grade copper busbar and mechanical interlock for safe operation (ii) Magnetic Contactors with MCB / HBC fuses for heater switching (iii) Pilot lights indicating the functional operation, i.e. Phase Indication, Each Stage ON, Supply ON, etc. (iv) Alarm package to de-energiz the boiler and give audible and visual indications of high temperature, low water level or zero flow rates (each condition should be indicated with a separate pilot light) (v) Pressure Relief Valve & Air Purge Valve (vi) Temperature & Pressure gauges at both inlet and outlet [F] STEP CONTROLLER (i) Temperature Control using microprocessor based multi-stage electronic progressive staging sequencer with thermistor sensor to control the HWG in stages (ii) Logic and Control circuits to continuously monitor the input signal to determine if more or less heat is required [G] BMS (i) Dry contacts for start / stop command, on / off status indication, fault indications, viz., high temperature and low water level, etc. (ii) Provision for remote operation and local remote selector switch status (iii) RS-485 communication port for remote programming and control (iv) Remote interlock to user enabled energizing or de-energizing of the HWG from remote or any field / pump interlock

-

-

-

... More
HOT WATER PUMP (2W + 1S) Supply, installation, testing and commissioning of monoblock, self-priming, single-stage centrifugal pump suitable for 4.50 litre/s discharge @ 20 mWC head having cast iron casing, enclosed type dynamically balanced cast iron impeller, carbon steel pump shaft, gland packed sealing, deep groove ball bearings, etc. with energy efficient (IE4) TEFC squirrel cage induction motor, conforming to IS 12615: 2018, and suitable for operation on 3-Ph, 415 V±10%, 50 Hz AC supply, base plate, mounting channel frame, accessories and fittings, viz. pressure gauges, thermometers, drains, coupling, coupling guard, vibration isolation arrangement by means of spring / rubber type mounting duly insulated with FM approved highly- flexible, closed-cell thermal insulation of elastomeric foam based on synthetic rubber (NBR) of appropriate thickness laminated with 12 micron aluminium foil facing with reinforced glass scrim along with adhesives and other necessary accessories complete all as specified and directed by Engineer-in-Charge. NOTES: [i] Necessary civil work viz. foundation for placement of pump and pump accessories shall be covered in the rates quoted by the contractor & nothing extra shall be pyable on this account. [ii] Pressure gauges, thermometers and drains shall be measured and paid for saperately.

3

-

-

... More
Supply, installation, testing and commissioning of factory made, CPRI / ERDA type tested, fully compartmentalized bolted type HVAC Panel (design verified assembly- DVA) of suitable size conforming to IEC 61439-1 & 2 and IEC 61641 and having modular extensible design suitable for indoor mounting, internal arc compliance of minimum 70 kA for 0.5 s, made out of 2.0 mm thick mild steel CRCA sheet, having both sides openable with hinged doors and locking arrangement, IP 43 & IK 10 protection, supported and fixed on structural frame of angle iron of suitable size, including earthing stud, labelling, painting to all internal & external exposed steel surfaces with powder coating paint (7 tank process), duly fixed in ground with PCC foundation (1:2:4) type B1, with danger notice plate of 1.6 mm thick mild steel vitreous enamelled (white) with letters, figures and conventional skull and bones in signal red colour suitable for 3-Phase, 4-Wire system, 500 V grade with necessary wiring, PVC sheathed stranded copper conductor of appropriate length and size, including fixing lugs, bolts, screws, etc. complete all as specified and directed by the Engineer-in-Charge. The HVAC Panel shall comprise of the following: [A] BUSBAR CHAMBER [i] 01 Set (3L + N) of aluminum busbar of rated capacity 1000 A, covered with PVC insulated sleeves including insulator, nuts, bolts, etc. with complete connection [B] INCOMING [i] Circuit Breaker (a) 1000 A, 415 V, Ics = 100% Icu = Icw (1 sec for total selectivity) = 50 kA, 50 Hz electrical draw-out type 4P ACB (with LSIG protection), conforming to IS/IEC 60947-2 & 3, having 100% neutral with inbuilt release protection, no derating up to 50 ⁰C, microprocessor based trip & LED based display systems with thermal memory providing overload, short-circuit, instantaneous & earth-fault protection, zone selective interlocking, pre-trip alarm & individual fault indicating LEDs, 20 trip record, % loading, bar graph, max. & min. meter and pre-alarm function for overload, short-circuit & earth fault - 01 Nos.

1

-

-

... More
[ii] Instrumentation & Measurement (a) Cl 1.0 multi-function meter capable of measuring V, A, F, PF, W/VA, Wh/VAh, Runhrs. Onhrs & interupts- 01 Nos. (b) 1000/5A Cl. 1.0 C.T. with 15 VA burden- 01 Nos. (c) 1000/5A Cl. 5P10 C.T. with 15 VA burden- 01 Nos. (d) 415/√3 V / 110/√3 V P.T. Cl.3P, 50 VA burden- 01 Nos. (e) 6A, 10kA, 415V, 50 Hz 4P MCB- 02 Nos. (iv) Indication & Annuciation (a) LED phase indicators (Red, Yellow, Blue)- 01 Set (b) LED status indicators (ON, OFF, TRIP)- 01 Set (c) LED status indicators (SC, CSH, RTC)- 01 Set [C] OUTGOING [i] Circuit Breaker (a) 800 A, 415 V, Ics = 100% Icu = Icw (1 sec for total selectivity) = 50 kA, 50 Hz electrical draw-out type 4P ACB (with LSIG protection), conforming to IS/IEC 60947-2 & 3, having 100% neutral with inbuilt release protection, no derating up to 50 ⁰C, microprocessor based trip & LED based display systems with thermal memory providing overload, short-circuit, instantaneous & earth-fault protection, zone selective interlocking, pre-trip alarm & individual fault indicating LEDs, 20 trip record, % loading, bar graph, max. & min. meter and pre-alarm function for overload, short-circuit & earth fault - 01 Nos. [HWG] (b) 200 A, 415 V, Ics = 100% Icu = 25 kA, 50 Hz 4P MCCB, conforming to IEC 60947-2: 2016, having microprocessor based trip unit, adjustable overload setting, adjustable short-circuit setting, adjustable neutral protection, electrical interlocking, front indication LEDs, etc.- 05 Nos. [for WATER COOLED CHILLER] (c) 100 A, 415 V, Ics = 100% Icu = 25 kA, 50 Hz 4P MCCB, conforming to IEC 60947-2: 2016, having thermal magnetic trip unit, adjustable overload setting, adjustable short-circuit setting, front indication LEDs, etc.- 06 Nos. [AHU PANEL] (d) 32 A, 415 V, Ics = 100% Icu = 25 kA, 50 Hz 3P MCCB, conforming to IEC 60947-2: 2016, having thermal magnetic trip unit, adjustable overload setting, adjustable short-circuit setting, front indication LEDs, etc.- 12 Nos. [CHWP, CDWP, HWP] (e) 63 A, 415 V, Ics = 100% Icu = 25 kA, 50 Hz 3P MCCB, conforming to IEC 60947-2: 2016, having thermal magnetic trip unit, adjustable overload setting, adjustable short-circuit setting, front indication LEDs, etc.- 02 Nos. [COOLING TOWER]

-

-

-

... More
[ii] Motor Starter / Drive (a) Variable Frequency Drive (VFD) of 9.3 kW rating with IP 55 enclosures and mains disconnect switch and comprising of the following complete with accessories of - 04 Nos. [FOR CHWP] (b) Variable Frequency Drive (VFD) of 3.70 kW rating with IP 55 enclosures and mains disconnect switch and comprising of the following complete with accessories - 04 Nos. [FOR HWP] The VFD drive shall conform to the following technical specification. (1) built-in dual 5% impedance DC link reactor (harmonic filters) on the positive and negative rails of the DC bus of the variable frequency drive (VFD). (2) built-in EMC filters (electro magnetic compatibility filters) for restriction of conducted emissions to comply with IEC61800: 3 (unrestricted distribution): 2004 category C 1 (50 meter) (3) three feedback PID controller having capability to simultaneously accept 3 feedback signals from temperature sensors or pressure sensors for process optimization and accordingly control the speed of pumps. (4) integral graphical keypad. (c) Fully automatic digital soft starter suitable for 7.5 kW drive having adaptive acceleration control, built-in RTD & thermistor inputs, programmable auto start/stop, emergency run operation, fully programmable overload trip, etc. complete with contactors, push button, LED type indicators, auto/manual selector switch, current sensing type single phase preventer complete with all accessories and wiring etc.- 04 Nos. (For CDWP) (d) Fully automatic digital soft starter suitable for 11 kW drive having adaptive acceleration control, built-in RTD & thermistor inputs, programmable auto start/ stop, emergency run operation, fully prgrammable overload trip, etc complete with contractors, push button, LED type indicators, auto/manual selector switch, current sensing type single phase preventer complete with all accessories and wiring etc - 02 Nos (FOR COOLING TOWER) [ii] Instrumentation & Measurement (a) Cl 1.0 multi-function meter capable of measuring V, A, F, PF, W/VA, Wh/VAh, Runhrs. Onhrs & interupts- 14 Nos. [ii] Indication & Annunciation (a) LED status indicators (ON, OFF, TRIP)- 27 Set

-

-

-

... More
NOTES: [i] ACBs shall have separately powered, individual fault trip indication LEDs (For overload, short circuit, earth fault and trip-unit failure) shall be available on the trip unit which shall function even in the absence of external power supply to the breaker.ACB shall be suitable for ZSI. Trip units shall have thermal memeory as standard. [ii] All the MCCBs up to 250 A shall be with thermal magnetic trip unit & above 250A shall be with microprocessor trip units. To ensure failsafe emergency tripping of the breakers (ACBs & MCCBs), it shall be supplied with continuous rated shunt trip coils. [iii] Necessary control and switching devices to execute the switching and control logic shall be deemed inclusive of the scope of supply irrespective of them being specified / not specified above or in the SLD. [iv] The Panel / Switchboard shall be tested to withstand vibration caused by an earthquake in accordance with IEC 60068-3-3:2013 or IS 1893 Zone V. [v] The Panel shall be purchased from the original equipment manufacturer (OEM) or OEM authorized franchises only. [vi] All the necessary noble components (viz., structural, Door noble like hinge, Bush, Door alignment guage and Bus bar noble - Bus bar support, Close profile structure - horizontal & vertical) of the Panel shall be supplied by the OEM. [vii] The Contractor shall furnish dimensional drawings of the items offered indicating all the fittings, dimensional tolerances, typical GADs, etc. to the engineer-in-charge. [ix] The Contractor shall intimate the Accepting Officer of the routine tests in the OEM factory in presence of a representative nominated by the Accepting Officer before dispatch.

-

-

-

... More
M & L for 1.1 kV grade XLPE insulated armoured cable of following sizes conforming to IS 7098 (Part 1): 1988, PVC inner sheath, single armouring of galvanised steel strip/wire and PVC Type ST-2 outer sheath conforming to IS 5831: 1984, including necessary clamping / dressing with cable ties and termination complete as all specified and directed by engineer- in- charge.

-

-

-

... More
25 sqmm, 4 core

120

-

-

... More
6.0 sq mm, 3 core

270

-

-

... More
10.0 sqmm, 3 core

50

-

-

... More
300 sqmm, 3.5 core

25

-

-

... More
70sq mm, 4 core

90

-

-

... More
S & F of perforated hot dipped galvanized iron cable tray having galvanization thickness not less than 50 microns and perforation not more than 17.5% including fittigs viz. joints, bends, tees, etc. in convenient sections of length complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
300 mm X 50 mm X 1.2 mm

10

-

-

... More
150 mm X 50 mm X 1.2 mm

10

-

-

... More
100 mm X 50 mm X 1.2 mm

10

-

-

... More
M & L for earthing complete with copper earth plate electrode of 60 cm X 60 cm X 3.15 mm size, buried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5 m below normal ground level, connected to copper strip of size 20 mm x 3 mm as earth lead, by means of bolts, buts, check nuts and washers of galvanised iron or steel, galvanized iron pipe of 40 mm diameter, connected to earthing test point, all as shown in electrical plate No. 5 connected to earthing test point all as specified or indicated including testing on completion and including excavation, earthwork, PCC earth pit of dimensions 550 mm X 550 mm (outer) and 300 mm X 300 mm (inner) and 250 mm deep, with a 10 mm thick CI cover, hinged to CI frame on ground level, GI watering pipe, funnel, etc. complete as specified and directed by the Engineer-in-Charge. (for chiller)

1

-

-

... More
M & L for earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required 20 mm X 3 mm copper strip complete as specified and directed by the Engineer-in-Charge.

15

-

-

... More
M & L for earthing complete with galvanized steel earth plate electrode of 60 cm x 60 cm x 6 mm size, buried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5 m below normal ground level, connected to GI wire of 4.0 mm diameter as earth lead, by means of bolts, buts, check nuts and washers of galvanised iron or steel, galvanized iron pipe of 40 mm diameter, connected to earthing test point, all as shown in electrical plate No. 5 connected to earthing test point all as specified or indicated including testing on completion and including excavation, earthwork, PCC earth pit of dimensions 550 mm X 550 mm (outer) and 300 mm X 300 mm (inner) and 250 mm deep, with a 10 mm thick CI cover, hinged to CI frame on ground level, GI watering pipe, funnel, etc. complete as specified and directed by the engineer-in-charge. (for CHP, CDP, HWP, CT)

3

-

-

... More
M & L for earth continuity conductor or main earthing lead fixed to wall on batten / recess / chases / buried in ground / drawn in conduit/pipe / fixed to poles / any other indicated situation for loop earthing etc. as required GI wire of 4.0 mm diameter complete as specified and directed by the Engineer-in-Charge.

20

-

-

... More
M & L for earthing complete with GI earth plate electrode of 60 cm X 60 cm X 6 mm size, buried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5 m below normal ground level, connected to GI strip of size 32 mm X 6 mm as earth lead, by means of bolts, buts, check nuts and washers of galvanised iron or steel, galvanized iron pipe of 40 mm diameter, connected to earthing test point, all as shown in electrical plate No. 5 connected to earthing test point all as specified or indicated including testing on completion and including excavation, earthwork, PCC earth pit of dimensions 550 mm X 550 mm (outer) and 300 mm X 300 mm (inner) and 250 mm deep, with a 10 mm thick CI cover, hinged to CI frame on ground level, GI watering pipe, funnel, etc.complete as specified and directed by the engineer-in-charge. (for HVAC Panel)

1

-

-

... More
M & L for earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required GI strip of size 32 mm x 6 mm complete as specified and directed by the Engineer-in-Charge.

15

-

-

... More
M & L for MS condenser water piping of following sizes including necessary fittings viz. flexible connections, bends, tees, reducers, flanges, air purge valves, drain valves, structural support, necessary clamps, vibration isolators, etc. including painting and supporting / fixing the pipe in excavated trenches or on floor / wall / ceiling with clamps, hangers, angles, channels (using anchor fasteners) with necessary accessories complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
200 mm

65

-

-

... More
150 mm

15

-

-

... More
125 mm NOTES: [i] The pipe size 150 mm NB & below shall be MS Class 'C' as per IS 1239 (Part- 1): 2004 & IS 1239 (Part- 2): 2011. [ii] The pipe size above 150 mm NB shall be welded black steel pipe heavy class as per IS 3589: 2001. [iii] Minimum thickness of MS sheet for pipe size above 150 mm NB and up to 350 mm NB shall be 6.35 mm and it shall be 7 mm for pipe size 400 mm NB and above.

20

-

-

... More
M & L for PN 1.6 rated 150 mm NB 'Y'- type strainer, having carbon cast steel (CCS) body & cover, conforming to ASTM A-216 Gr. WCB, SS 304 screen having ≤ 1.2 mm dia. perforation, flanged end connection, conforming to BS 10 Table J FF undrilled, neoprene rubber body & cover gasket, SS 410 drain plug complete with necessary accessories all as specified and directed by the Engineer-in-Charge.

3

-

-

... More
M & L for PN 1.6 rated wafer type, short / medium pattern cast iron (CI) butterfly valve of following sizes conforming to IS 13095: 2020, having CI Gr. FG200 body conforming to IS 210: 2009, seat having EPDM / nitrile rubber lining, SG iron / ductile cast iron disc, SS AISI- 410 stem, flanged end connection, conforming to BS 10 Table D/E & ANSI B 16.1 CI- 125 with necessary accessories complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
200 mm

3

-

-

... More
150 mm

6

-

-

... More
125 mm

8

-

-

... More
M & L for PN 1.6 rated straight type 150 mm NB cast iron (CI) reflux (non-return) valve, conforming to IS 5312-2: 1986, having CI Gr. FG200 body conforming to IS 210: 2009, bolted cover, integral / renewable seat, renewable disc, gunmetal trim with rubber seat ring, flanged end connection, conforming to IS 1538: 1993 with necessary accessories complete all as specified and directed by the Engineer-in-Charge.

3

-

-

... More
M & L for PN 1.6 rated precise balancing double regulation type cast iron (CI) balancing valve of 125 mm NB having CI Gr. FG200 body, EPDM / nitrile seal, stainless steel disc, ASTM A 276, Gr SS410 stem, EPDM / nitrile bush, MS gland nut, ASTM A 276 spindle, CI bonnet, SS304 baancing nut, MS bonnet cap, CI hand wheel, MS plug, stainless steel fastener, flanged end connection, etc., and duly insulated with elastomeric thermal insulation with necessary accessories complete all as specified and directed by the Engineer-in-Charge.

4

-

-

... More
M & L for chilled water piping of following sizes including necessary fittings viz. flexible connections, bends, tees, reducers, flanges, air purge valves, drain valves, structural support, necessary clamps, vibration isolators, etc. including painting and supporting / fixing the pipe in excavated trenches or on floor / wall / ceiling with clamps, hangers, angles, channels (using anchor fasteners) with necessary accessorie, duly insulated complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
200 mm

35

-

-

... More
150 mm

65

-

-

... More
125 mm

115

-

-

... More
100 mm

180

-

-

... More
65 mm NOTES: [i] The pipe size 150 mm NB & below shall be MS 'C' class as per IS 1239-1: 2004 & IS 1239-2: 2011. [ii] The pipe size above 150 mm NB shall be welded black steel pipe heavy class as per IS 3589: 2001. [iii] Minimum thickness of MS sheet for pipe size above 150 mm NB and up to 350 mm NB shall be 6.35 mm and it shall be 7 mm for pipe size 400 mm NB and above. [iv] Insulation shall be measured and paid for separately.

400

-

-

... More
Supply, installation, testing and commissioning of cast steel bolted cover Y-type strainer with CCS body conforming to ASTM A- 216 Gr. WCB, AISI 304 screen with 1.2 mm diameter perforation, 40 kg/cm2 body test pressure & 20 kg/cm2 maximum working pressure and standard flange end conforming to BS 10 Table F / Class-150, duly insulated complete all as specified and directed by the engineer-in-charge.

-

-

-

... More
125 mm

3

-

-

... More
65 mm NOTES: [i Insulation shall be measured and paid for separately.

5

-

-

... More
Supply, installation, testing and commissioning of wafer type PN 1.6 rated short pattern of following sizes CI body conforming to IS 210: 2009, seat having EPDM rubber lining, CF 8 stainless steel disc, AISI- 410 stainless steel stem, 2.4 MPa body test pressure & 1.6 MPa seat test pressure and standard flange end conforming to BS 10 Table D/E & ANSI B 16.1 CI- 125, duly insulated complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
125 mm nominal bore

6

-

-

... More
100 mm nominal bore

10

-

-

... More
65 mm nominal bore NOTES: Insulation shall be measured and paid for separately.

16

-

-

... More
Supply, installation, testing and commissioning of 125 mm nominal bore wafer type PN 1.6 rated swing check type multidoor reflux valve (NRV), designed & tested as per IS 5312 (Part- 2): 1986, suitable to handle clear water having turbidity up to 5000 PPM, with CI body, door and diaphragm, leaded tin bronze seat rings and flange drilling standard end connection, etc., duly insulated complete all as specified and directed by the Engineer-in-Charge.

3

-

-

... More
M & L for PN 1.6 rated precise balancing double regulation type cast iron (CI) balancing valve of following sizes EPDM / nitrile seal, stainless steel disc, ASTM A 276, Gr SS410 stem, EPDM / nitrile bush, MS gland nut, ASTM A 276 spindle, CI bonnet, SS304 baancing nut, MS bonnet cap, CI hand wheel, MS plug, stainless steel fastener, flanged end connection, etc., and duly insulated with elastomeric thermal insulation with necessary accessories complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
100 mm nominal bore

4

-

-

... More
65 mm nominal bore

5

-

-

... More
50 mm nominal bore

5

-

-

... More
Supply, installation, testing and commissioning of PN 16 rated 2-way pressure independent control valve (PICV) 65 mm nominal bore with sensor operated flow rate or power control and energy monitoring function, flange end connections, etc. for modulating water-side control of air handling units along with valve actuator complete all as specified and directed by the Engineer-in-Charge. The valve shall conform to the following technical specification: [i] Material (a) Valve body: EN-GJL-250 (b) Flow measuring pipe: EN-GJL-250 with protective paint (c) Closing element: Stainless steel AISI 316 (d) Spindle: Stainless steel AISI 304 (e) Spindle seal: EPDM (f) Seat: PTFE, O-ring Viton (g) Imersion sleeve: Stainless steel AISI 316 [ii] Electrical Data (a) Nominal Voltage: AC / DC 24 V (b) Nominal Voltage frequency: 50 Hz (c) Power consumption in operation: ≤ 7 W (d) Power consumption in rest position: ≤ 5 W [iii] Flow Measurement (a) Measuring principle: Ultrasonic volumetric flow measurement (b) Measuring accuracy flow: ±2%

1

-

-

... More
S & F of 32 mm thick off-white flexible closed-cell elastomeric thermal insulation (in tubular form) for the following pipes made of elastomeric foam based on synthetic rubber (NBR / PVC), tested for maximum service temperature 100 ºC as per ASTM C534 & minimum service temperature -50 ºC as per ASTM C534, thermal conductivity λ ≤ 0.037 W/mK at mean temperature θm = 24 ºC as per ASTM C518 / C177, ASTM C335, water absorption by volume ≤ 0.2% as per ASTM C 209 / C1763, flame spread index (FSI) & smoke development index (SDI) 25/50 as per ASTM E84, flammability HB, V-0 as per UL 94, fungi resistance as per ASTM G21/C1338, mould growth resistance as per ASTM E2180-18 / UL 181 and ozone resistance as per ASTM D 1149-18 along with self pre-covered self-adhering, UV treated glass cloth of thickness 7 mm / 200 GSM adhesives and other necessary accessories complete all as specified and directed by the engineer-in-charge.

-

-

-

... More
200 mm

25

-

-

... More
150 mm

15

-

-

... More
125 mm

20

-

-

... More
100 mm

45

-

-

... More
65 mm

50

-

-

... More
S & F of fire-retardant quality expanded polystyrene moulded pipe section (EPS) insulation for following pipes of density 20 kg/m3, with a thick coat of cold setting adhesive (CPRX compound) wrapping with 500g polythene faced hessian and finally sand cement plaster and tar felt cladding complete with type, grade-1 roofing felt strip, conforming to IS 1322: 1993, at joints repairing of damage to building etc. for the following diameters as required complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
200 mm

10

-

-

... More
150 mm

53

-

-

... More
125 mm

100

-

-

... More
100 mm

228

-

-

... More
65 mm

575

-

-

... More
M & L for drain water GI piping of following nominal bore including necessary fittings viz. flexible connections, bends, tees, reducers, flanges, air purge valves, drain valves, structural support, necessary clamps, vibration isolators, etc. including painting and supporting / fixing the pipe in excavated trenches or on floor / wall / ceiling with clamps, hangers, angles, channels (using anchor fasteners) with necessary accessories complete all as specified and directed by the engineer-in-charge.

-

-

-

... More
15 mm

31

-

-

... More
25 mm

5

-

-

... More
M & L for CL#125 two-piece design cast iron (CI) straight pattern ball valve, conforming to IS 9890: 1981 and having FG 200 cast iron body conforming to IS 210: 2009, AISI 410 stem, stainless steel AISI 304 ball, renewable PTFE seat & gland packing and screwed female BSP parallel threaded ends conforming to BS 21 with necessary accessories all complete as specified and directed by the Engineer-in-Charge.

-

-

-

... More
15 mm nominal bore

31

-

-

... More
25 mm nominal bore

1

-

-

... More
M & L for hot water piping including necessary fittings viz. flexible connections, bends, tees, reducers, flanges, air purge valves, drain valves, structural support, necessary clamps, vibration isolators, etc. including painting and supporting / fixing the pipe in excavated trenches or on floor / wall / ceiling with clamps, hangers, angles, channels (using anchor fasteners) with necessary accessories, duly insulated complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
100 mm nominal bore

93

-

-

... More
80 mm nominal bore

50

-

-

... More
65 mm nominal bore

225

-

-

... More
50 mm nominal bore NOTES: [i] The pipe size 150 mm NB & below shall be MS 'C' class as per IS 1239 (Part- 1): 2004 & IS 1239 (Part- 2): 2011. [ii] The pipe size above 150 mm NB shall be welded black steel pipe heavy class as per IS 3589: 2001. [iii] Minimum thickness of MS sheet for pipe size above 150 mm NB and up to 350 mm NB shall be 6.35 mm and it shall be 7 mm for pipe size 400 mm NB and above. [iv] Insulation shall be measured and paid for separately.

384

-

-

... More
S & F of off-white flexible closed-cell 32 mm thick elastomeric thermal insulation (in tubular form) made of elastomeric foam based on synthetic rubber (NBR / PVC), tested for maximum service temperature 100 ºC as per ASTM C534 & minimum service temperature -50 ºC as per ASTM C534, thermal conductivity λ ≤ 0.037 W/mK at mean temperature θm = 24 ºC as per ASTM C518 / C177, ASTM C335, water absorption by volume ≤ 0.2% as per ASTM C 209 / C1763, flame spread index (FSI) & smoke development index (SDI) 25/50 as per ASTM E84, flammability HB, V-0 as per UL 94, fungi resistance as per ASTM G21/C1338, mould growth resistance as per ASTM E2180-18 / UL 181 and ozone resistance as per ASTM D 1149-18 along with self pre-covered self-adhering, UV treated glass cloth of thickness 7 mm / 200 GSM adhesives and other necessary accessories complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
80 mm

10

-

-

... More
50 mm

10

-

-

... More
S & F of fire-retardant quality expanded polystyrene moulded pipe section (EPS) insulation of density 20 kg/m3, with a thick coat of cold setting adhesive (CPRX compound) wrapping with 500g polythene faced hessian and finally sand cement plaster and tar felt cladding complete with type, grade-1 roofing felt strip, conforming to IS 1322: 1993, at joints repairing of damage to building etc. for the following diameters as required complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
80 mm

50

-

-

... More
50 mm

384

-

-

... More
Supply, installation, testing and commissioning of cast steel bolted cover Y-type strainer with CCS body conforming to ASTM A- 216 Gr. WCB, AISI 304 screen with 1.2 mm diameter perforation, 40 kg/cm2 body test pressure & 20 kg/cm2 maximum working pressure and standard flange end conforming to BS 10 Table F / Class-150, duly insulated complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
100 mm

1

-

-

... More
65 mm

3

-

-

... More
50 mm

5

-

-

... More
Supply, installation, testing and commissioning of wafer type PN 1.6 rated swing check type multidoor reflux valve (NRV), of following sizes designed & tested as per IS 5312 (Part- 2): 1986, suitable to handle clear water having turbidity up to 5000 PPM, having CI body, door and diaphragm, leaded tin bronze seat rings and flange drilling standard end connection, etc., duly insulated complete all as specified and directed by the Engineer-in-Charge.

-

-

-

... More
100 mm

1

-

-

... More
65 mm

3

-

-

... More
Supply, installation, testing and commissioning of PN 16 rated 2-way pressure independent control valve (PICV) of 50mm nominal bore with sensor operated flow rate or power control and energy monitoring function, flange end connections, etc. for modulating water-side control of air handling units along with valve actuator complete all as specified and directed by the Engineer-in-Charge. The valve shall conform to the following technical specification: [i] Material (a) Valve body: EN-GJL-250 (b) Flow measuring pipe: EN-GJL-250 with protective paint (c) Closing element: Stainless steel AISI 316 (d) Spindle: Stainless steel AISI 304 (e) Spindle seal: EPDM (f) Seat: PTFE, O-ring Viton (g) Imersion sleeve: Stainless steel AISI 316 [ii] Electrical Data (a) Nominal Voltage: AC / DC 24 V (b) Nominal Voltage frequency: 50 Hz (c) Power consumption in operation: ≤ 7 W (d) Power consumption in rest position: ≤ 5 W [iii] Flow Measurement (a) Measuring principle: Ultrasonic volumetric flow measurement (b) Measuring accuracy flow: ±2%

5

-

-

... More
Supply, installation, testing and commissioning of wafer type PN 1.6 rated short pattern CI butterfly valve of 50mm nominal bore having Gr. FG-200 CI body conforming to IS 210: 2009, seat having EPDM rubber lining, CF 8 stainless steel disc, AISI- 410 stainless steel stem, 2.4 MPa body test pressure & 1.6 MPa seat test pressure and standard flange end conforming to BS 10 Table D/E & ANSI B 16.1 CI- 125, duly insulated complete all as specified and directed by the Engineer-in-Charge.

10

-

-

... More
M & L for PN 1.6 rated air vent valve having brass body, cover, adopter, disc assembly & cap, stainless steel strainer, plastic float and 20 mm screwed threaded ends suitable for maximum operating temperature 100 °C installed on all high points in the water piping system to automatically remove the trapped air with necessary accessories all complete as specified and directed by the Engineer-in-Charge.

4

-

-

... More
S & F of 6" dual scale (°F / °C), lower mount (radial), bimetal thermometer having 0.5 NPT process connection, Grade A accuracy class as per ASME B40.200, stem diameter 6.35 mm, laminated safety glass window, stainless steel 304 case, steam, process connection & joint, aluminium dial & pointer, IP67 protection, scale range 0- 60 °C with necessary accessories all complete as specified and directed by the Engineer-in-Charge.

38

-

-

... More
S & F of 4" bourdon tube pressure gauge conforming to EN 837-1, having copper alloy process connection & pressure element, plastic black pointer & case, plastic crystal-clear window, snap-fitted in case, accuracy class 2.5, scale range 0- 25 bar with necessary accessories all complete as specified and directed by the Engineer-in-Charge.

58

-

-

... More
AIR DISTRIBUTION DOUBLE SKIN AIR HANDLING UNIT Supply, installation, testing and commissioning of 24500 CFM @ 750 Pa. static pressure double-skin type horizontal, floor-mounted, top / side discharge air handling unit and having thermal break profile complete with air-tight casing using gaskets and self-adhesive tapes 0.8 mm thick pre-coated outer skin and 0.6 mm thick GI inner skin, 45±2 mm thick double skin panel with pressure injected CFC/HCFC free PUF having 'k' value of 0.02 W/°C/m & density 40 kg/m³, AMCA certified energy efficient plug fan(s) with backward curved impellers for high static pressure mounted on aluminium extruded siderail base frame with VFD, EU4 pre-filter and EU7 fine filter (mounted on a common frame), combination of 6/8 rows deep chilled water coil(s), 2/4 rows deep hot water coil(s) with anti-corrosion aluminium fins, suitable high efficiency (IE3) TEFC squirrel cage flame proof induction motor, PVC/nylon hinges & handles, view port and marine lamp, limit switch, SS-304 drain pan, vibration isolators/rubber pads (minimum 1" thick) inspection windows / doors, mixing box and supply / return / fresh air openings fitted with aluminium volume control dampers, thermostat & humidistate,etc. complete all as specified and directed by the engineer-in-charge. The AHU shall comprise of the following: [a] Suitable SISW backward curved plug fan, dynamically balanced, with AMCA certified blower [b] Flameproof foot mounted (B3 construction) 3-Phase squirrel cage induction motor 415 V ± 10%, 50 Hz ± 5 %, combined variation ±10%, insulation class F, (for Blower of AHU) of 15 kW capacity, 22000 CFM with temperature rise limited to class B, degree of protection IP 55, duty 51, ambient temperature 45 ºC, conforming to IS 12615: 2011, IS/IEC 60079-1: 2007, IS 3682: 1966 gas group II A, II B [c] Flexible connection made with airtight ASTM E84 (Class I) polyester fire retardant cloth riveted on periphery of cloth with extruded aluminium 'L' angle flange as per fan size at discharge duct/plenum

5

-

-

... More
[d] Washable type of 'EU4' filter (pre-filter, efficiency 90% down to 10 micron) and 'EU7' filters (Micro Vee filters, efficiency 99% down to 3 micron) [e] 6 / 8 rows deep chilled water cooling coil section with 0.15 mm thick aluminium fins and 0.36 mm diameter copper tubes tested on 21 kg/cm², with SS sandwiched drain tray, etc. (a 350 mm service section between eliminator and heater is required) [f] Condensate drain pan fabricated from 18 gauge SS 304, powder coated and insulated with elastomeric insulation of suitable thickness [g] 2/4 row deep heating coil section with aluminium fins and copper tube tested on 21 kg/cm² with SS sandwiched drain tray, etc. [h] AHU panel made out of 2.00 mm thick mild steel CRCA sheet, duly powder coated in compartmentalized construction with incomer and outgoing feeders for AHU motor, PAN type humidifier, 3-way valve actuator motor, fire damper actuator motor, etc. complete with required variable frequency drive (VFD), relays, timers, contactors, PT, push buttons, switches, internal wiring, etc. [i] Variable Frequency Drive (VFD) with IP 55 enclosures and mains disconnect switch suitable for 5.5 kW and comprising of the following complete with accessories (1) Built in dual 5% impedance DC link reactor (harmonic filters) on the positive and negative rails of the DC bus of the Variable Frequency Drive. (2) Built in EMC filters (electro magnetic compatibility filters) for restriction of conducted emissions to comply with IEC61800:3 (un restricted distribution) :2004 Category C 1 (50 meter). (3) Three feedback PID controller having capability to simultaneously accept 3 feedback signals from temperature sensors or pressure sensors for process optimization and accordingly control the speed of the AHUs or pumps. (4) Integral graphical keypad. NOTES: [i] The price of VFD and other necessary control equipment is deemed included in the quoted rate. [ii] Necessary civil work viz. foundation for placement of AHU, mounting of variable frequency drive (VFD) panel, construction of opening(s) for fresh/exhaust air etc. shall be covered in the scope of work.

-

-

-

... More
FIRE & SMOKE DAMPER M & L for CBRI certified 16-gauge GI fire damper, at least of 120 minutes fire-rating, spring activated on melting of fusible link having melting point 67.13° C complete with smoke detector / thermistor, fusible link etc. and actuator as required for operation, located in the SA / RA ducts, at all fire rated crossovers (shafts, walls, etc.) along with control panel (located in such a way that the reset may easily be done), interlocked with the building management system for the fire detection or HVAC to trip / close in the event of fire / smoke in the respective zone and tested as per UL-555 complete all as specified and directed by the engineer-in-charge. The fire dampers shall meet the following criteriaon: [i] Bare fire dampers with 400 mm sleeve [ii] Control panel actuator, including electrical spring type actuator, remote indication of the fire damper position [iii] Interconnection wire for the fire detection & alarm system with the AHU and the smoke dampers [iv] Sealing any openings around the sleeve of the fire dampers with approved fire sealant as per the specification & recommandations of the manufacturer.

-

-

-

... More
Motorized, spring return type, combination fire and smoke damper

5

-

-

... More
Control panel actuator, including electrical spring type actuator, remote indication of the fire damper position.

5

-

-

... More
GI SHEET DUCTING Supply, installation, testing & balancing and commissioning of factory fabricated aluminium round / rectangular low pressure ducting of following sheet thickness having zinc coating of 120 g/m² total on both sides and complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, volume control dampers, hangers, supports, etc. as per approved drawings and conforming to IS 655: 2006 & the latest edition of HVAC Duct Construction Standards - Metal and Flexible of SMACNA along with required scaffolding work to install the ducts at site complete all as specified and directed by engineer-in-charge.

-

-

-

... More
24 gauge

70

-

-

... More
22 gauge

330

-

-

... More
20 gauge

940

-

-

... More
VOLUME CONTROL DAMPER Supply, installation, testing and commissioning of high performance airfoil class 1A leakage rated GI volume control damper having galvanised steel hat channel frame reinforced with corner braces, galvanised steel airfoil shaped blades (double skin construction) of 14 gauge thicknes, neoprene blade edge seals, flexible metal compressible jamb seals, stainless steel sleeve, linkage concealed in frame, etc. tested as per AMCA Standard 500-D-98 complete all as specified and directed by Engineer-in-Charge.

8

-

-

... More
AIR TERMINALS M & L for 42" X 8" supply grill having welded steel border with aerodynamically shaped extruded aluminum blades having 30º fixed deflection & 20 mm blade spacing, countersunk screw holes in border, anodic acrylic paint finish, etc. and tested as per ANSI / ASHRAE standard 70-2006 complete all as specified and directed by the Engineer-in-Charge.

90

-

-

... More
M & L for 42" X 20" return grill having welded steel border with aerodynamically shaped extruded aluminum blades having 30º fixed deflection & 20 mm blade spacing, countersunk screw holes in border, anodic acrylic paint finish, etc. and tested as per ANSI / ASHRAE standard 70-2006 complete all as specified and directed by the Engineer-in-Charge.

20

-

-

... More
THERMAL INSULATION S & F of black flexible closed-cell elastomeric thermal insulation made of elastomeric foam of following thickness based on synthetic rubber (NBR / PVC), tested for maximum service temperature 100 ºC as per ASTM C534 & minimum service temperature -50 ºC as per ASTM C534, thermal conductivity λ ≤ 0.037 W/mK at mean temperature θm = 24 ºC as per ASTM C518 / C177, ASTM C335, water absorption by volume ≤ 0.2% as per ASTM C 209 / C1763, flame spread index (FSI) & smoke development index (SDI) 25/50 as per ASTM E84, flammability HB, V-0 as per UL 94, fungi resistance as per ASTM G21/C1338, mould growth resistance as per ASTM E2180-18 / UL 181 and ozone resistance as per ASTM D 1149-18 along with self pre-covered self-adhering, UV treated glass cloth of thickness 7 mm / 200 GSM adhesives and other necessary accessories complete all as specified and directed by the engineer-in-charge.

-

-

-

... More
19 mm thick thermal insulation (for supply air ducting)

1030

-

-

... More
13 mm thick thermal insulation ( for return air ducting)

300

-

-

... More
S & F of wall mounted digital temperature cum %RH controller complete with large LCD, English display having operating voltage 24±10% V AC, 50 Hz frequency, ≤ 8 VA power consumption, 0.5 ºC temperature display resolution, 0.1% relative humidity display resolution, IP20 protection, etc. including battery and control wiring in PVC conduit from thermostat / humidistat in return air duct to AHU Room complete as specified and directed by Engineer-in-Charge.

5

-

-

... More
S & F of Indoor type wall mounted digital temperature cum %RH meter (Digital Thermo Hygrometer) complete with large LCD, English display having operating with 12/24H Max/Min temperature and humidity memory function range -50°C to 70°C Temperature accuracy 0.5 ºC and Humidity range 10% to 99% RH Humidity accuracy 5% RH Humidity resolution 1% RH Power source 1*AAA (1.5V) battery complete as specified and directed by the Engineer-in-Charge.

5

-

-

... More
Dismantling carefully and removing the existing water cooled chilled complete of 3 x 50 TR capacity compressor, chilled & condensor water pump and all connecting water pipe lines, cooling tower and ducting, electrical control panel etc complete all as specified and directed. (Note : The rates quoted deemeds to be inclusive of dismantling the existing AC Plant and its connected items including ducting, control panels with its accessories and also making good the distributed surface i.e. repair to false ceiling, walls, floors, fitting electrical fittings fire fighting ceiling, smoke detector beam detector, damage wire etc caused while dismantling of AC Plant and its connected items pertains to B/R & E/M)

1

-

-

... More
EXTERNAL ELECTRIFICATION Supply, install, testing and commissioning of copper wound step down transformer, outdoor type, oil immersed, naturally cooled ONAN, rated temperature rise in oil & winding 45/50 degree centigrade complete with standard fittings of capacity 500 KVA HT 11 KV, 3 phase, LT 433V, 4 wire, 50 HZ vector group Dyn-11 with off load tap changing device on HT side to vary secondary voltage from +5 percent to -10 percent in steps of 2.5% including cable box on LT and HT side, first fill of new transformer oil having dielectric strength not less than 60KV, suitable mounting rails of appropriate gauge and other standard accessories all as per IS : 1180 (Part 1) : 2014 (with latest amendment) Note :- The rate quoted deemed to be inclusive of the followig:- (a) Accessories such as oil level gauge, rating and diagram plate, monogram plate, explosive vent with diaphragm, thermometer pocket with thermometer, gun metal drain valve at bottom, Air release plug, inspection cover, lifting lugs, hooks, bi-directional plane rollers, oil temperature indicator, winding temperature indicator, silica gel breather & other standard accessories all as per IS : 1180 (Part-1) : 2014 energy efficiency level 3 and losses as per clause No 7.8.1.1 of IS 1180 (Pt-I)-2014 etc. Any other item as per manufacturer recommendations for best function of transformer if required are deemed to be included in quoted rates. (b) The cost include in the quoted rate for Dismantling/ Removing and deposits to MES Store of the existing BER transformer.

1

-

-

... More
Supply, laying and testing cable XLPE insulated, screened, PVC bedded, galvanized steel strip or wire amoured, electric power cables (heavy duty 1100 Volts grade with stranded aluminium conductor of size 300 sq mm 3.5 core.

250

-

-

... More
DG Set Dismantling of existing DG set with connected accessories such as LT panel, AMF Panel, LT cable connections etc and shifting of complete asset to 18 FAD Unchbassi Depot power house, and reinstalling including preparation of platform as per manufaturer norms (100 KVA DG Set at Unchbassi decleared BER) Note : Rate deemed to be inclusive of dismantling, shifting, cost of platform as per manufacturer norms and all necessary electrical connections and making the same functional.

1

-

-

... More
Supply, install, test and commissioning of 200 KVA/160 KW diesel engine driveb Generating set with alternator out put Voltage 415 Volts +/- 1% at set value of 415 V at a frequency 50 HZ +/- 0.5% with suitable standard control panel, (NTP for suitable for installing at 2 ASD Pathankot, all mounted in acoustic enclosure and Control panel including AMF Panel as per manufacturers design and specification as per approved CPCB-04+ norms confirming to the detailed specifications appended below:- (I) ENGINE (a) General : Suitable foir stroke compressed ignition, radiator water cooled, Turbocharged aspiration, continuous duty with 10% overload capacity for any one hour in 12 hours runnnig, 50 ºC intake air temperature, CPCB-4+ Euro emission engine developing 215 BHP at 1500 RPM coupled to alternator mounted on Channel iron base frame with in built fuel tank of minimum capacity suitable for 12 Hrs continuous running. The prime mover provided should be as per IS specifications. (b) Air intake system : Should comprise of dry type intake air filter mounted on engine, one in number vacuum indicator mounted on intake piping. (c) Exhaust System : Should comprise of one exhaust manifold, dry type, mounted on engine, one exhaust residential type silencer which should be positioned in such a way that the exhaust gas is not sucked by the fan on the radiator, thereby affecting the cooling system. The silencer should cater to the noise level tolerance prescribed in the relevant IS/BS. The silencer should be provided with flaps with a provision so that it will open only when the generator is running. The complete exhaust system shall be properly supported so that entire lot of the exhaust system shall not fall on the DG Set. (d) Fuel System : Should comprise of disposal type element fuel filter, pressure type fuel pump mounted on engine, non return check valve in fuel supply and drain lines, wire braided hose between filter and pump, fuel system with suitable capacity electronic governor and engine mounted actuator. The fuel tank must have proper locking arrangement with level indicator and to be integrated with base frame.

1

-

-

... More
(e) Cooling System : Should comprise of radiator designed and tested for 50 ºC ambient temperature with 7 PSI pressure cap mounted on base rail. The thermostat installed in the engine coolant outlet, fresh water pump mounted on engine, fan and fan hub mounted on engine. A reservoir of 50% of radiator capacity to replenish coolant by gravity (as and when required) is also to be provided. (f) Lubricating System : Should comprise of lubricating oil sump mounted on engine, gear driven lub oil pump mounted on engine, lubricating oil cooler-fresh water cooled integral with engine cool out circuit mounted on engine, oil filter lubricating with cap and lubricating oil dip stick for oil level check mounted on engine. The system should be capable of feeding lube oil to the main end & large end bearings, cam shaft, valve rocker gear and all moving parts. (g) Starting System : Should comprise of suitable voltage DC electrical starter mounted on engine, with suitable maintenance free batteries of capacity 12/24 V DC with suitable AH to be mounted in trays (having rubber insulation) on the main frame. It should have the provision to charge the battery from external sources during static condition and while running of the generator. (h) AC Generator : The generator shall be horizontal and foot mounted, 200 KVA, 415 Volts, 3 phase, 4 wire, 0.8 PF, 50HZ, self excited, self regulated, brushless AC generator, suitable for an ambient temperature of 50 ºC with IP-23 enclosures class H insulation and temperature rise limited to H as per following technical details (i) Type, brush less AC generators (ii) Output rating 200 KVA (iii) Output voltage : 415 + 1% under all loading conditions. (iv) Output frequency 50 Hz + 0.5% up to 0.8 lagging (v) No of phases : 3 phase with 01 neutral (4 wire) (vi) Mounting : Horizontal foot mounted (vii) Enclosure : Minimum IP-23/ Drip proof and screen protected (viii) Automatic voltage regulator (ix) Class of insulation-H

-

-

-

... More
Note : Following shall be deemed to be included in cost quoted :- (i)Suitable size RCC cement concrete foundation platform of canopy base with height as required at site to mount the generator as per manufacturer's instruction/ recommendations. The cost of foundation bed incl earth work etc is deemed to be included in the quoted rate. (ii) Connecting existing cables, from existing panels and connecting cables, cables glands, cable lugs to new panel complete with all necessary accessories. (iii) Install on the foundation, connecting fuel lines, cable etc (iv) Test and commissioning complete (v) The cost of control cable from engine control panel to AMF panel shall be deemed to be included in the cost quoted. (j) BASE FRAME : Shall be stand by and fabricated with CRCA sheet metal which shall be suitable to mount the engine, altenator and radiator, channel width of base frame shall be adequate to accommodate anti-vibbration pads. (k) CONTROL PANEL : Shall be indoor type manufactured with 14/16 gauge CRCA sheet and is power coated for weather-proff and long lasting finish consisting of microprocessor power command controller, Aluminium busbar with suitable capacity with incoming/ outgoing terminals, indicating lamps for 'Load ON' and 'Self Running' instrument fuses only wired and ferruled, MCCB of suitable rating with overload and short circuit protections, Volt meter, ammeter with selector switches, Frequency meter, energy meter, CTs and 3 Phase indicating lamps, timers etc all as per latest engineering practices etc complete all as specified and directed. (m) Accessories:- (i) 01 No standard mechanical and electrical tool box. (ii) Internal covered tube lights.

-

-

-

... More
(n) Acoustic enclosure : Specially designed to meet CPCB norms 75dBA @ 1mtr at 75% load under free field conditions. The acoustic enclosure is made of CRCA sheets and a structural/ sheet metal base with high quality noise absorbent and fire retardant garde acoustic insulation material (P.U. Form) complying to IS 8183 with two point lifting handles (a) Internal Lighting : Tube lights with protective mesh around it to be fitted inside the container for proper illumination (b) Doors : The enclosurewill be provided with suitable doors on the side and reae to enter the enclosure during operation and maintainance. All doors doors will be provided with lock and handles for opening/ closing the doors, retainers for holding the panel door. (p) Painting Scheme ISS shde 220 olive green 1994 or all as per manufacturers specifications (q) Lifting/ Transportation arrangement :- Container with suitable corners will be provided to lift the DG set along with container. This is suitable for road/ rail/ sea transportation (r) Trials :- Trials on site should be given as per load tests prescribed and all functional trials should be shown. Note:- (i) The engine, alternator, Control panel, Acoustic enclosure shaqll be integrated unit sourced from OEM only as per make given in Sch 'A'.

-

-

-

... More
Material and labour earthing with steel earth plate electrode of size 60x60cmx60mm thick buried directly in ground to a depth not less than 2.25 mtr deep below normal ground level with top edge of the earth plate not less than 1.5mtr deep below normal ground level connected to galvanized iron strip of size 32x6mm as earthing lead by means od nuts, bolts and washers of steel after welding pf GI strip to earth elctrode to the full length of earth plate, 40mm dia GI liiight grade watering pipe with funnel and wire mesh, RCC pit cover of size 300x300x40mm reinforced with XPM having weight not kess than 4Kg/sqmm including 6mm thick MS bar handle made to shape, PCC pit with 1:3:6 type C1 with angle iron frame made of angle iron of size 40x40x4mm, adequate qty of charcoal dust and salt layers all around the erth plate, excavation, earth work in any type of soil, removal of excavated soil abd returning filling in all as required at site complete all as specified in plate No 3 of SSR Part-I and akk as specified or indiated including testing on completion. Note :- Rates inclusive of necessary excavation in any type of soil, earth work, PCC pit, RCC cover, funnel with watering pipe, GI earth strip upto 7.5m long for connecting to test point etc all as required at site for complete earthing.

9

-

-

... More
(2) DG Set Supply, install, testing and commissioning of 250 KVA/200 KW diesel engine driven Generating set with alternator out put Voltage 415 Volts +/- 1% at set value of 415 V at a frequency 50 HZ +/- 0.5% with suitable standard control panel, (NTP for suitable for installing at 18 FAD Unchibassi, all mounted in acoustic enclosure and control panel including AMF Panel as per manufacturers design and specification as per approved CPCB-04+ norms confirming to the detailed specifications appended below:- (I) ENGINE (a) General : Suitable four stroke compressed ignition, radiator water cooled, Turbocharged aspiration, continuous duty with 10% overload capacity for any one hour in 12 hours runnnig, 50 ºC intake air temperature, CPCB-4+ Euro emission engine developing 215 BHP at 1500 RPM coupled to alternator mounted on Channel iron base frame with in built fuel tank of minimum capacity suitable for 12 Hrs continuous running. The prime mover provided should be as per IS specifications. (b) Air intake system : Should comprise of dry type intake air filter mounted on engine, one in number vacuum indicator mounted on intake piping. (c) Exhaust System : Should comprise of one exhaust manifold, dry type, mounted on engine, one exhaust residential type silencer which should be positioned in such a way that the exhaust gas is not sucked by the fan on the radiator, thereby affecting the cooling system. The silencer should cater to the noise level tolerance prescribed in the relevant IS/BS. The silencer should be provided with flaps with a provision so that it will open only when the generator is running. The complete exhaust system shall be properly supported so that entire lot of the exhaust system shall not fall on the DG Set. (d) Fuel System : Should comprise of disposal type element fuel filter, pressure type fuel pump mounted on engine, non return check valve in fuel supply and drain lines, wire braided hose between filter and pump, fuel system with suitable capacity electronic governor and engine mounted actuator. The fuel tank must have proper locking arrangement with level indicator and to be integrated with base frame.

1

-

-

... More
(e) Cooling System : Should comprise of radiator designed and tested for 50 ºC ambient temperature with 7 PSI pressure cap mounted on base rail. The thermostat installed in the engine coolant outlet, fresh water pump mounted on engine, fan and fan hub mounted on engine. A reservoir of 50% of radiator capacity to replenish coolant by gravity (as and when required) is also to be provided. (f) Lubricating System : Should comprise of lubricating oil sump mounted on engine, gear driven lub oil pump mounted on engine, lubricating oil cooler-fresh water cooled integral with engine cool out circuit mounted on engine, oil filter lubricating with cap and lubricating oil dip stick for oil level check mounted on engine. The system should be capable of feeding lube oil to the main end & large end bearings, cam shaft, valve rocker gear and all moving parts. (g) Starting System : Should comprise of suitable voltage DC electrical starter mounted on engine, with suitable maintenance free batteries of capacity 12/24 V DC with suitable AH to be mounted in trays (having rubber insulation) on the main frame. It should have the provision to charge the battery from external sources during static condition and while running of the generator. (h) AC Generator : The generator shall be horizontal and foot mounted, 200 KVA, 415 Volts, 3 phase, 4 wire, 0.8 PF, 50HZ, self excited, self regulated, brushless AC generator, suitable for an ambient temperature of 50 ºC with IP-23 enclosures class H insulation and temperature rise limited to H as per following technical details (i) Type, brush less AC generators (ii) Output rating 200 KVA (iii) Output voltage : 415 + 1% under all loading conditions. (iv) Output frequency 50 Hz + 0.5% up to 0.8 lagging (v) No of phases : 3 phase with 01 neutral (4 wire) (vi) Mounting : Horizontal foot mounted (vii) Enclosure : Minimum IP-23/ Drip proof and screen protected (viii) Automatic voltage regulator (ix) Class of insulation-H

-

-

-

... More
Note : Following shall be deemed to be included in cost quoted :- (i)Suitable size RCC cement concrete foundation platform of canopy base with height as required at site to mount the generator as per manufacturer's instruction/ recommendations. The cost of foundation bed incl earth work etc is deemed to be included in the quoted rate. (ii) Connecting existing cables, from existing panels and connecting cables, cables glands, cable lugs to new panel complete with all necessary accessories. (iii) Install on the foundation, connecting fuel lines, cable etc (iv) Test and commissioning complete (v) The cost of control cable from engine control panel to AMF panel shall be deemed to be included in the cost quoted. (j) BASE FRAME : Shall be stand by and fabricated with CRCA sheet metal which shall be suitable to mount the engine, altenator and radiator, channel width of base frame shall be adequate to accommodate anti-vibration pads. (k) CONTROL PANEL : Shall be indoor type manufactured with 14/16 gauge CRCA sheet and is power coated for weather-proff and long lasting finish consisting of microprocessor power command controller, Aluminium busbar with suitable capacity with incoming/ outgoing terminals, indicating lamps for 'Load ON' and 'Self Running' instrument fuses only wired and ferruled, MCCB of suitable rating with overload and short circuit protections, Volt meter, ammeter with selector switches, Frequency meter, energy meter, CTs and 3 Phase indicating lamps, timers etc all as per latest engineering practices etc complete all as specified and directed. (m) Accessories:- (i) 01 No standard mechanical and electrical tool box. (ii) Internal covered tube lights.

-

-

-

... More
(n) Acoustic enclosure : Specially designed to meet CPCB norms 75dBA @ 1mtr at 75% load under free field conditions. The acoustic enclosure is made of CRCA sheets and a structural/ sheet metal base with high quality noise absorbent and fire retardant garde acoustic insulation material (P.U. Form) complying to IS 8183 with two point lifting handles (a) Internal Lighting : Tube lights with protective mesh around it to be fitted inside the container for proper illumination (b) Doors : The enclosure will be provided with suitable doors on the side and reae to enter the enclosure during operation and maintainance. All doors doors will be provided with lock and handles for opening/ closing the doors, retainers for holding the panel door. (p) Painting Scheme ISS shde 220 olive green 1994 or all as per manufacturers specifications (q) Lifting/ Transportation arrangement :- Container with suitable corners will be provided to lift the DG set along with container. This is suitable for road/ rail/ sea transportation (r) Trials :- Trials on site should be given as per load tests prescribed and all functional trials should be shown. Note:- (i) The engine, alternator, Control panel, Acoustic enclosure shall be integrated unit sourced from OEM only as per make given in Sch 'A'.

-

-

-

... More
OUTSOURING, MANNING & OPERATION WORK Outsourcing, manning and operation of AC Plant, stand by DG Set and connected accessories at 2 ASD at Pathankot and 18 FAD at Unchibassi by deployment one Ref Mech (Skilled) (separately at both stations i.e one for Pathankot & one for Unchibassi) operating staff (with relevant experience in the field) for each shift of 08 hours (Three shifts per day) including Sundays & Holidays all as specified and directed by Engineer-in-Charge. (FY-2025-26)

11

-

-

... More
Outsourcing, manning and operation of AC Plant, stand by DG Set and connected accessories at 2 ASD at Pathankot and 18 FAD at Unchibassi by deployment one Ref Mech (Skilled) (separately at both stations i.e one for pathankot & one for Unchibassi) operating staff (with relevant experience in this field) for each shift of 08 hours (Three shifts per day) including Sundays & Holidays all as specified and directed by Engineer-in-Charge. (FY-2026-27)

11

-

-

... More
Outsourcing, manning and operation of AC Plant, stand by DG Set and connected accessories at 2 ASD at Pathankot and 18 FAD at Unchibassi by deployment one Ref Mech (Skilled) (separately at both stations i.e one for pathankot & one for Unchibassi) operating staff (with relevant experience in this field) for each shift of 08 hours (Three shifts per day) including Sundays & Holidays all as specified and directed by Engineer-in-Charge. (FY-2027-28)

11

-

-

... More
Outsourcing, manning and operation of AC Plant, stand by DG Set and connected accessories at 2 ASD at Pathankot and 18 FAD at Unchibassi by deployment one Ref Mech (Skilled) (separately at both stations i.e one for pathankot & one for Unchibassi) operating staff (with relevant experience in this field) for each shift of 08 hours (Three shifts per day) including Sundays & Holidays all as specified and directed by Engineer-in-Charge. (FY-2028-29)

11

-

-

... More
Outsourcing, manning and operation of AC Plant, stand by DG Set and connected accessories at 2 ASD at Pathankot and 18 FAD at Unchibassi by deployment one Ref Mech (Skilled) (separately at both stations i.e one for pathankot & one for Unchibassi) operating staff (with relevant experience in this field) for each shift of 08 hours (Three shifts per day) including Sundays & Holidays all as specified and directed by Engineer-in-Charge. (FY-2029-30)

11

-

-

... More
AMC of Equipments (1st Year) (Location- Pathankot) Comprehensive maintenance for chilling package of (24X4=96 TR) Scroll type refrigeration Compressor with R407C/ R410A refrigerant with Microprocessor panel and suction and Discharge control valves including one annual and three periodical inspection during the contract period at approximately equal intervals by the OEM and the maintenance program will proceed as and when required as per the inspection report provided by company representative and servicing of complete power supply system of the AC Plant including sub panels. Apart from general inspection the bidder shall arrange Descaling of condenser and chiller tubes, Checking leakage of refrigerant and nitrogen pressure testing including nitrogen, Gas (Refrigerant), Temperature sensor, Bellows, Differential pressure switch unit, Expansion Valve, Compressor Oil, Servicing of primary pump, Servicing of chiller water pumps/condenser water pump, Servicing of blowers for AHU's with induction motor, single phasing preventer, electronic timer will be covered under respective items of BOQ. complete all as specified and directed by the Engineer-in-Charge and as mentioned at Srl No. 114.00 and 114.01. Note :- The bidder shall carry out the following maintenance works after completion of maintenance period of the complete project. The rates quoted by the bidder shall include change of spares / Gas as on required basis and as directed by Engineer-in-Charge. The labour for the same shall be included in the quoted rate of item and the rate of the spares shall be taken as quoted by the bidder against the respective item as supply only.

1

-

-

... More
Descaling of 24X4=96 TR (chemical cleaning and physical cleaning) of condenser and chiller tubes all as specified and directed by Engr-in-Charge.

1

-

-

... More
Supply only Gas R410A/ R407C of 24X4 = 96 TR unit forAC Plant complete all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Temperature chilled water sensor/Temperature cooling water sensor of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Bellows as per existing complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only differential pressure switch unit of 24X4=96 TR AC plant complete all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Expansion Valve of AC Plant complete all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Compressor Oil of AC Plant complete all as specified and directed by Engr-in Charge.

1

-

-

... More
M&L for Servicing of Chilled water pump with induction motor replacing of defective parts such as box, mechanical seal , cut off switch, bearings , complete as per site requirement and as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. if found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L for Servicing of blowers for AHU's with induction motor replacing of defective parts such as box, mechanical seal , cut off switch, bearing , complete as per site requirement or as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. if found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L Taking out & rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity upto 20 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & demoisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete.

1

-

-

... More
M&L Taking out & rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity from 20 HP Upto 40 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & demoisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete.

1

-

-

... More
M & L Spray painting to AC plant including motor, piping, Valve, Expansion tank,Hot water generator,LT panels,AHU and other connected accessories incl preparation of surface as per existing colour etc complete all as specified and directed by Eng-in-charge.

1

-

-

... More
S&F Single phasing preventor Type-ESP-2 , 415 Volt, 50 Hz complete as in repair all as specified.

1

-

-

... More
S&F Electronic timer Type-S/D100 , 230/415 Volt, complete as in repair all as specified. Note : In case of any AC Plant breakdown has occurred, the contractor shall take immediate action arrange all necessary material, T & P and labour and the contractor is , unable to provide material and delay in smooth operation/working of AC Plant/AHU etc recovery will be done at the rate of Rs. 500/- per hour.

1

-

-

... More
M&L Servicing of HWG with replacing of defective parts as per site requirement or as directed by Engr-in-charge.

1

-

-

... More
AMC of Equipments (2nd Year) (Location- Pathankot) Comprehensive maintenance for chilling package of (24X4=96 TR) Scroll type refrigeration Compressor with R407C/ R410A refrigerant with Microprocessor panel and suction and Discharge control valves including one annual and three periodical inspection during the contract period at approximately equal intervals by the OEM and the maintenance program will proceed as and when required as per the inspection report provided by company representative and servicing of complete power supply system of the AC Plant including sub panels. Apart from general inspection the bidder shall arrange Descaling of condenser and chiller tubes, Checking leakage of refrigerant and nitrogen pressure testing including nitrogen, Gas (Refrigerant), Temperature sensor, Bellows, Differential pressure switch unit, Expansion Valve, Compressor Oil, Servicing of primary pump, Servicing of chiller water pumps/condenser water pump, Servicing of blowers for AHU's with induction motor, single phasing preventer, electronic timer will be covered under respective items of BOQ. complete all as specified and directed by the Engineer-in-Charge and as mentioned at Srl No. 114.00 and 114.01. Note :- The bidder shall carry out the following maintenance works after completion of maintenance period of the complete project. The rates quoted by the bidder shall include change of spares / Gas as on required basis and as directed by Engineer-in-Charge. The labour for the same shall be included in the quoted rate of item and the rate of the spares shall be taken as quoted by the bidder against the respective item as supply only.

1

-

-

... More
Descaling of 24X4=96 TR (chemical cleaning and physical cleaning) of condenser and chiller tubes all as specified and directed by Engr-in-Charge.

1

-

-

... More
Supply only Gas R410A/ R407C of 24X4 = 96 TR unit for AC Plant complete all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Temperature chilled water sensor/Temperature cooling water sensor of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Bellows as per existing complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Differential pressure switch unit of 24X4=96 TR Ac plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Expansion Valve of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Compressor Oil of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
M&L Servicing of Chilled water pump with induction motor replacing of difective parts such as box, mechanical seal , cut off switch, bearing , complete as per site requirement and as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L Servicing of blowers for AHU's with induction motor replacing of defective parts such as box, mechanical seal , cut off switch, bearing , complete as per site requirement or as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L Taking out & rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity upto 20 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & demoisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete.

1

-

-

... More
M&L Taking out & rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity from 20 HP Upto 40 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & demoisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete.

1

-

-

... More
M & L Spray painting to AC plant including motor, piping, Valve, Expansion tank,Hot water generator,LT panels,AHU and other connected accessories incl preparation of surface as per existing colour etc complete all as specified and directed by Engr-in-charge.

1

-

-

... More
S&F Single phasing preventor Type-ESP-2 , 415 Volt, 50 Hz complete as in repair all as specified.

1

-

-

... More
S&F Electronic timer Type-S/D100 , 230/415 Volt, complete as in repair all as specified. Note : In case of any AC Plant breakdown has occurred, the contractor shall take immediate action arrange all necessary material, T & P and labour and the contractor is , unable to provide material and delay in smooth operation/working of AC Plant/AHU etc recovery will be done at the rate of Rs. 500/- per hour.

1

-

-

... More
M&L Servicing of HWG with replacing of defective parts as per site requirement or as directed by Engr-in-charge.

1

-

-

... More
AMC of Equipments (3rd Year) (Location- Pathankot) Comprehensive maintenance for chilling package of (24X4=96 TR) Scroll type refrigeration Compressor with R407C/ R410A refrigerant with Microprocessor panel and suction and Discharge control valves including one annual and three periodical inspection during the contract period at approximately equal intervals by the OEM and the maintenance program will proceed as and when required as per the inspection report provided by company representative and servicing of complete power supply system of the AC Plant including sub panels. Apart from general inspection the bidder shall arrange Descaling of condenser and chiller tubes, Checking leakage of refrigerant and nitrogen pressure testing including nitrogen, Gas (Refrigerant), Temperature sensor, Bellows, Differential pressure switch unit, Expansion Valve, Compressor Oil, Servicing of primary pump, Servicing of chiller water pumps/condenser water pump, Servicing of blowers for AHU's with induction motor, single phasing preventer, electronic timer will be covered under respective items of BOQ. complete all as specified and directed by the Engineer-in-Charge and as mentioned at Srl No. 114.00 and 114.01. Note :- The bidder shall carry out the following maintenance works after completion of maintenance period of the complete project. The rates quoted by the bidder shall include change of spares / Gas as on required basis and as directed by Engineer-in-Charge. The labour for the same shall be included in the quoted rate of item and the rate of the spares shall be taken as quoted by the bidder against the respective item as supply only.

1

-

-

... More
Descaling of 24X4=96 TR (chemical cleaning and physical cleaning) of condenser and chiller tubes all as specified and directed by Engr-in-Charge.

1

-

-

... More
Supply only Gas R410A/ R407C of 24X4 = 96 TR unit for AC Plant complete all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Temperature chilled water sensor/Temperature cooling water sensor of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Bellows as per existing complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Differential pressure switch unit of 24X4=96 TR Ac plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Expansion Valve of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Compressor Oil of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
M&L Servicing of Chilled water pump with induction motor replacing of difective parts such as box, mechanical seal , cut off switch, bearing , complete as per site requirement and as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L Servicing of blowers for AHU's with induction motor replacing of defective parts such as box, mechanical seal , cut off switch, bearing , complete as per site requirement or as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L Taking out & rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity upto 20 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & demoisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete.

1

-

-

... More
M&L Taking out & rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity from 20 HP Upto 40 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & demoisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete.

1

-

-

... More
M & L Spray painting to AC plant including motor, piping, Valve, Expansion tank,Hot water generator,LT panels,AHU and other connected accessories incl preparation of surface as per existing colour etc complete all as specified and directed by Eng-in-charge.

1

-

-

... More
S&F Single phasing preventor Type-ESP-2 , 415 Volt, 50 Hz complete as in repair all as specified.

1

-

-

... More
S&F Electronic timer Type-S/D100 , 230/415 Volt, complete as in repair all as specified. Note : In case of any AC Plant breakdown has occurred, the contractor shall take immediate action arrange all necessary material, T & P and labour and the contractor is , unable to provide material and delay in smooth operation/working of AC Plant/AHU etc recovery will be done at the rate of Rs. 500/- per hour.

1

-

-

... More
M&L Servicing of HWG with replacing of defective parts as per site requirement or as directed by Engr-in-charge.

1

-

-

... More
AMC of Equipments (1st Year) (Location - Unchibassi) Comprehensive maintenance for chilling package of (52X4=208 TR) Scroll type refrigeration Compressor with R407C/ R410A refrigerant with Microprocessor panel and suction and Discharge control valves including one annual and three periodical inspection during the contract period at approximately equal intervals by the OEM and the maintenance program will proceed as and when required as per the inspection report provided by company representative and servicing of complete power supply system of the AC Plant including sub panels. Apart from general inspection the bidder shall arrange Descaling of condenser and chiller tubes, Checking leakage of refrigerant and nitrogen pressure testing including nitrogen, Gas (Refrigerant), Temperature sensor, Bellows, Differential pressure switch unit, Expansion Valve, Compressor Oil, Servicing of primary pump, Servicing of chiller water pumps/condenser water pump, Servicing of blowers for AHU's with induction motor, single phasing preventer, electronic timer will be covered under respective items of BOQ. complete all as specified and directed by the Engineer-in-Charge and as mentioned at Srl No. 114.00 and 114.01. Note :- The bidder shall carry out the following maintenance works after completion of maintenance period of the complete project. The rates quoted by the bidder shall include change of spares / Gas as on required basis and as directed by Engineer-in-Charge. The labour for the same shall be included in the quoted rate of item and the rate of the spares shall be taken as quoted by the bidder against the respective item as supply only.

1

-

-

... More
Descaling of 52X4=208 TR (chemical cleaning and physical cleaning) of condenser and chiller tubes all as specified and directed by Engr-in-Charge.

1

-

-

... More
Supply only Gas R410A/ R407C of (52X4=208 TR) TR unit for AC Plant complete all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Temperature chilled water sensor/Temperature cooling water sensor of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Bellows as per existing complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Differential pressure switch unit of 52X4=208 TR AC plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Expansion Valve of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Compressor Oil of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
M&L Servicing of chilled water pump with induction motor with replacing of difective parts such as box, mechanical seal , cut off switch, bearing , complete as per site requirement and as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L Servicing of condenser water pump with induction motor with replacing of defective parts such as box, mechanical seal , cut off switch, bearing , complete as per site requirement or as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L Servicing of blowers for AHU's with induction motor with replacing of defective parts such as box, mechanical seal , cut off switch, bearing , complete as per site requirement or as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L Taking out & rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity upto 20 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & demoisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete.

1

-

-

... More
M&L Taking out & rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity from 20 HP Upto 40 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & demoisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete.

1

-

-

... More
M & L Spray painting to AC plant including motor, pipe cooling tower etc on existing colour complete all as specified and directed by Eng-in-charge.

1

-

-

... More
S&F Single phasing preventor Type-ESP-2 , 415 Volt, 50 Hz complete as in repair all as specified. Note : In case of any AC Plant breakdown has occurred, the contractor shall take immediate action arrange all necessary material, T & P and labour and the contractor is , unable to provide material and delay in smooth operation/working of AC Plant/AHU etc recovery will be done at the rate of Rs. 500/- per hour.

1

-

-

... More
S&F Electronic timer Type-S/D100 , 230/415 Volt, complete as in repair all as specified. Note : In case of any AC Plant breakdown has occurred, the contractor shall take immediate action arrange all necessary material, T & P and labour and the contractor is , unable to provide material and delay in smooth operation/working of AC Plant/AHU etc recovery will be done at the rate of Rs. 500/- per hour.

1

-

-

... More
M&L Servicing of HWG with replacing of defective parts as per site requirement or as directed by Engr-in-charge.

1

-

-

... More
AMC of Equipments (2nd Year) (Location - Unchibassi) Comprehensive maintenance for chilling package of (52X4=208 TR) Scroll type refrigeration Compressor with R407C/ R410A refrigerant with Microprocessor panel and suction and Discharge control valves including one annual and three periodical inspection during the contract period at approximately equal intervals by the OEM and the maintenance program will proceed as and when required as per the inspection report provided by company representative and servicing of complete power supply system of the AC Plant including sub panels. Apart from general inspection the bidder shall arrange Descaling of condenser and chiller tubes, Checking leakage of refrigerant and nitrogen pressure testing including nitrogen, Gas (Refrigerant), Temperature sensor, Bellows, Differential pressure switch unit, Expansion Valve, Compressor Oil, Servicing of primary pump, Servicing of chiller water pumps/condenser water pump, Servicing of blowers for AHU's with induction motor, single phasing preventer, electronic timer will be covered under respective items of BOQ. complete all as specified and directed by the Engineer-in-Charge and as mentioned at Srl No. 114.00 and 114.01. Note :- The bidder shall carry out the following maintenance works after completion of maintenance period of the complete project. The rates quoted by the bidder shall include change of spares / Gas as on required basis and as directed by Engineer-in-Charge. The labour for the same shall be included in the quoted rate of item and the rate of the spares shall be taken as quoted by the bidder against the respective item as supply only.

1

-

-

... More
Descaling of 52X4=208 TR (chemical cleaning and physical cleaning) of condenser and chiller tubes all as specified and directed by Engr-in-Charge.

1

-

-

... More
Supply only Gas R410A/ R407C of (52X4=208 TR) TR unit for AC Plant complete all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Temperature chilled water sensor/Temperature cooling water sensor of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Bellows as per existing complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Differential pressure switch unit of 52X4=208 TR AC plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Expansion Valve of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Compressor Oil of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
M&L Servicing of chilled water pump with induction motor with replacing of difective parts such as box, mechanical seal , cut off switch, bearing , complete as per site requirement and as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L Servicing of condenser water pump with induction motor with replacing of defective parts such as box, mechanical seal , cut off switch, bearing , complete as per site requirement or as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L Servicing of blowers for AHU's with induction motor with replacing of defective parts such as box, mechanical seal , cut off switch, bearing , complete as per site requirement or as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L Taking out & rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity upto 20 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & demoisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete.

1

-

-

... More
M&L Taking out & rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity from 20 HP Upto 40 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & demoisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete.

1

-

-

... More
M & L Spray painting to AC plant including motor, pipe cooling tower etc on existing colour complete all as specified and directed by Eng-in-charge.

1

-

-

... More
S&F Single phasing preventor Type-ESP-2 , 415 Volt, 50 Hz complete as in repair all as specified. Note : In case of any AC Plant breakdown has occurred, the contractor shall take immediate action arrange all necessary material, T & P and labour and the contractor is , unable to provide material and delay in smooth operation/working of AC Plant/AHU etc recovery will be done at the rate of Rs. 500/- per hour.

1

-

-

... More
S&F Electronic timer Type-S/D100 , 230/415 Volt, complete as in repair all as specified. Note : In case of any AC Plant breakdown has occurred, the contractor shall take immediate action arrange all necessary material, T & P and labour and the contractor is , unable to provide material and delay in smooth operation/working of AC Plant/AHU etc recovery will be done at the rate of Rs. 500/- per hour.

1

-

-

... More
M&L Servicing of HWG with replacing of defective parts as per site requirement or as directed by Engr-in-charge.

1

-

-

... More
AMC of Equipments (3rd Year) (Location - Unchibassi) Comprehensive maintenance for chilling package of (52X4=208 TR) Scroll type refrigeration Compressor with R407C/ R410A refrigerant with Microprocessor panel and suction and Discharge control valves including one annual and three periodical inspection during the contract period at approximately equal intervals by the OEM and the maintenance program will proceed as and when required as per the inspection report provided by company representative and servicing of complete power supply system of the AC Plant including sub panels. Apart from general inspection the bidder shall arrange Descaling of condenser and chiller tubes, Checking leakage of refrigerant and nitrogen pressure testing including nitrogen, Gas (Refrigerant), Temperature sensor, Bellows, Differential pressure switch unit, Expansion Valve, Compressor Oil, Servicing of primary pump, Servicing of chiller water pumps/condenser water pump, Servicing of blowers for AHU's with induction motor, single phasing preventer, electronic timer will be covered under respective items of BOQ. complete all as specified and directed by the Engineer-in-Charge and as mentioned at Srl No. 114.00 and 114.01. Note :- The bidder shall carry out the following maintenance works after completion of maintenance period of the complete project. The rates quoted by the bidder shall include change of spares / Gas as on required basis and as directed by Engineer-in-Charge. The labour for the same shall be included in the quoted rate of item and the rate of the spares shall be taken as quoted by the bidder against the respective item as supply only.

1

-

-

... More
Descaling of 52X4=208 TR (chemical cleaning and physical cleaning) of condenser and chiller tubes all as specified and directed by Engr-in-Charge.

1

-

-

... More
Supply only Gas R410A/ R407C of (52X4=208 TR) TR unit for AC Plant complete all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Temperature chilled water sensor/Temperature cooling water sensor of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Bellows as per existing complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Differential pressure switch unit of 52X4=208 TR AC plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Expansion Valve of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
Supply only Compressor Oil of AC Plant complete as in repairs all as specified and directed by Engr-in Charge.

1

-

-

... More
M&L Servicing of chilled water pump with induction motor with replacing of difective parts such as box, mechanical seal , cut off switch, bearing , complete as per site requirement and as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L Servicing of condenser water pump with induction motor with replacing of defective parts such as box, mechanical seal , cut off switch, bearing , complete as per site requirement or as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L Servicing of blowers for AHU's with induction motor with replacing of defective parts such as box, mechanical seal , cut off switch, bearing , complete as per site requirement or as directed by Engr-in-charge. NOTES - (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps. (g) Inspect shaft sleeves, shaft, bearings , bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced . (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor without any extra cost.

1

-

-

... More
M&L Taking out & rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity upto 20 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & demoisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete.

1

-

-

... More
M&L Taking out & rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity from 20 HP Upto 40 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & demoisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete.

1

-

-

... More
M & L Spray painting to AC plant including motor, pipe cooling tower etc on existing colour complete all as specified and directed by Eng-in-charge.

1

-

-

... More
S&F Single phasing preventor Type-ESP-2 , 415 Volt, 50 Hz complete as in repair all as specified. Note : In case of any AC Plant breakdown has occurred, the contractor shall take immediate action arrange all necessary material, T & P and labour and the contractor is , unable to provide material and delay in smooth operation/working of AC Plant/AHU etc recovery will be done at the rate of Rs. 500/- per hour.

1

-

-

... More
S&F Electronic timer Type-S/D100 , 230/415 Volt, complete as in repair all as specified. Note : In case of any AC Plant breakdown has occurred, the contractor shall take immediate action arrange all necessary material, T & P and labour and the contractor is , unable to provide material and delay in smooth operation/working of AC Plant/AHU etc recovery will be done at the rate of Rs. 500/- per hour.

1

-

-

... More
M&L Servicing of HWG with replacing of defective parts as per site requirement or as directed by Engr-in-charge.

1

-

-

... More
NOTES FOR ITEM NO(S) 108 to 113 (a) Carry the proper functioning of microprocessor panel and take the control test. (b) Check the electrical panels for tripping, overheating, chattering in electrical parts and terminals for proper tightness. (c) Check for proper working of all Ammeters, voltmeters, Hour mtrs, KWH Mtrs and overload relays, fan belt etc and replacing the same if found unserviceable. (d) Checking the operation of HVAC PANEL and replacing parts if found unserviceable. Proper load balancing should be carried out by the contractor of electric supply system to the chiller machines and necessary arrangements will be carried out for measurement of electric load in all phases by the contractor at no additional cost and the subject report of load in the electrical panel will be submitted at the time of inspection report of the chillers. (e) Clean electrical panels and chiller machine periodically. (f) Check functioning of water flow switch and interlock in the system. (g) Check all safety and operating controls for proper functioning and replace if the same is defective for proper sequence of operation of the machine. (h) All the breakdowns including compressor failure will be attended and the visit shall not be counted in periodical inspection. (i) Check refrigerant filter and drier core, replace the same, if found necessary. (j) Check oil level and oil heater in the system. (k) Check chilled water flow by checking pressure drop across the chiller. (l) Check evaporator and condenser approach and compare the chilled water temperature at full load with the chilled water temperature control. (m) Seasonal adjustment of controls if required and software upgrade. (n) Inspect entire system for any unusual condition such as noise, vibration etc. (o) Supply of electrical parts except electrical spares for incoming panel. (p) All changes/ repair shall be valid only after satisfaction of Engr-in-charge/GE. Contractor shall submit all related documents of expenditure of the contract time to time to avoid delay in payment. (q) Checking the operation of all suction and discharge control valves etc If found faulty /leakage to be replaced by the contractor with out any extra cost. (r) Filling of oil.

-

-

-

... More
(s) The contractor shall arrange required tools for attend routine services/minor breakdown call like an adjustable spanner, clamp meter, pressure gauge with gorging line, digital temperature gun, fix spanner set, Allen key set, screwdriver set, cotton waste software support if required. (t) The contractor shall also arrange required equipment's for attending major breakdown call like as a vacuum pump, Digital Vacuum gauge, Refrigerant recovery unit, Empty refrigerant cylinders, dehydration tank and required spanners. (u) Clean the cooling tower / chiller unit and Drain the water and clean the expansion tank, Clean pot strainer/y-strainer, check the condition of fills, if required, clean the fills with detergent, check for operation of shut off valves. (v) If AC Plants have any breakdown take immediate action and arrange to provide all necessary material, T&P and labour,If the contractor is unable to provide material and delay in smooth operation/working of AC Plant/AHU etc recovery will be done at the rate of Rs.500/- per hour

-

-

-

... More
Excavating over areas, n.exc 1.5 m deep and getting out in any type of soil complete all as specified and directed.

50

-

-

... More
Excavation in trenches in any type of soil n exc 1.5 mtr in width and n.exc 1.5 mtr in depth and getting out all as required for laying of cables, foundation filling of poles or stays complete all as specified and directed.

40.5

-

-

... More
Removing excavated material n.exc 50m and depositing where directed at a level n.exc 1.5m above the starting point complete all as specified and directed.

71.4

-

-

... More
Returning filling in including spreading, leveling, watering and well ramming in layers n.exc 25cm thick all as specified.

19.1

-

-

... More
M&L for good quality dry sand cushioning to underground electric cable on layer of 8 cm thick before laying the cable and second layer of 15 cm thick after laying the cable all as specified in clause 19.75 of MES Schedule part-I (2009).

22.5

-

-

... More
Supply and laying sub class 'B' bricks of old size (230x115x75mm) or of size locally available, laid along alignment of cable as protection to cable in trenches complete all as specified and directed by Engineer-in-Charge.

1600

-

-

... More
Supply and lay in trenches/ on roof/ on wall / steel water tubing galvanized light grade 80mm bore with all fittings complete all as specified and directed by Engr-in-Charge.

10

-

-

... More
M&L PCC 1:4:8 type D-2 using 40mm graded crushed stone aggregate as in foundation filling and mass concrete complete all as specified.

10

-

-

... More
M&L RCC M-25 design mix using 20mm graded aggregate in foundations, including rafts, footings, foundation bearns, plinth beams, bases for columns etc, basement slabs, under-reamed piles and mass concrete complete all as specified and directed.

40

-

-

... More
Formwork to sides of concrete foundations, footings, bases of columns, raft & raft beams, sides & soffits of foundation & plinth beams, and similar work, verticle or to better fair finished surfaces of concrete flat complete.

30

-

-

... More
M&L Mild Steel TMT bars 10mm dia & over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends & binding with & including mild steel wire (annealed) not less than 0.9mm dia or securing with clips quality complete.

1300

-

-

... More
M&L for rendering 5mm thick on fair face of bricks/ complete surface in CM 1:3 finished even and smooth without using extra cement complete all as specified.

10

-

-

... More
M&L for preparation of unpiastered surfaces of walls and applying two coat of cement base paint over a coat of primer on new plastered surface.

10

-

-

... More
Demolition and dismantling works/Credit Works as listed in Schedule 'A' has been attached in tender in PDF format and the amount of Schedule i.e Rs. 777000.00 shall be deducted from the total amount of BOQ to arrive at the contract sum.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.