Military Engineer Services Tender

... More
The MES has issued a formal invitation for competitive bids for the Military Engineer Services project, for Provn Of Roof Top Solar Plants At Bathinda, Faridkot, Lalgarh Jattan, Abohar And Fazilka in Bathinda, Punjab, with an estimated contract value of Rs. 5,09,00,000. The bid opening date for this tender is 05-05-2025 and the last date for bid submission is 11-06-2025. Interested bidders for Military Engineer Services tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Military Engineer Services - MES Tender

Works
Energy, Oil and Gas
Eprocure
Opening Date5 May 2025
Closing Soon11 Jun 2025
Tender Amount₹ 5,09,00,000 
Notes
Download

AI Insights

Class Of Bidder
... View More
The class eligibility requirement to bid or participate in this tender is 'A' class MES contractors.
Technical Capacity
... View More
The required prior work experience for the bidder includes having successfully completed and commissioned Solar Power Plants in Government Department/PSU during the last seven years. The experience criteria are as follows: - One work of capacity not less than 80% of the capacity specified in the NIT, - OR two works of capacity not less than 50% of the capacity specified in the NIT, - OR three works of capacity not less than 40% of the capacity specified in the NIT. The capacity specified for the rooftop Solar PV plant is 840 KWp. The percentages of capacity are given as 80%, 50%, and 40%. No specific amount is mentioned.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
PV modules used in solar power plants/ systems must be designed for their output peak watt capacity, which should as per the MNRE guidelines.

-

-

-

... More
Peak power rating of the module shall not be less than 500 Wp.The module efficiency shall be more than 20 % at standard test condition and the cell should have minimum fill factor of 0.8 with anti reflective coating. It shall be made of high transmittivity glass & front surface shall give high encapsulation gain. Note: Anti dust coating on PV modules shall be done as per OEM specification

-

-

-

... More
The module frame will be made of Hot dip galvanised (Mild Steel) or Aluminium designed to withstand harsh cliamte conditions and wind speed not less than 150 Km / Hr or as per local conditions whichever is higher. The mounting structure shall be as per IS 2062 - 1992, galvanised material shall confirm to latest IS 4759.

-

-

-

... More
Control and Data Acquisition for each of the solar PV plant 10 KWp capacity.

-

-

-

... More
The module shall be provided with a junction box with either provision of external screw terminal connection or sealed type and with arrangement for provision of by-pass diode. The box shall have hinged, weather proof lid with captive screws and cable gland entry points or may be of sealed type and IP 67 rated and IEC 62208.

-

-

-

... More
BALANCE OF SYSTEM (BOS) ITEMS/ COMPONENTS: The BOS items/components of the SPV power plants/systems deployed under this project must conform to the latest edition of IEC or equivalent BIS Standards /MNRE specifications / as specified at Para 2.1 of MINIMAL TECHNICAL REQUIREMENTS/STANDARDS FOR SPV SYSTEMS/PLANTS TO BE DEPLOYED DURING this FY UNDER THE PROGRAMMES OF MINISTRY OF NEW AND RENEWABLE ENERGY available on MNRE website

-

-

-

... More
INVERTER: Supply, Installation, Testing & commissioning solar inverter (confirming to IEC 61683 and IS 61683) of suitable capacity to ensure AC output as above but not less than 3 in numbers microprocessor based with cumulative capacity as per OEM having following specifications with remote monitoring system . i)Ambient temp : 4° C to 60° C ii)Relative humidity : 0-100 % non condensing iii)Environmental condition: outdoor, Hot / wet location iv)Protection degree : IP-65 v)Pollution degree : IV vi)Safety class : class I metal enclosure vii) blank viii)No. of inputs minimum 4 nos MC4 ix)Frequency rated : 50 Hz x)Total Harmonic distortion shall be less than 3% xi)Power factor shall be more than 95% at any load /time. xii) Inverter Efficiency >93% (In case of 10 KW or above with inbuilt galvanic isolation) >97% (In case of 10 KW or above without inbuilt galvanic isolation) >90% (In case of less than10 KW) xiii) External communication: RS-485 Port xiv) Grid frequency Tolerance range +3 or more xv) No load losses less than 1% xvi) Protection against DG set run & grid isolation Note:- Inverter shall be capable of synchronisation with grid supply and DG Set supply

-

-

-

... More
Protection features- Inverter should have following protections (i) Anti islanding (ii) Over voltage protection (iii) Over current protection (iv) Over temperature protection (v) Reverse polarity Protection (vi) Surge protection (vii) Short Circuit (viii) Frequency

-

-

-

... More
A data logging system for plant shall be provided.-To measure the Solar Irradiance an integrating sensor (Pyranometer) mounted in the plane of the array. Read out should be integrated with data logging system.-Wind Speed:An integrated wind speed measurement unit be provided.-Temperature Sensor : Integrated temp, sensors for measuring the module surface temp., inverter inside enclosure temp,and ambient temp to be provided complete with read outs integrated with the data logging system. Note-SCADA system for monitoring of following data through web based application with cloud storage minimum 6 months: (i) Solar irradiance (ii) Wind speed, (iii) Ambient temperature (iv) Module surface temp (v) Generation data KWh (per inverter and cumulative) (vi) Instantaneous generation in KW (Each invertor and cummulative) Suitable HMI/Graphs depicting above data shall be readily available for a period through this application. Note: (i) Specification for Pyranometer, Surge arresting device and anemometer should be selected as per OEM recommendation.

-

-

-

... More
COMBINER BOXES & ELECTRICAL PANEL-Combiner box & LT distribution electrical panel with suitable Incoming and outgoing breakers as per the design of inverter and array structure incl bus bar of size 1.8 times the rated current from the inverters.Incoming and outgoing MCCBs should be of suitable capacity. Note-Platform for the panel with PCC 1:4:8 type D-2 with 40 mm graded crushed stone, 15 cm thick in foundation, brick work in CM 1:6 with sub class 'B', old size bricks, rendering 15 mm thick in CM 1:6 on exposed surfaces and 100 mm thick PCC padding 1:3:6, type C-1 using 20 mm graded crushed stone aggregate on top and grouting bolts etc for panel.

-

-

-

... More
Cables and wires (confirm IEC-60227/ IS 694, IEC 60502-IS 1554) Standard) - (i) For the DC cabling, XLPE insulated and sheathed, UV-stabilized single core flexible copper cables shall be used; Multi-core cables shall not be used. (ii) For the AC cabling, XLPE insulated and PVC sheathed single or, multi-core flexible Aluminium cables shall be used; Outdoor AC cables shall have a UV-stabilized outer sheath. (iii) The total voltage drop on the cable segments from the solar PV modules to the solar grid inverter shall not exceed 2.0% (iv)The total voltage drop on the cable segments from the solar grid inverter to the building distribution board shall not exceed 1% (v)All DC and AC cables from the SPV module and Inverter shall run through a Pre-Galvanized aluminium cable raceway of height not less than 40 mm and width not less than 50 mm. (vi) Cables and wires used for the interconnection of solar PV modules shall be provided with solar PV connectors (MC4) and couplers. (vii) All cable raceways shall be clamped to the rooftop, walls and ceilings with clamps at intervals not exceeding 50 cm

-

-

-

... More
Lightning protection- There shall be the required number of suitable lightning arrestors installed (Horn Gap type or equiv) (As per Design to be submitted by contractor ) confirming IEC 62305 standard.

-

-

-

... More
EARTHING PROTECTION- Earthing complete with Copper earth plate electrode of size 60cmx60cmx3 mm thick, buried directly in ground (earth pit not less than 2.25 m below normal ground level).The execution of the said job should follow the instructiins shown in electrical plate No 3 of SSR Part I and as per latest ammendement of IS 3043.

-

-

-

... More
METERING ARRANGEMENTS: (A) Suitable metering arrangements with recording facility shall be provided.The metering arrangements must have feature to measure and record, (i)Parameters of KW,KWh,KVAR,voltage,current,PF and any other metering required to determine efficiency and efficacy of the system. (B)LT 3 Phase 4 Wire Electronic Tri vector Meter with (i) Standard: IS 13779:1999 / CBIP 88 (ii) Accuracy: Class 0.5 (iii) Reference Voltage - 3x240 V (iv) Basic Current (Ib) - 5 A (v) Maximum continuous current (Imax) - 10 A (vi) Rated Frequency (variation) - 50Hz (±5%) (vii) Power consumption:- Voltage circuit: Less than 1.5 W and 10 VA per Phase at reference voltage, reference temperature and reference frequency Current circuit: Less than 1 VA per phase at basic current, reference frequency and reference temperature (viii) Display type: 8 digit 7 segment backlit LCD display, not less than10 mm character height (ix) Display in the event of Power Failure: Internal battery back-up for LCD display (x)Communication port: Galvanically isolated Optical Communication port for data transfer through either CMRI or remote device or both is provided with RS 485 for DLMS protocol

-

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be, for each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1760 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 640 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 360 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 360 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 240 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 1st year after date of completion Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 2nd year after date of completion of 1st year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 3rd year after date of completion of 2nd year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 4th year after date of completion of 3rd year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 5th year after date of completion of 4th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 6th year after date of completion of 5th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 7th year after date of completion of 6th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 8th year after date of completion of 7th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 9th year after date of completion of 8th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 10th year after date of completion of 9th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 11th year after date of completion of 10th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 12th year after date of completion of 11th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 13th year after date of completion of 12th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 14th year after date of completion of 13th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 15th year after date of completion of 14th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 16th year after date of completion of 15th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 17th year after date of completion of 16th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 18th year after date of completion of 17th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 19th year after date of completion of 18th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Operation and Comprehensive Maintenance incluiding making good of all kind of defects by repair/replacement of required spare parts as the case may be,for under HQ CEBZ each of capacity i.e. (a) 440 KWp at Bathinda Mil Stn should generate minimum output of 1584 units (KWHr)/ day (b) 160 KWp at Faridkot Mil Stn should generate minimum output of 576 units (KWHr) / day. (c) 90 KWp at Lalgarh Jattan Mil Stn should generate minimum output of 324 units (KWHr)/ day. (d) 90 KWp at Abohar Mil Stn should generate minimum output of 324 units (KWHr) /day. (e) 60 KW at Fazilka Mil Stn should generate minimum output of 216 units (KWHr) / day Complex under HQ CE Bathinda Zone all as specified and directed for period of 20th year after date of completion of 19th year AMC period Scope of work:- (a) Operation and maintenance shall include washing / cleaning of Solar PV Modules fortnightly. (b) Checking Electrical Parameter of the installed power plant.

1

-

-

... More
Note for Item Ser no 02 to 21:- (i) Minimum Performance ratio during the period of Operation and maintenance shall not be less than 80 % on quarterly basis according to the data obtained from SCADA (ii) The contractor shall submit SPV generation data along with the radiation data in Excel sheet format on quarterly basis . The module cleaning must be done on fortnightly basis as per direction of Engr-in-Charge.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.