Military Engineer Services Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 90,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MES_669187_2Bid Award Id
ViewTender No
CWE/FZR-23/2024-25Tender Authority
Military Engineer Services ViewPurchaser Address
-Website
http://http://mes.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
All as per ser item No 1 here-in-before here-in-before but replacement of unsv drawers with 2 Nos Telescopic channel including CP handle of table computer, Rest all as per shown on drawing acomplete all as specified and as directed by Engineer-in-Charge.
30
-
-
All as per ser item No 1 here-in-before but Telescopic Channel 1 mm thick for Key board tray of Table computer , Rest all as per shown on drawing complete all as specified and as directed by Engineer-in-Charge.
28
-
-
All as per ser item No 1 here-in-before but Key board Tray of Table computer , Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
36
-
-
All as per ser item No 1 here-in-before but legs with nylone Buffer of Table computer , Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
98
-
-
TV Trolly (FD/E6/MAP/ 04 (R)
Supply & fixing in replacement of unsv top/bottom made out of 18mm thick prelaminated particle board exterior quality with PVC edging / teak wood all round the Top/Bottom of TV Trolly including dismantling of unsv components all as specified shown on drg. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
36
-
-
All as per Ser item No. 8 here-in-before but replacement of unsv side wall, Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
35
-
-
All as per Ser item No. 8 here-in-before but replacement of unsv rear wall, Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
30
-
-
All as per item No. 8 here-in-before but replacement of broken 5.5mm thick black colour glass with 02 Nos Stainaless steel Hinges fitting, 02 Nos magnatice catcher and brass handle. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
44
-
-
All as per Ser item No. 8 here-in-before but replacement CP Handle complete all as specified and as directed by Engineer-in-Charge.
50
-
-
Replacement of nylon coaster wheels of TV Trolly as shown on drawing, complete all as specified and as directed by Engineer-in-Charge. Drg. No. (FD/E6/MAP/4 (R)
170
-
-
Table dressing ladies (FD-378, FD/MAP-II/07) :- Supply & fixing of the following components/parts of table dressing ladies including dismantling unserviceable components all as specified and shown on drawing. replacement of unserviceable looking mirror 5mm thick alongwith frame including one coat fench polish on the frame all as per shown on drawing complete all as specified and as directed by Engineer-in-Charge.
58
-
-
Supply & fixing of the following components/parts of table dressing ladies including dismantling. Replacement of unsv top/bottom made out of 18mm thick prelaminated particle board exterior quality with PVC edging / teak wood all round the Top/Bottom of Table dressing ladies including dismantling of unsv components all as specified shown on drg. No. (FD-378, FD/MAP-II/07). Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
61
-
-
All as per item No.15 here-in-before but replacement of unsv centre Top including teak wood supporting Stiffner of Table dressing ladies , Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
35
-
-
All as per item No.15 here-in-before but replacement of unsv Back portion of Table dressing ladies , Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
41
-
-
All as per item No.15 here-in-before but replacement of unsv side portion (inner/outer) of Table dressing ladies , Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
51
-
-
All as per item No.15 here-in-before but replacement of unsv drawer with 02 Nos telescopic channel, 01 Nos CP Handle and supporting stiffner of Table dressing ladies , Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
37
-
-
All as per item No.15 here-in-before but replacement of front shutter with 02 Nos SS hinges, 01 Nos CP handal and 01 Nos magnatic catcher. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
40
-
-
All as per Ser item No. 15 here-in-before but Front /side wall part with 02 Nos stainless steel corner plate of dressing stool of table dressing ladies. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
41
-
-
All as per Ser item No. 15 here-in-before but top portion dressing stool including all round 25mm Teak wood runner. Top should be 12mm thick plywood, Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
42
-
-
All as per Ser item No. 15 here-in-before but bottom portion dressing stool. Bottom should be 12 mm thick plywood, Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
34
-
-
All as per Ser item No. 15 here-in-before but back portion dressing stool. Back should be 12 mm thick plywood, Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
33
-
-
All as per Ser item No. 15 here-in-before but heavy duty revolving nylon double wheels best quality. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
60
-
-
All as per Ser item No. 15 here-in-before but Foam cushion 75 mm thick 40 density covered with tapestry cloth including stiching complete. Rate of tepestry cloth shall not less than Rs. 110/- per meter, quality and colour approved by GE complete all as specified and as directed by Engineer-in-Charge.
76
-
-
Chair Computer (FD/E6/MAP/01) Supply & fixing as in replacement of unserviceable seat & back of chair computer. Foam cushion of chair computer will be 75mm thick 40 density covered with tapestry cloth of approved quality. 12mm thick Ply wood will be BWR grade ISI marked. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.. Make of foam : Sleep well/Kurlon foam/Feather foam. Note :- Rate of Tapestry cloth will be not less than Rs.150/- meter, quality and colour approved by GE
46
-
-
All as per ser item No 27 here-in-before but new armrest of Chair computer, made of black integral skin polyurethane reinforced. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
45
-
-
All as per ser item No 27 here-in-before but new Gas lift Mechanism best quality with 100mm stroke length and Gas pressure 300n force of chair computer. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
28
-
-
All as per ser item No 27 here-in-before but new pedestal Assy of size 700mm with 05 Nos of nylon twin coaster wheels of Chair Computer. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
32
-
-
All as per ser item No 27 here-in-before but new twin wheel nylon coaster wheels of chair computer as shown on drawing, complete all as specified and as directed by Engineer-in-Charge.
190
-
-
Chair Writing MAP (FD/E6/MAP/12) Taking down unserviceable seat & back of chair writing MAP and Supply & fixing Foam cushion covered with Rexine cloth sheet duly stitching of chair computer. Foam cushion will be 75mm thick 40 density and Rexine cloth sheet of approved quality. Make of foam :- Sleep well/Kurlon foam/Feather foam. Ply wood will be BWR grade ISI marked. Rest all as shown on drg and complete all as specified and as directed by Engineer-in-Charge. Note :- Rate of Rexine cloth sheet will be not less than Rs.150/- meter, quality and colour approved by GE
88
-
-
Supply and fixing of armrest made of black integral skin polyurethane reinforced of Chair Writing in replacement of unsv armrest. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
86
-
-
Supply and fixing of Powder coated MS Tubular frame made out of 25mmx10mm of Chair Writing in replacement of unsv MS Tubular frame. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
48
-
-
Bin Linen Multipurpose (FD/E6/MAP/09)
Supply & fixing of the following components/parts of Bin Linen Multipurpose including dismantling of unserviceable components all as specified and shown in drawings. Taking down UNSV the top/ Bottom and S&F new Top/Bottom of Bin Linen Multipurpose, made of 18/19 mm thick prelaminated particle board of teak shade including 4 mm thick Teak wood beading all round the top with one coat french polish on beading complete. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
46
-
-
All as per ser item No 35 here-in-before but shutter both side left & right made of prelaminated particle board sheesam face with 4 mm Teak wood beading with one coat french polish on beading. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
28
-
-
All as per ser item No 35 here-in-before but Side portion made of 18mm thick prelaminated particle board sheesam face with 4 mm Teak wood beading with one coat french polish on beading. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
27
-
-
All as per ser item No 35 here-in-before but drawer of Bin linen multipurpose with CP handle. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
28
-
-
All as per ser item No 35 here-in-before but back ply wood 12 mm thick BWR grade. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
27
-
-
All as per ser item No 35 here-in-before but Hardwood stiffner all round of the bottom portion. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge..
38
-
-
All as per ser item No 35 here-in-before but CP Handle of drawer. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
78
-
-
M& L for French polish to Bin Linen Multipurpose portion exposed to direct vision of wooden component/parts, Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
52
-
-
Desk(FD-1021)
Supply & fixing of the following components/parts of Desk including dismantling of unserviceable components all as specified and shown in drawings. Taking down UNSV the top and S&F new Top of Desk, made of 18/19 mm thick prelaminated particle board of teak shade including 4 mm thick Teak wood beading all round the top with one coat french polish on beading complete. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
60
-
-
All as per ser item No 43 here-in-before but bottom portion made of 18mm thick prelaminated particle board sheesam face with 4 mm Teak wood beading with one coat french polish on beading. Rest all as per shown on drawing and complete all as specified and directed.
60
-
-
All as per ser item No 43 here-in-before but Side portion made of 18mm thick prelaminated particle board sheesam face with 4 mm Teak wood beading with one coat french polish on beading. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
88
-
-
All as per ser item No 43 here-in-before but Rear portion made of 18mm thick prelaminated particle board sheesam face with 4 mm Teak wood beading with one coat french polish on beading. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
58
-
-
Preparing all steel surface before painting and apply one coat of painting to all steel portion of Desk. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
65
-
-
CHAIR DINING OFFICER (FD/MAP-II/04)
Supply and fixing in replacement of unserviceable Front leg of Chair Dining Officer using 1st class seasoned hard wood sheesham free from knots and defects with one coat french polish including dismantling of unsv components/parts complete all as specified and shown on drawing as complete all as specified and as directed by Engineer-in-Charge.
82
-
-
All as per Ser item No. 48 here-in-before but Rear leg
69
-
-
All as per Ser item No. 48 here-in-before but side rail.
66
-
-
All as per Ser item No. 48 here-in-before but Front/back rail.
63
-
-
All as per Ser item No. 48 here-in-before but stiffener 'H' type.
85
-
-
All as per Ser item No. 48 here-in-before but S&F tapestry cloth on seat cushion Note :- Rate of Tapestry cloth will be not less than Rs.120/- meter, quality and colour approved by GE
360
-
-
All as per Ser item No. 48 here-in-before but S& F of Foam cushion 75 mm thick and 32 density Note :- Rate of foam shall not less than Rs.120/- Sqrft. :- Make of foam Sleep well/Kurlon foam/Feather foam) quality and colour approved by GE.
322
-
-
Taking out UNSV ply of seat and Supply and fix new 12mm thick commercial ply of seat of chair dining Officer cushioned. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
162
-
-
Supply and fix of sheesham wood triangular support with nails to strengthen of chair dining cushion complete all as specified and as directed by Engineer-in-Charge.
1400
-
-
CUSHION & COVER FOR SOFA SET (FD/MAP-II/02, FD-281, FD-373)
Supply & fixing in replacement of unsv foam cushion of sofa set of 4/5 seated and couch CB 550x525x100mm 40 density covered with tapestry cloth of approved quality. Rate of Tapestry cloth shall not less than Rs.120/- meter, quality and colour approved by GE. Make of foam Sleep well/Kurlon foam/Feather foam.
360
-
-
Supply & fixing in replacement of unsv cover of foam cushion suitable for 550x525x 100mm thick cushion. Tapestry cloth of approved quality. Rest all as per shown on drawing and complete all as specified and directed. Rate of Tapestry cloth shall not less than Rs.120/- meter, quality and colour approved by GE.
390
-
-
Charpoy GI pipe (FD-220) :
Removing of old unsv newar from charpoy GI pipe and supply and fixing new 12 mm thick plywood BWR grade ISI Marked with 75 mm long x 6 mm dia full threaded nut and bolts with washer by drilling 2 Nos of hole in long rail and 2 Nos of hole on short rails including supply and fixing 02 Nos new iron strip of size 900x30x5 mm thick duly welded with two coats of black paint on long rails below ply wood top. Corners of plywood fixed on charpoy should be rounded off properly complete all as specified and as directed by Engineer-in-Charge.
506
-
-
Removal of unsv long rail from existing frame of charpoy of GI pipe FD-220 and supply and fixing of new long rail made out of GI pipe 32mm nominal bore medium grade ISI marked all as specified and shown on drawing, complete all as specified and as directed by Engineer-in-Charge.
180
-
-
Removal of unsv short rail from exiting frame of charpoy of GI pipe and fixing of short rail made from unsv long rail retrieved from charpoy GI pipe against Ser No. 60 here-in-before after cutting threading of both ends to the requires size complete all as specified and as directed by Engineer-in-Charge.
360
-
-
Removal of unsv leg from existing frame of charpoy GI pipe and fixing legs by making from unsv short rail retrieved from charpoy GI pipe as per item No 61 here-in-before including cutting threading complete and providing best quality PVC shoe to the legs of charpoy GI pipe . Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
360
-
-
Removal of unsv elbow three way 32mm bore from existing frame of Charpoy GI pipe FD-220 and supply and fixing new elbow GI three way32mm bore medium grade ISI marked all specified and shown on drawing complete all as specified and as directed by Engineer-in-Charge.
182
-
-
Removal of unsv check nuts from existing frame of charpoy GI pipe & supply and fixing new check nuts GI 32mm bore medium grade ISI marked all specified and shown on drawing FD-220, complete all as specified and as directed by Engineer-in-Charge.
159
-
-
Tightening of charpoy GI frame complete all as per drawing, complete all as specified and as directed by Engineer-in-Charge.
210
-
-
Welding of FMN clamps and iron strip of charpoy GI pipe all as per drawing complete all as specified and directed. Note : Welding in rapair not exceeding 2.5cm in length and thickness of metal to be welded not exceeding 6mm.
410
-
-
RACK SHOE STEEL (FD/E6/MAP/2(R)
Supply & fixing new 25mm dia 18guage thick MS pipe including necessary denting, repairing, turning, welding in replacement of unsv pipe of Rack Shoe steel. Rest all shown in drawing and complete all as specified and as directed by Engineer-in-Charge.
48
-
-
All as per Ser item No. 67 here-in-before but taking out UNSV Jali with frame and S&F new Jali with frame including necessary denting, repairing, welding complete. Jali should be 3mm dia 09 Nos and frame 19mm dia 18 Guage thick. Rest all as per shown on drawing and complete all as specified and as directed by Engineer-in-Charge.
45
-
-
All as per item ser No 67.here-in-before but painting to Rack Shoe Steel MAP (FD/E6/MAP/2® complete all as specified and as directed by Engineer-in-Charge.
60
-
-
CHAIR SCHOOL WITH HAND BOARD
Supply & fixing 18 mm thick pre laminated particle board top including 25 mm hollow steel pipe inserted in 20 mm MS rod welded to frame openable with PVC edging (Hinged on RHS) screwed to as in replacement of chiar school with hand board including dimantling of unsv components/parts complete all as specified and shown on drg ascomplete all as specified and as directed by Engineer-in-Charge.
166
-
-
All as per Ser item No. 70 here-in-before but of moulded one piece PVC Seat & Back complete all as specified and as directed by Engineer-in-Charge.
151
-
-
All as per ser item No 70 here-in-before but welding to Chair School with hand board complete all as specified and as directed by Engineer-in-Charge.. Note : Welding in rapair not exceeding 2.5cm in length and thickness of metal to be welded not exceeding 6mm.
230
-
-
M& L Preparation of old steel surface of chair school with hand board and applying one coat of black Japan paint complete all as specified and as directed by Engineer-in-Charge.
166
-
-
Side Board
Supply & fixing of the following components/parts of side board including dismantling of unserviceable components all as specified and shown in drawings.(FD-241,371,372,1112). Taking down UNSV the top/ Bottom and S&F new Top/Bottom of side board, made of 18/19 mm thick prelaminated particle board of teak shade including 4 mm thick Teak wood beading all round the top with one coat french polish on beading complete. Rest all shown in drawing and complete all as specified and as directed by Engineer-in-Charge.
42
-
-
All as per ser item No 74 here-in-before but shutter both side left & right made of prelaminated particle board sheesam face with 4 mm Teak wood beading with one coat french polish on beading as complete all as specified and as directed by Engineer-in-Charge.
36
-
-
All as per ser item No 74 here-in-before but drawer with CP Handle all as shown in drawings and complete all as specified and as directed by Engineer-in-Charge.
35
-
-
All as per ser item No 74 here-in-before but back ply wood 6 mm thick BWR grade all as shown in drawings and complete all as specified and as directed by Engineer-in-Charge.
36
-
-
All as per ser item No 74 here-in-before but matalic knob by CP Handle as per complete all as specified and as directed by Engineer-in-Charge.
190
-
-
All as per ser item No 74 here-in-before but side portion of side board. Rest all as show in drg and complete all as specified and as directed by Engineer-in-Charge.
34
-
-
M& L for French polish to side board portion exposed to direct vision of wooden component/parts rest all as per complete all as specified and as directed by Engineer-in-Charge.
42
-
-
Receptacle PVC (FD/E6/MAP/13)
48
-
-
Almirah Med Steel W/S (FD-1032)
22
-
-
Chair Computer (FD/E6/MAP/01)
12
-
-
Almirah Large steel W/S (FD-1031)
14
-
-
Bed Side Locker steel (FD-1029)
11
-
-
Almirah med steel1/2 H x 1/2S (FD-1034)
50
-
-
Bin multi purpose (FD/E6/MAP/09)
53
-
-
Chair dining FD-279
255
-
-
Chair Easy (FD-229)
70
-
-
Table 3x2 w/drawer (FD-283)
18
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements