Water Resources Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_CEBMT_73657_2Bid Award Id
ViewTender No
e- Procurement Notice No 14/2021-22Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://www.dowrodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 5.00Km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5cm. layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes of all heights including construction,maintenance,watering and lighting of haul road including cost of royality , labour cess, etc. complete as per the direction of Engineer-in-Charge
3352
-
147.2
... More
Watering Earthwork upto OMC condition and compaction by sheep foot rollers and dozer in layers not exceeding 22.5cm to 95% dry density including hire and running charges of all the machineries complete as per the direction of Engineer-in-Charge ( Measurement to be taken on the finished compacted section of the fill under OMC condition)
2677
-
30.4
... More
Fine dressing and turfing slope of the earth embankment with approved quality of compact dub grass including collection and supplying the same from approved site, including conveyancee charges, royality and other taxes on all materials , with five extra leads , and initial lifts and as per the approved design , drawings , specifications and as per the direction of Engineer-in-charge.
471.6
-
20.7
... More
Rough stone dry packing in approns and revetments with Hard granite stone of 15 Cm to 30Cm sizes including loading , unloading , cost , conveyance, royality and all other taxes with all leads, lifts rock of regular approve size and filling into the interstices with wedge stone as per approved design drawing, specification in design slope in approns and revetment as directed by the Engineer in charge including quality control test charges , supplying of all machinaries materials T & P labour and supervision charges etc complete.
204.36
-
1207
... More
Earth work in excavation of foundation in hard soil or gravelly soil with in initial lead and lift of 50mts and 1.5mts respectively including dressing and levelling the bed and depositing the excavated earth at place away from the work site with all leads and lifts including cost of all labour, T&P and dewatering if required for the work etc; complete and as per specification and direction of Engineer-in-Charge.
459.81
-
184.6
... More
Filling in foudation & plinth with sand well watered and rammed including cost, conveyance , and royality of all materials etc. complete as per direction by the Engineer-in-Charge.
35.37
-
382.6
... More
Cement concrete M15 with 20 mm size down graded hard granite chips of approved quality free from skin and weathered surface and foreign materials , mixed in concrete mixer including cost, conveyance, royalty and taxes of labour, materials & machineries to the work site with all leads, lifts and delifts upto any height by any hoisting device for hoisting and placement in position to proper grade and profile including vibrating by mechanical means for proper consolidation and curing for 21 days with dewatering and cleaning old surface as per specification before laying fresh concrete etc. complete as per direction of Engineer-in-charge including mobilisation & demobilisation of men, materials and machineries etc. and providing illumination, if required, including clearance of slush and muck before handing over etc. as directed by the Engineer-in-charge.
381.87
-
4001.6
... More
C.C(1:2:4) with 12mm size CBHG chips including cost ,carrige & royalty etc.complet as per direction of Engineer-in-Charge
7.86
-
6138.5
... More
Rigid and smooth centering and shutering for RCC Works and dismantling them after casting including cost of materials complete in Base concrete as directed by the Engineer-in-charge.
659.75
-
101.7
... More
Providing weep holes in Brick masonary/plain/ R.C.abutment, wing wall/return wall with 100mm.dia A.C.pipe extending through the full width of the structures with slope of 1V:20H towards drawing face etc.with cost, all labour T&P cost,carriage,royality and all other taxes of all required materials to complete the item of work in all respect as per the direction of the Engineer-in-charge.
51.7
-
153.8
... More
Filling in foudation & plinth with excatated materials including watering and ramming etc. complete as per direction by the Engineer-in-Charge.
153.27
-
102.6
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements