Rural Water Supply And Sanitation Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 14,732Document Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_RWSS_68195_52Bid Award Id
ViewTender No
BID 02 of 2021 - 22Tender Authority
Rural Water Supply And Sanitation Department ViewPurchaser Address
-Website
http://https://rayagada.nic.in/rural-water-supply-sanitation/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
(D) 4th depth of 1.50mtr.(upto 6.00 mtr.)
85.07
-
771.05
... More
Supplying of all labour,T & P, materials for cutting in D.I rock not requireing blasting to be removed by pickaxe and crowbars & depositing materials within initial lead & lift including rough dressing & levelling the bed as per the direction of Engineer in Charge. (E) 5th depth of 1.50mtr.(upto 7.50 mtr.)
66.23
-
1469.78
... More
(F) 6th depth of 1.50mtr.(upto 8.50 mtr.)
44.16
-
1718.42
... More
Supplying of all labour,T & P, materials etc. for Rough Dry RRHG stone masonary in wall of open Well including all cost, conveyance, royalty, taxes etc. all to complete and as per the direction of the Engineer-in-Charge.
43.16
-
1456.97
... More
Supplying of all labour T & P matrials for filling 25 mm chips around dry stone masonary walls including all cost, coveyance royalty taxes etc. all complete.
16.27
-
1492.2
... More
Supplying of all labour,T & P, materials, taxes etc. for Rigid and Smooth Centering and Shuttering for RCC works including false works and dismantling them after casting including cost of materials to complete in ground floor and as per the direction of the Engineer-in-Charge. A- RCC Coloum & Beam
50.01
-
821.32
... More
B- RCC Wall
261.12
-
828.76
... More
Supplying of all labour,T & P, materials,taxes etc. for supplying, fitting and placing uncoated HYSD bar reinforcement to complete as per drawing and technical specification for R.C.C. works and as per the direction of the Engineer-in-Charge.
39
-
6579.79
... More
Supplying of all labour,T & P, materials etc. for Cement Concrete (1:1.5:3) with 12 mm size broken hard granite chips for RCC work including hoisting, laying nd all cost, conveyance, royalty,taxes etc. all to complete and as per the direction of the Engineer-in-Charge.
64.85
-
7024.47
... More
Providing all labour T&P etc for Refilling in foundation and plinth with excaveted earth or materials,taxes etc. all complete and as per the direction of Engineer In Charge.
187.88
-
76.7
... More
Supplying of all labour,T & P, materials etc for hire charges of disel pump with disel, consumable,operator etc all complete and as per the direction of the Engineer-in-Charge.(To be paid as per actuals.)
430
-
59
... More
providing all labour T & P etc for trial bore by DTH Rig at site including all consumable , operator etc all completed ( to be paid actual )
60
-
480
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements