Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 1,37,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tender For Execution Of Rural Piped Water Supply.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_RWSS_51439_5Bid Award Id
ViewTender No
RWSS DIVISION PURI 66 OF 2018-19Tender Authority
Rural Water Supply And Sanitation Department ViewPurchaser Address
-Website
http://https://rayagada.nic.in/rural-water-supply-sanitation/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supplying all materials, labour, T&P for Electrical installation of 3phase power internal wiring of power supply connection to switch room as per detailed scope of work & technical specification, quantity of work in Section-5 & in Annexure - D (including all taxes but excluding GST)
1
-
32018
Supplying all materials, labour, T&P for SUPPLY OF SUBMERSIBLE PUMPSET, CONTROL PANNEL BOARD, FLAT CABLE & ARMOURED CABLE RUBBER MAT,LOWERING OF PUMP & MOTOR ETC. as per detailed scope of work & technical specification, quantity of work in Section-5 & in Annexure - E (including all taxes but excluding GST)
1
-
106174
Supplying all materials, labour, T&P for MS /GI Work ( both Head Works Site & Distribution Site) as per detailed scope of work & technical specification, quantity of work in Section-5 & in Annexure - F (including all taxes but excluding GST)
1
-
147513
Supplying all materials, labour, T&P for Treatment Unit as per detailed scope of work & technical specification, quantity of work in Section-5 & in Annexure - G (including all taxes but excluding GST)
1
-
40000
Supplying all materials, labour, T&P for Distribution System etc. as per detailed scope of work & technical specification, quantity of work in Section-5 & in Annexure - H (including all taxes but excluding GST)
1
-
8252081
Construction of 1,50,000 Ltr Capacity RCC ESR with 15 mtr staging with RCC Stair Case -
Supplying of all labour,T&P,material for soil testing , design, drawing , construction, errection, testing & commissioning of 150,000 ltrs capacity with 15 mtr staging RCC elevated storage reservoir including supply & fixing of 150mm GI Pipe for in-let & 100mm GI pipe for out-let, over flow & washing line of required length, supply & fixing of 100mm dia sluice valve-3 nos,150 mm dia SV-1No,150mm NRV-1 no.with construction of valve chamber-4 nos(For 80mm to 200mm dia SV/NRV),providing RCC stair case from bottom to top, 32mm dia G.I hand rail in stair case, around dome and landing etc. and stainless steel ladder inside & Alluminium ladder out-side of the ESR, lightening arrester confirming to IS specification, digital water level indicator, 4 Nos of required dia CI puddle collar, 0.6 m dia CI manhole cover at dome of two nos , RCC vent with M.S. jally, M.S. Ventilator, M.S. door with painting, M.S Window with painting etc. complete as per direction of the Engineer - in- Charge. (The contractor shall execute the work after preparing the design and detail drawing in 5 sets from qualified engineer and to approve all structural design & drawing from State Technical Agency(STA) IGIT, Saranga/ CET, BBSR/ VSSUI, Burla/ NIT, Rourkela/ IIT, BBSR at his own cost). as specified in Annexure - I (including all taxes but excluding GST)
1
-
3420621
Annual maintainance cost for 5 calender years from the completion date of defective liability period (1%) - The contractor shall maintain the PWS project for Five (5) calendar years from the completion date of defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hour/day without facing any problem.The contractor shall repair and replace any types of defect arise within 24 hr of receipt of complaint either from public or from Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN & technical specification mentioned in Section-5 Annexure-J
1
-
652982