Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Rural Development Department - RDD Tender

Eprocure
Opening Date10 Dec 2021
Closing Date15 Dec 2021
Tender Amount₹ 4,84,77,000 
Notes
Download

Costs

Summary

Construction And Maintenance Of Impvt. To Talchua To Ahirajpur Road. For The Year 2021-22.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE

21.05

-

279.81

... More
Removing Pipe

10

-

267.66

... More
CC road at Crack portion at various chainages

536.25

-

432.76

... More
Construction of embankment with approved material obtained from borrow pits with all lead and lift, transporting to site, spreading, grading to required slope and compacting to meet requirement as per MoRD Rural roads Specification Clause 301as per the direction of Engineer in charge by manual means. as per direction of Engineer in charge.

11943.98

-

128.91

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site).

-

-

-

... More
Take 50% of Excavation soil (From Culvert, Toe Wall & Drain + CC Road) +road side trench cutting 100% earth qty

1950.7

-

28.65

... More
Providing Construction of Moorum Shoulder by providing well graded material, spereading in uniform layers with tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD Technical Specification clause 401 and as per direction of Engineer in Charge.

489.75

-

1627.57

... More
Fixing of road cautionary Sign Board

-

-

-

... More
i) 600mm equilateral triangle

8

-

1605.35

... More
ii) 600mm Circular

8

-

1658.53

... More
Fixing of 5th KM stone

1

-

3474.23

... More
Fixing of Ordinary KM stone

6

-

2114.63

... More
Fixing of 200mtr stone

26

-

612.59

... More
Guide post

80

-

825.76

... More
Fixing of direction & place identification Sign

8

-

1928.62

... More
Earthwork in excavation for foundation of structures in all types of soil as per drawing and technical specification Clause 305 and 1104 of MoRD includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead & lift, dressing of sides and bottom and back filling with excavated suitable material upto 3mt. as per direction of Engineer-in-Charge.

2733.47

-

188.79

... More
Providing and constructing well compacted drainage layer above the subgrade of roadwork with approved quality of dust free washed coarse to medium sand as per Clauses 5.8 and 6.6 of SP:20-2002.

895.02

-

1206.13

... More
Providing Construction of granular sub-base Gr-III by providing close graded material, spereading in uniform layers with tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Clause 401 of MoSRT&H Technical Specification and as per direction of Engineer in Charge.

734.63

-

2563.13

... More
P.C.C(1:3:6) using 40mm size H.G.metal well rammed with cost, Conveyance , royality,taxes of all material and labour,T & P etc.Complete.(AR-2006-P-43)Per one cum

722.45

-

5590.74

... More
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub-base, with 43 grade cement or any other type as per Clause 1501.2.2, M30 (grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars near approaches to bridges and culverts (expansion joints), admixtures as approved, curing of concrete slabs for 14 days, curing compound and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.as per direction of Engineer in charge.

3791.11

-

7426.79

... More
Plain/reinforced cement concrete in sub-structure complete as per drawings and MORD technical specification Clauses 800,1200 and as per direction of the Engineer in charge

1238.51

-

5386.68

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MORD technical specification Clauses 614, 709, 1204 and as per direction of the Engineer in charge

847.36

-

106.51

... More
Providing concrete for plain / reinforced concrete in open foundation complete as per drawing and MORD technical specification Clause 800,1100,1200 and as per direction of Engineer-in-Charge.

12.54

-

5283.53

... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5

9.46

-

8667.78

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 including reinforcement complete as per direction of Engineer in charge.

2.36

-

6523.06

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) complete as per drawings and MORD technical specification Clauses 1000,1200 as per direction of the Engineer in charge

18.92

-

8887.56

... More
Routine Maintenance for 1st 5 year

-

-

-

... More
Restoration of rain cuts with soil, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORD technical specifications Clause 1902 by manual means as per direction of the Engineer in charge

-

-

-

... More
1st year Routine Maintenance

329.71

-

296.89

... More
2nd year Routine Maintenance

398.95

-

296.89

... More
3rd year Routine Maintenance

461.6

-

296.89

... More
4th year Routine Maintenance

527.54

-

296.89

... More
5th year Routine Maintenance

593.48

-

296.89

... More
Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MORD technical specification Clause 1903 as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

628.94

-

35.22

... More
2nd year Routine Maintenance

754.72

-

35.22

... More
3rd year Routine Maintenance

880.51

-

35.22

... More
4th year Routine Maintenance

1006.3

-

35.22

... More
5th year Routine Maintenance

1132.09

-

35.22

... More
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903.

-

-

-

... More
1st year Routine Maintenance

391.8

-

13.84

... More
2nd year Routine Maintenance

470.16

-

13.84

... More
3rd year Routine Maintenance

548.52

-

13.84

... More
4th year Routine Maintenance

626.88

-

13.84

... More
5th year Routine Maintenance

705.24

-

13.84

... More
Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type C as per MORD technical specification Clause 503,508,510,1904 as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

411.39

-

141.93

... More
2nd year Routine Maintenance

822.78

-

141.93

... More
3rd year Routine Maintenance

1234.17

-

141.93

... More
4th year Routine Maintenance

1645.56

-

141.93

... More
5th year Routine Maintenance

2056.95

-

141.93

... More
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908 of MORD and as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

1

-

1297.98

... More
2nd year Routine Maintenance

1

-

1297.98

... More
3rd year Routine Maintenance

1

-

1297.98

... More
4th year Routine Maintenance

2

-

1297.98

... More
5th year Routine Maintenance

2

-

1297.98

... More
Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

-

-

-

... More
2nd year Routine Maintenance

1.31

-

1184.82

... More
3rd year Routine Maintenance

1.96

-

1184.82

... More
4th year Routine Maintenance

3.27

-

1184.82

... More
5th year Routine Maintenance

6.53

-

1184.82

... More
Maintenance of 200 metre, km stones & 5th Km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

6.53

-

788.56

... More
2nd year Routine Maintenance

6.53

-

769.35

... More
3rd year Routine Maintenance

6.53

-

769.35

... More
4th year Routine Maintenance

6.53

-

769.35

... More
5th year Routine Maintenance

6.53

-

769.35

... More
Cutting of branches of trees from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

65

-

125.16

... More
2nd year Routine Maintenance

65

-

125.16

... More
3rd year Routine Maintenance

65

-

125.16

... More
4th year Routine Maintenance

65

-

125.16

... More
5th year Routine Maintenance

65

-

125.16

... More
Cutting of shurb from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

261

-

7.65

... More
2nd year Routine Maintenance

261

-

7.65

... More
3rd year Routine Maintenance

261

-

7.65

... More
4th year Routine Maintenance

261

-

7.65

... More
5th year Routine Maintenance

261

-

7.65

... More
Maintenance and repair of RCC railing to bring it to the original shape cleaning and repainting as per drawings and technical specification clause 1911 as per direction of Engineer in Charge.

-

-

-

... More
1st year Routine Maintenance

0.98

-

1665.83

... More
2nd year Routine Maintenance

0.98

-

1665.83

... More
3rd year Routine Maintenance

0.98

-

1665.83

... More
4th year Routine Maintenance

0.98

-

1665.83

... More
5th year Routine Maintenance

0.98

-

1665.83

... More
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908 of MORD as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

1

-

2597.11

... More
2nd year Routine Maintenance

1

-

2597.11

... More
3rd year Routine Maintenance

1

-

2597.11

... More
4th year Routine Maintenance

1

-

2597.11

... More
5th year Routine Maintenance

1

-

2597.11

... More
Triming of grass and weeds from the shoulder/berms and disposal the same to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge

-

-

-

... More
1st year Routine Maintenance

21842.85

-

2.55

... More
2nd year Routine Maintenance

26211.42

-

2.55

... More
3rd year Routine Maintenance

30579.99

-

2.55

... More
4th year Routine Maintenance

34948.56

-

2.55

... More
5th year Routine Maintenance

39317.13

-

2.55

... More
White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per MORD technical specifications Clause 1915 as per direction of the Engineer in charge.

-

-

-

... More
1st year Routine Maintenance

130.6

-

26.43

... More
2nd year Routine Maintenance

130.6

-

26.43

... More
3rd year Routine Maintenance

130.6

-

26.43

... More
4th year Routine Maintenance

130.6

-

26.43

... More
5th year Routine Maintenance

130.6

-

26.43



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.