Odisha Tourism Development Corporation Limited Tender
... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 2,15,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_OTDC_67227_1Bid Award Id
ViewTender No
BP I/55/2020-21 dt. 15.03.2021Tender Authority
Odisha Tourism Development Corporation Limited ViewPurchaser Address
-Website
http://http://www.otdc.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Lintel
-
-
-
... More
Third Floor
3.79
-
11826.6
... More
Fourth Floor
2.18
-
13263.8
... More
Roof Slab
-
-
-
... More
Third Floor
223.91
-
12867.4
... More
Fourth Floor
11.35
-
14513.4
... More
Staircase
-
-
-
... More
Third Floor
12.51
-
14684
... More
Fin
-
-
-
... More
Third Floor
194.41
-
2554
... More
Chajja
-
-
-
... More
Third Floor
58.09
-
1166.3
... More
Providing & fixing TOR Fe-500 D grade reinforcement bars of approved makes as per DTCN for RCC work of required diameter with straightening, cutting, bending, binding welding and joining (if necessary) and tying the grills and placing in position as required for R.C.C. work and providing fan hooks, hoisting, lowering and laying including cost, conveyance and taxes of tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all heights as per the drawing, design and direction of Engineer-in-charge. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.)
-
-
-
... More
Third Floor
1029.08
-
8268.1
... More
Fourth Floor
69.23
-
8293.7
... More
Brick work in superstructure with Flyash bricks of size 25x12x8cm in cement mortar (1:6) with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be well burnt, free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer in charge.
-
-
-
... More
Third Floor
293.37
-
4873
... More
FOURTH Floor
84.19
-
5267.7
... More
Brick work in superstructure with Flyash bricks of size 25x12x8cm in cement mortar (1:4) with best quality bricks having crushing strength not less than 75 Kg/cm2 imersing the bricks in water for not less than 6 hours before use (the bricks shall be well burnt, free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer in charge.
-
-
-
... More
Third Floor
17.28
-
5081.5
... More
Providing 25mm thick grading concrete in C.C. (1:2:2) laid in proper slope over terrace roof slab by using two part of sand, one part of cement and two parts of 6mm size black hard crusher broken granite chips with addition of water proofing compound of approved quality to be mixed with specified ratio including watering, curing, cost, conveyance, royalties, taxes of all materials, cost of all labour, T&P etc. complete as required for the finished item of work as directed by the Engineer-in-charge.
-
-
-
... More
Third Floor
1975.16
-
354.3
... More
Dismantalling and removal of old RCC from beam, column, roof slab,self, chajja etc including stacking of servicable material and removal of debries to an unobjectionable area within 50 mtr lead etc. complete with cost, conveyance, loading and unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge
-
-
-
... More
Third Floor
26.24
-
1323.1
... More
Providing 12mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) finished smooth to outside smooth surface of brick masonry walls after racking out the joints including watering and curing, rounding of corners etc. complete with cost, coveyance, loading and unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as desired by the Engineer in charge.
-
-
-
... More
Third Floor
719.92
-
155.8
... More
Fourth Floor
322
-
162
... More
Providing 12mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) finished smooth to inside smooth surface of brick masonry walls after racking out the joints including watering and curing, rounding of corners etc. complete with cost, coveyance, loading and unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as desired by the Engineer in charge.
-
-
-
... More
Third Floor
1134.15
-
148.8
... More
Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) finished smooth to inside surface of brick masonry walls after racking out joints including watering and curing rounding of corners etc. complete with cost, coveyance, loading and unloading, royalties and taxes of all materials and cost of all labour, T&P, sundries and scaffolding required for the work etc. with providing grooves as directed by the Engineer in charge.
-
-
-
... More
Third Floor
1290.54
-
212
... More
Fourth Floor
322
-
217.3
... More
Providing 6mm thick plaster in C.M. (1:4) over ceiling, chajja, loft, staircase, column, beams and walls after removing the false if necessary and close deep chipping including rounding of the corners, recess and roughening concrete surface where necessary, watering and curing, finished smooth over R.C.C. surface, including cost, conveyance, royalty, taxes of all materials, cost of all labour, T&P etc. complete as per direction of the Engineer-in-charge.
-
-
-
... More
Third Floor
2155.87
-
165
... More
Fourth Floor
65.25
-
169.1
... More
Providing & fixing chemicals &sweepers, making dry the surface with electric hot bower, grunding the surface and clearing dust particles mechanically, applying mico cement concrete at brick work sides up to 75mm thick x 75mm height and other side horizontal expansion joint with 75mm thick x 75mm size mico concrete strips, repairing other surfaces using cement concrete of prop(1:3) as required, inserting & placing 60mm dia backer rod in position, applying sika primer 80 to the prepared surface by brush and fixing combiflex (200mm x 2mm) with recommended adhesive sika dur 31C manually, after comp0letion of the process testing by flooring water on it after confirmation converting the length by aluminium sheet (300mm x 1.3mm) by means pvc plug ss screw and washer the horizontal expansion joints treatment with sika dur combiflex system including cost of all labour, T & P wire and remaining charges of all necessary machines etc. complete as per the direction of Engineer-in-charge.
42
-
3695.68
... More
Electrical Works
-
-
-
... More
Supply and laying of following size rigid PVC conduit pipe (medium ) etc complete with accessories such as bends, junction boxes, pull boxes etc in recess with all materials & labour as required as per the direction of Engineer-in-Charge.
-
-
-
... More
20 mm dia
1050
-
45
... More
25 mm dia
480
-
55
... More
32/40 mm dia
206
-
75
... More
Supply, installation, testing & commissioning of Fan hook etc complete with all materials & labour as required as per the direction of Engineer-in-Charge.
85
-
65
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements