Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_OPTCL_83676_11Bid Award Id
ViewTender No
OPTCL-CVL-SE -E-07 - 2022-23Tender Authority
Odisha Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://www.optcl.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
FIRST FLOOR
182.27
-
42.75
RCC (1:1.5:3) in following works and using 12 mm size black hard crusher broken granite stone chips of approved quality from approved quarry including lower laying concrete watering and curing etc complete to required level laid in layers not exceeding 150 mm ( 6’’) thick including cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge.
1
-
-
Coloumn and Beam in SS
32.78
-
17659.68
Supplying,fitting,fixing of MS rod or tor steel including straightening ,cutting, bending, binding by using binding wire of18-20 gauze, molding, welding, jointing if necessary and placing in position as per drawing & technical specification ( Payment shall be made on weight of M.S. Rod & Tor steel only and no separate payment will be made towards the weight of binding wires) including cost,conveyance, royalties and taxes of all materials and cost, conveyance,taxes of all labour T & P required etc complete as per direction of Engineer in charge.
24.58
-
8704.97
Cement concrete with (1:1.5:3) in using 12 mm size black hard crusher broken granite stone chips of approved quality from approved quarry including lower laying concrete watering and curing etc complete including cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge. (for minor repair works only)
1.98
-
6441.87
Providing,fitting and fixing of Al. Door with 12mm thick pre-laminated board in top and bottom portion with anodized Al. door section of 9202 as vertical member, 9201 as top and 9200 as middle and bottom member with frame section no 9221 and tapered clop No. 4660 and the frame to be completed by means of jointing angle No. 1855, etc complete including cost, conveyance royalties and taxes of all materials and cost,taxes of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge. (powder coated)
3.25
-
6424.73
Supplying, all labour, material T&P for fitting and fixing of floor spring. As per the direction of EIC.
2
-
2737.75
Supplying, all labour, material T&P for fitting and fixing of Door Closure. As per the direction of EIC.
2
-
1565.5
Supplying, fitting, fixing of Y-angle of 50mm X 50mm X 6mm angle(GI/MS) section including cost of materials, labour, taxes, cost conveyance, T&P as required etc. complete.
2494.8
-
65.2
Providing and fixing Concertina Coil Fencing with punched tape concertina coil 600 mm dia 10 Mtr openable length (toal length 90M), having 50 nos rounds per 6 M length, upto 3 M height of wall with existing angle iron 'Y' shaped placed 2.4 M or 3.00 M apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per the direction of Engineer - in - Charge, with reinforced barbed tape (R.B.T) / spring core (2.5 mm thick) wire of high tensile strength of 165 Kg/Sq.mm with tape (0.52mm thick) ad weight 43.478 gm/meter (cost of M.S. angle, CC blocks shall be paid separately)
851.26
-
548
12 mm thick cement plaster with cement and sand mortar (1:6 ) finished smooth over outside rough surfaces of brick masonry walls etc with watering and curing including cost, conveyance, royalties and taxes of all materials and cost, conveyance of all labour with T&P required for the work etc complete in all respect s as per the direction of the Engineer in charge.
1
-
-
GROUND FLOOR
1461.64
-
139.01
FIRST FLOOR
182.27
-
141.27
Priming one coat with of approved quality of primer of Berger make including cost, conveyance and taxes of all materials & cost ,conveyance taxes of all labour with T & P required etc complete in all respect as per the direction of the Eng.-in-charge
1
-
-
GROUND FLOOR
2436.07
-
61.26
FIRST FLOOR
303.78
-
62.75
Wall painting two coats with weather shield coat of approved shade over wall surface finished smooth to give an even shade including watering,curing etc complete including cost,conveyance,taxes of all materials and cost,conveyance,taxes of all labour with T&P required etc complete in all respects as per the direction of Eng.-in-charge.
1
-
-
GROUND FLOOR
2436.07
-
73
FIRST FLOOR
303.78
-
74.63
Priming one coat with of approved quality of primer of Berger make including cost, conveyance and taxes of all materials & cost ,conveyance taxes of all labour with T & P required etc complete in all respect as per the direction of the Eng.-in-charge. (OVER IRON SURFACE)
162.67
-
56.11
Painting two coats with ALUMINIUM paints to iron / wooden doors and windos with a paint of approved shade including cost, conveyance and taxes of all materials & cost ,conveyance taxes of all labour with T & P required etc complete in all respect as per the direction of the Eng.-in-charge
162.67
-
140.81
Supplying all labour with t & P required for removal of excess earth by mechanical means up to a distance of 5 KM including cost taxes of all labour with T & P required etc complete in all respect as per direction of EIC.
26.64
-
162.51
Supplying all labour with t & P required for Fabrication of iron works(labour only) including cost taxes of all labour with T & P required etc complete in all respect as per direction of EIC.
24.98
-
260.38