Odisha Power Transmission Corporation Limited Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
Refer DocumentsDocument Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_OPTCL_83676_9Bid Award Id
ViewTender No
OPTCL-CVL-SE -E-07 - 2022-23Tender Authority
Odisha Power Transmission Corporation Limited ViewPurchaser Address
-Website
http://https://www.optcl.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supplying all labour with T&P for rolling and compacting to sub grade or formation loosening by scarify of road surface 0.15 mtr depth including watering and rolling by PRR as per specification and direction of the EIC including cost, conveyance and taxes of all materials and cost,conveyance and taxes of all labour and T&P required for the work etc complete as per the direction of the EIC.
102.15
-
268.59
Earthwork in excavation in hard soil on foundation trenches in all kinds of soil including moorum stony earth and earth mixed with boulder except sheet rocks and boulders requiring blasting including dressing and leveling the bed up to the required depth and depositing the excavated materials with all leads and lifts T&P shoring and shuttering , dewatering if required etc complete including cost,conveyance,taxes of all labour with T&P required etc complete as per the direction of the Engineer in charge.
174.82
-
199.57
Supplying all labour with T&P for filling foundation and plinth with sand including watering, ramming etc comolete including cost , conveyance , royalties and taxes of all materials and cost of all labour with T&P required for the work etc complete (measurement will be taken on finished & complete section only) as per the direction of the Engineer in charge.
189.78
-
554.02
Cement concrete with (1:3:6) in foundation and floors using 40 mm ( 1 ½ ‘’) size black hard crusher broken granite stone metal of approved quality from approved quarry including lower laying concrete watering and curing etc complete to required level laid in layers not exceeding 150 mm ( 6’’) thick including cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge.
127.56
-
4438.54
Cement concrete with (1:1.5:3) in foundation and floors using 12 mm size black hard crusher broken granite stone chips of approved quality from approved quarry including lower laying concrete watering and curing etc complete to required level laid in layers not exceeding 150 mm ( 6’’) thick including cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge.
178.05
-
6458.4
RCC (1:1.5:3) M20 grade in in RCC slab members having a minimum compressive strength 20N/mm2 ( in work test of 200 Kg per CM2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S.516 ) using 12 mm to 20 mm size hard black crusher broken granite stone chips ( 20 mm size not to exceed 25% ) including hoisting, lowering, laying compacting concrete by using concrete mixer vibrators and similar equipments and tools and plants with watering and curing for 28 days including centering, shuttering and finishing the exposed surfaces smooth providing grooves or beads where necessary including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc complete in all respects but excluding the cost of M.S. rods or tor steel and binding wires and labour charges for cutting, bending, binding and tying the grills etc complete as per the direction of the Engineer - in – charge.
1.93
-
10957.17
Supplying,fitting,fixing of MS rod or tor steel including straightening ,cutting, bending, binding by using binding wire of18-20 gauze , molding, welding, jointing if necessary and placing in position as per drawing & technical specification ( Payment shall be made on weight of M.S. Rod & Tor steel only and no separate payment will be made towards the weight of binding wires) including cost,conveyance, royalties and taxes of all materials and cost, conveyance,taxes of all labour T & P required etc complete as per direction of Engineer in charge.
21.97
-
8715.85
Supplying all material and labour with T&P required for providing centering and shuttering in F & P etc complete including cost , conveyance , taxes etc complete as per direction of EIC.
99.31
-
106.57
Supplying all Labour and material for Spreading screened dust and consolidation with HRR including watering and including cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge.
102.15
-
919.75