Odisha Power Transmission Corporation Limited Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Odisha Power Transmission Corporation Limited - OPTCL Tender

Electrical and Electronics
Electrical Works
Eprocure
Opening Date5 Aug 2023
Closing Date25 Aug 2023
Tender Amount₹ 19,40,460 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Removing Cement/ lime plaster from walls, ceiling etc. including racking out the joints up to 12mm deep with removing & disposing the debris etc within 50mtr. lead. Including cost, conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc complete in all respects as per the direction of the Engineer-in- charge.

1

-

-

... More
Ground Floor

148.23

6323

42.66

... More
First Floor

143.72

6438

44.8

... More
Dismantling and Removing Old Damaged Floor Tile including stacking the useful materials for reuse and removing & disposing the debris etc. within 50mtr lead including cost, conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respects as per the direction of the Engineer-in- charge.

1

-

-

... More
Ground Floor

14.03

1496

106.65

... More
First Floor

7.94

889

111.99

... More
Dismantling and Removing Old Tiled Cladding from walls with racking out the joints up to12mm deep etc including stacking the useful materials for reuse and removing & disposing the debris etc. within 50mtr lead including cost, conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respects as per the direction of the Engineer-in- charge.

1

-

-

... More
Ground Floor

22.05

1222

55.46

... More
First Floor

36.07

2100

58.23

... More
Dismantling earthen wire Squatting PAN (Odisha Pan) etc, removing & disposing the debris etc. within 50 mtr lead and mending good to the damages to the floors etc complete including cost, conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respects as per the direction of the Engineer-in- charge.

5

3234

646.88

... More
Providing and Supplying for Cutting Grooves in pucca floor and walls for providing concealed pipe wiring with fittings for water supply line and making good to the damages with CC(1:3:6) using 12 mm size HBG stone chips finished with 12mm CP(1:3) and punning as per necessity etc complete including cost conveyance, royalty, taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the PH Specification and direction of the Engineer-in- charge.

28.5

5305

186.16

... More
Scraping old paint from old painted surfaces of wall /wood/iron with scrapers, sand papering and washing with soap or soda water with removing & disposing the debris etc. within 50mtr lead including cost, conveyance of all materials and labour with T&P, equipments, accessories, scaffolding etc and provision for all arrangements required for the works etc. complete in all respects as per the direction of the Engineer-in- charge.

2468.8

12640

5.12

... More
Filling in Foundation and Plinth with sand well watered and rammed, laid in layers not exceeding 150mm in thickness suitable to drawing and design compacted to required depth etc complete including cost conveyance royalty taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangements required for the works etc. complete in all respect as per the direction of the Engineering charge.

25.2

17154

680.75

... More
Cement Concrete work of proportion (1:4:8) in bed of foundation / basement of floor etc. using 40mm size hard black crusher broken granite stone metal of approved quality and from approved quarry laidd in layers not exceeding 150mm thick compacted to required depth suitable to drawing and design for the site with watering and curing to attain required strength etc complete including cost conveyance royalty taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the direction of the Engineer-in- charge.

18.9

87154

4611.35

... More
Providing water proofing to roof with Construction Chemicals including two coats of chemical painting with acrellic/ SBR latex modified in ratio (1:2:2) and 4cm (40mm) thick Grading Concrete in cement concrete (1:2:4) using 12mm and 6mm size hard black crusher broken granite stone chips of approved quality and from approved quarry of 50% each including batching ,mixing, blending etc for preparing the concrete with lowering, laying, hoisting etc for applying over RCC roof surface to proper grade and slope mixed with water Proofing compound as per necessity, compacted and finished smooth to get required thickness with watering and curing to attain required strength complete including cost, conveyance, royalty, taxes of all materials and cost, conveyance of all labour with T&P, equipments and accessories and provision for all arrangements required for the work etc. complete in all respects as per the direction of the Engineer-in- charge.

1

-

-

... More
Ground Floor

15.39

10171

660.92

... More
First Floor

17.45

12406

710.98

... More
12mm thick Sand and Cement plaster of proportion (1:6) finished smooth over smooth surfaces of brick masonry walls including racking out the joints with watering and curing etc complete including cost conveyance royalty taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the direction of the Engineer-in- charge.

1

-

-

... More
Ground Floor

99.59

14838

149

... More
First Floor

100.92

15393

152.53

... More
16mm thick Sand and Cement plaster of proportion (1:6) finished smooth over rough surfaces of brick masonry walls including racking out the joints with watering and curing etc complete including cost conveyance royalty taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the direction of the Engineer-in- charge.

1

-

-

... More
Ground Floor

48.64

10355

212.9

... More
First Floor

42.8

9337

218.16

... More
Providing Precast Slab made with Reinforced Cement Concrete (RCC) work (1:1½ :3) in using 12mm (½ inch) size hard black crusher broken granite stone chips of approved quality from approved quarry with watering and curing for 28 days to attain the required strength with cost of centering, shuttering and cost of re-enforcing materials like MS rod, tor-steel,binding wire and labour charges for making & tying the re-enforcing grills and including cost conveyance royalty taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the direction of the Engineer-in- charge.

1.01

15285

15134.14

... More
Providing Wall Tiling works in Dado,Skirting,rises of steps and vertical face of wall using Ceramic Tiles of premium grade and standard size of approve make & quality fixed over 12mm thick cement mortar (1:3) and jointed with cement slurry mixed with pigments to match the shade of the tiles,finishing with white cement etc including rubbing and polishing complete including cost conveyance royalty taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the direction of the Engineer-in- charge.

1

-

-

... More
Ground Floor

218.52

255257

1168.12

... More
First Floor

48.1

57750

1200.64

... More
Providing Floor Tiling works in floors, treads,on steps and landing using Ceramic ( Anty-skid type) Tiles of premium grade and standard size of approve make & quality laid over a bed of 25mm thick cement mortar (1:1) and jointed with cement slurry mixed with pigments to match the shade of the tiles, finishing with white cement etc including rubbing and polishing complete including cost conveyance royalty taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the direction of the Engineer-in- charge.

1

-

-

... More
Ground Floor

7.94

8699

1095.64

... More
First Floor

14.03

15689

1118.25

... More
Providing and Supplying for Plumbing & laying Un-plastisized PVC (UPVC) pipe (Confirming to IS-4985 of Class-IV-10 Kg per Sq.Cm) of approved make and quality for internal water supply in house plumbing with the following nominal dia with fittings, clamps etc firmly fixed to walls ,floors and ceiling etc with making good to the damages happened to surfaces etc including cost conveyance, royalty, taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the PH Specification and direction of the Engineer-in- charge.

1

-

-

... More
UPVC pipe- 20mm dia (Oriplast/Jaiswal/Finolax)

28.5

4541

159.36

... More
Providing Openable Door Works with Aluminum anodised Section No. 9202 as vertical member 9201 as Top & 9200 as middle & bottom member with frame section No. 9221 and Tappered clip No. 4660 and the frame to be completed by means of jointing angle No. 1855 etc complete & top portion of shuttering is to be made with 6mm thick plain glass with 12mm thick BWR Ply wood in bottom portion fixed on door framedully positioned with jointing angle, Tappered clips, rubber beading and fitted and fixed with handle, door closure (Godrej Make), door stopper, locking arrangements with 6 Lever Mortice Lock etc complete including cost, conveyance taxes of all materials and cost conveyance, of all labour with T&P, equipments and accessories and provision for all arrangements required for the works etc. complete in all respect as per the direction of the Engineer-in- charge.

29.49

263077

8920.9

... More
Supplying and fixing of Armstrong fine fissured False Ceiling System on 24mm flange stitched suspension prelude xl gris system having main Tee 3000mm long X 32mm web height X 24mm wide Tee sections. The main runner is to be fixed with 2mm thick pre-stretched GI wire with Soffit Cleat and GI Rawl plug inserted on the main roof to be fixed at 1200mm C/C.The Last hanger at the end of each main runner should not be greater that 450mm from the adjacent wall. The main Runner will be at the distance of 1200mm C/C. The flush fitting 1200mm X 30mm X 24mm wide Cross Tee Sections, with precesion stub end is to be clicked fit in betweeen the main Tee at a distance of 600mm to make a module of 1200mm X 600mm, another cross Tee with precesion stub stop end of size 600mm X 27mm X 24mm is to be click fitted at 1200 Sections parallel to main Tee at 600mm C/C to make a square grid of 600mm X 600mm, or base frame material click end shouldbe made of old rolled Tee steel components and coated with hot deep Galvanized Tee ( 170 gm/sqm, Zinc layer meeting the requirements of BS 2989.) It should have a capping of material coated with baked polyester. The peri meter trim of size 19mm X 19mm white colour secured at 450mm C/C with provision for accomodating ceiling illumination system etc complete including cost, conveyance taxes of all materials and cost conveyance, of all labour with T&P, equipments and accessories and provision for all arrangements required for the works etc. complete in all respect as per the direction of the Engineer-in- charge.

68.37

159408

2331.55

... More
Providing for Illuminating Appliances in false ceiling works with Optque Mirror Double Bar Fitting (40W each -Havels Make) with necessary electronic choke , starter, reflector etc, power connection complete for operating/working perfectly duly fitted and fixed with Aluminium false ceiling grid suitable to size including cutting making etc including cost, conveyance taxes of all materials and cost conveyance, of all labour with T&P, equipments and accessories and provision for all arrangements required for the works etc. complete in all respect as per the direction of the Engineer-in- charge.

8

42400

5300

... More
Suppying all labour and T&P for Wiring to Recess light points with 1.5 sqmm single core copper wire of approved quality, including cost, conveyance taxes of all materials and cost conveyance, of all labour with T&P, equipments and accessories and provision for all arrangements required for the works etc. complete in all respect as per the direction of the Engineer-in- charge.

8

2880

360

... More
Providing fitting and fixing of Aluminium Composit Pannel (ACP) door for bath and toilets made out of Aluminium Section No. 9835 as Horizontal & vertical members placed for framing the styles including top, bottom & lock rail and shuttering with 3mm thick Aluminium Composit Pannel sheet (ACP sheet) fitted and fixed to required size to suit the drawing & design of the opening etc complete including cost, conveyance taxes of all materials and cost conveyance, of all labour with T&P, equipments and accessories and provision for all arrangements required for the works etc. complete in all respect as per the direction of the Engineer-in- charge.

102.26

36072

352.75

... More
Providing Cement Washing one coat with good quality port land cement and water properly mixed, washed and finished over plastered surfaces after washing and cleaning the same etc complete including cost conveyance taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the Specification and direction of the Engineer-in- charge.

1

-

-

... More
Ground Floor

59.76

884

14.8

... More
First Floor

71.26

1083

15.21

... More
Providing Primming one coat with primer over plastered surface of approved quality and make painted and finished after washing and cleaning the same etc complete including cost conveyance taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the Specification and direction of the Engineer-in- charge.

1

-

-

... More
Ground Floor

1058.17

66114

62.48

... More
First Floor

908.35

58161

64.03

... More
Second Floor

211.03

13852

65.64

... More
Providing for Finishing surfaces of wall /ceiling with cement/water based wall putty of approved quality and make and finished smooth and even surface to receive painting etc complete including cost, conveyance taxes of all materials and cost conveyance, of all labour with T&P, equipments and accessories and provision for all arrangements for scaffolding, staging etc required for the works etc. complete in all respect as per the direction of the Engineer-in- charge.

964.11

91060

94.45

... More
Providing Painting two coats with plastic emulsion paint of approved quality, make and shade washed and finished smooth over surfaces of wall and ceiling after washing and cleaning the same etc complete including cost conveyance taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the Specification and direction of the Engineer-in- charge.

1

-

-

... More
Ground Floor

387.26

33618

86.81

... More
First Floor

510.43

45167

88.49

... More
Second Floor

66.42

5993

90.23

... More
Providing for Weather coat two coats of approved quality, make and shade washed and finished smooth over exterior surfaces of wall etc after washing and cleaning the same etc complete including cost conveyance taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the Specification and direction of the Engineer-in- charge.

1

-

-

... More
Ground Floor

670.91

53994

80.48

... More
First Floor

397.92

33142

83.29

... More
Second Floor

144.61

12469

86.23

... More
Providing and Supplying for Fitting and Fixing of porceiling / PVC / Water supply items in sanitary use of the following type of Approved make and quality as mentioned provided in proper position dully connected to water supply and sanitary system firmly fixed to walls ,floors and ceiling etc using clamps, brackets, nails, screws, bobins etc as required for plumbing the fittings and specials etc and making good to the damages happened to surfaces including cost conveyance, royalty, taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the PH Specification and direction of the Engineer-in- charge.

1

-

-

... More
22” X 16” Wash Hand Basin (Parryware / Bell)- with all necessary fittings for perfect functioning

5

29264

5852.9

... More
Odisha Pan (Parryware/ Bell ) with all necessary fittings for perfect functioning of 23"x 17"size

3

8299

2766.64

... More
Commode (Anglo Indian Water Closet) -Parryware/ Bell Make

2

9579

4789.65

... More
Standing Urinal (Parryware/Bell Make)

4

22802

5700.58

... More
Squating Urinal (Ladies Urinal)- Parryware/Bell Make

1

2728

2728.41

... More
12.5 Ltr Capacity PVC Lower Level Cistern (Parryware/ Bell) with all necessary fittings for perfect functioning

5

10033

2006.74

... More
Providing and Supplying for Fitting and Fixing of Toilet Accessories and Appliances (CP fittings) in sanitary use of the following type of Approved make and quality as mentioned provided in proper position dully connected to water supply and sanitary system firmly fixed to walls ,floors and ceiling etc using clamps, brackets, nails, screws, bobins etc as required for plumbing the fittings and specials etc and making good to the damages happened to surfaces including cost conveyance, royalty, taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the PH Specification and direction of the Engineer-in- charge.

1

-

-

... More
Mirror with hard board & screw ( Belgium/ Relience)- 5mm thick - 24” X 18” size

5

3074

614.83

... More
CP Brass Ball Bearing Shower with Arm (Plaza/Zigma/Cizor/Corona )- ½ ” size

5

3131

626.37

... More
CP Brass Towel Rail ( Plaza/Zigma/Cizor/Corona)- ¾” X 24” size

5

4351

870.35

... More
CP Brass Soap Holder (Plaza/Zigma/Cizor/Corona)

10

2452

245.21

... More
CP Brass Glass Self with glass slab (Plaza/Zigma/Cizor/Corona)- 24” X 5” size

5

3114

622.81

... More
CP Brass Long Body Bib Cock (Plaza/Zigma/Cizor/Corona)- ½ ” size

5

4233

846.62

... More
CP Brass Short Body Bib Cock (Plaza/Zigma/Cizor/Corona)- ½ ” size

5

3914

782.81

... More
CP Brass Consealed Stop Cock (Plaza/Zigma/Cizor/Corona )-½ ” size

10

9594

959.49

... More
CP Brass Angle Stop Cock (Plaza/Zigma/Cizor/Corona )- ½ ” size

10

7989

798.98

... More
CP Brass Gully Grating (Plaza/Zigma/Cizor/Corona)- 4” size

5

400

80.09

... More
Providing and Supplying for Plumbing & laying Un-plastisized PVC (UPVC) pipe (Confirming to IS-4985 of Class-IV-10 Kg per Sq.Cm) of approved make and quality for external water supply with the following nominal dia with fittings, clamps etc firmly fixed to walls ,floors and ceiling etc with making good to the damages happened to surfaces etc including cost conveyance, royalty, taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the PH Specification and direction of the Engineer-in- charge.

1

-

-

... More
UPVC pipe- 40mm dia (Oriplast/Jaiswal/Finolax)

15

4190

279.39

... More
UPVC pipe- 25mm dia (Oriplast/Jaiswal/Finolax)

15

3083

205.54

... More
Providing Floor Tiling works in floors, treads,on steps and landing using Parking Tiles of premium grade and standard size of approve make & quality laid over a bed of 25mm thick cement mortar (1:1) and jointed with cement slurry mixed with pigments to match the shade of the tiles, finishing with white cement etc including rubbing and polishing complete including cost conveyance royalty taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangement required for the works etc. complete in all respect as per the direction of the Engineer-in- charge.(Parking Tiles)

252

284747

1129.95

... More
Providing and Supplying for Removal and Disposal of surplus earth, debries, garbages etc with mechanical means like transportation by Truck /Tractor with loading and unloading of the materials to a distance up to 5 Kms etc complete including cost of Transportation charges and labour with T&P for collecting, loading, unloading, removal & disposal in all respects as per the direction of the Engineer-In-Charge

26.82

7957

296.71

... More
CESS 1%

1921247.83

19212

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.