National Highways And Infrastructure Development Corporation Limited Tender
View complete overview of Nagaland NHIDCL Tender
Costs
EMD
₹ 2,00,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Dpr For Construction Of Slope Protection Works Including Rock Fall Protection And Landslide Mitigation Measures From Km 123.840 To Km 166.700 Of Nh-29 Dimapur Kohima 4 Laning Project Under Sardp-ne Project In The State Of Nagaland- 2nd Call
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NHIDC_792819_1Tender No
NHIDCL/RO-Koh/Pro/DPR/DK/23-24Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Geological Expert
4
-
-
Geotechnical Expert
4
-
-
Hydrologist and Hydrological Modeling Expert
4
-
-
Traffic/ Road Signage/ Marking and Safety Expert
4
-
-
Environmental Specialist
2
-
-
Slope Protection Stabilization Expert,
4
-
-
Seismic, GIS, and Remote Sensing Expert
5
-
-
Sub-Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
-
-
-
Assistant Highway cum Pavement Engineer
4
-
-
Assistant Material cum Geotechnical Engineer Geologist
4
-
-
Survey Engineer
4
-
-
Assistant Quantity Surveyor/Documentation Expert
4
-
-
Support Staff
-
-
-
Office Manager
4
-
-
Office Boy
4
-
-
Transportation (Fixed costs)
-
-
-
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. (2 vehicles)
8
-
-
Duty Travel to Site (Fixed Costs)
1
-
-
Office Rent (Fixed Costs)
4
-
-
Office Supplies, Utilities and Communication (Fixed Costs)
4
-
-
Office Furniture and Equipment (Rental)
4
-
-
Reports and Document Printing
-
-
-
Monthly Report
12
-
-
Inception Report & QAP
3
-
-
Environment and Social Impact Screening Report
3
-
-
Draft Feasibility Report
3
-
-
Final Feasibility Report
3
-
-
Strip Plan with L.A. Reports
3
-
-
Draft LA and Clearances I Report
3
-
-
Final LA and Clearances I Report
3
-
-
Draft Environmental Assessment report & RAP
3
-
-
Final Environmental Assessment report & RAP
3
-
-
Draft Detailed Design Report & Drawings etc.
3
-
-
Draft EMP
3
-
-
Draft Bidding Documents
3
-
-
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
3
-
-
Final EMP
3
-
-
Final Bidding Documents
3
-
-
Draft 3(a) ,3(A) and 3(D) notification for land acquisition (3 copies each) or Equivalents (NH act N/A in the state of Nagaland)
9
-
-
LA & Clearances II Report
3
-
-
Survey and Investigation
-
-
-
Topographical Survey (Fixed Rate) Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer Detailed topographic surveys using mobile/aerial LiDAR or better technology
1
-
-
Investigation (Fixed cost) Road and Bridge Inventory, FWD Test and Pavement Evaluation Roughness Survey Axle Load Survey Material Survey and Investigation Sub-grade Investigation Traffic Survey Socio-economic & Census Survey/Studies Land Acquisition Studies Any other investigations/surveys, Sub-Soil Investigation (Boring)
1
-
-
Network Survey and GPR
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority. GPR Survey for detection of under ground utilities
1
-
-
Cost of supply and fixing Boundary Pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
1
-
-
Land Acquisition Team including support staff and logistics/ transportation
-
-
-
Ex-Land Revenue Inspector/Officer or equivalent
4
-
-
Ex-Kanoogo/ Girdwar or equivalent
4
-
-
Ex-Patwari or equivalent
4
-
-
Typist
4
-
-
Peon
4
-
-
Computer including necessary peripherals
4
-
-
Printers
4
-
-
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km
4
-
-