National Highways And Infrastructure Development Corporation Limited Tender

View complete overview of Nagaland NHIDCL Tender

National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender

Works
Civil And Construction
Road Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date3 Nov 2023
Closing Date4 Jan 2024
Tender Amount₹ 3,50,00,00,000 
Notes
Download

Costs

Summary

Nhidcl/ae/dk-package-i,ii Iii/2022-23

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bridge /Structural Engineer (1 No) 1*24

24

-

-

... More
Senior Quality cum Material Expert (1 No)

28

-

-

... More
Senior Geotechnical Expert (1 No)

14

-

-

... More
Senior Pavement Specialist

24

-

-

... More
Road Safety Expert

10

-

-

... More
Sub-Professional Staff

-

-

-

... More
Survey Engineer

36

-

-

... More
Assistant highway Engineer

24

-

-

... More
Assistant Bridge Engineer

36

-

-

... More
Quantity Surveyor

72

-

-

... More
Assistant Quantity cum material Engineer

36

-

-

... More
Support Staff (inclusive of per diem allowance)

-

-

-

... More
Office Manager

84

-

-

... More
Accountant cum Cashier

84

-

-

... More
Steno cum Computer Operator

132

-

-

... More
Office Boy (3no during construction and 1 in maintenance)

144

-

-

... More
Transportation (Fixed Costs)

-

-

-

... More
Scorpio or equivalent 4x4 vehicles (not more than 3 years old)

240

-

-

... More
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.

-

-

-

... More
Main office of minimum 200 Sqm area for During Construction period (1 Nos) 1*24

24

-

-

... More
During Maintenance /DLP period (1 No) 1*60=60 ( min 100 sqm area)

60

-

-

... More
Office Supplies, Utilities and Communication (Fixed Costs)

-

-

-

... More
Office Supplies during construction period for 1 office 1*24=24

24

-

-

... More
Office Supplies during Maintenance /DLP period for 1 office 1*60=60

60

-

-

... More
Office Furniture and Equipment (Rental) Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.,

-

-

-

... More
During Construction period for 1 no of office 1*24=24

24

-

-

... More
During Maintenance /DLP period for 1 no of office 1*60=60

60

-

-

... More
Reports and Document Printing ( rate as per copy)

-

-

-

... More
Monthly reports (Design and Construction) 84 months * 3 Copies) = 252 Copies

84

-

-

... More
Road Survey Equipment

-

-

-

... More
Surface defects detection and roughness measurement using Network Survey Vehicle

15

-

-

... More
Pavement strength measurement using FWD

15

-

-

... More
Bridge Inspection using Mobile Bridge Inspection Unit

15

-

-

... More
Road signs inspection using Retro Reflectometer

15

-

-

... More
Contigencies A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.