National Highways And Infrastructure Development Corporation Limited Tender

View complete overview of Nagaland NHIDCL Tender

National Highways And Infrastructure Development Corporation Limited - NHIDCL Tender

Eprocure
Opening Date2 Mar 2019
Closing DateCancelled
Tender Amount₹ 2,83,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Routine maintenance of Kohima to Nagaland Manipur border section of NH 29 Old NH 150 from Km 00 to Km 120.300 in the State of Nagaland
Routine maintenance of Kohima to Nagaland Manipur border section of NH 29 Old NH 150 from Km 00 to Km 120.300 in the State of Nagaland
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Subgrade (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300- 2)

1786

-

-

... More
Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of50 metres (average lead 25 metres)), by Manual Means

2734

-

-

... More
Sub Bases, Bases (Non- Bituminous) and Shoulders

-

-

-

... More
Granular Sub-base with Close Graded Material (Table:- 400-1): By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)

-

-

-

... More
for grading- II Material

1798.92

-

-

... More
for grading- III Material

607.05

-

-

... More
Miscellaneous work

-

-

-

... More
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)

33462.51

-

-

... More
Land Slide Clearance in soil (Clearance of land slides in soil and ordinary rock by a bulldozer D 80 A-12, 180 HP and disposal of the same on the valley side)

93140

-

-

... More
Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.)

4696

-

-

... More
Filling Pot- holes and Patch Repairs with - Bituminous concrete, 40mm. (Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2)

-

-

-

... More
for grading I Material

2000

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification. RCC/PSC Grade M35: Using concrete mixer.

-

-

-

... More
For solid slab super-structure- Height upto 5m (Deck slab repairing of culvert)

1.8

-

-

... More
Retaining Wal

-

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work

-

-

-

... More
upto 3 m depth

2.1

-

-

... More
Mechanical Means

2.1

-

-

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications

-

-

-

... More
PCC Grade M15

1.25

-

-

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications.

2.51

-

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications

6.31

-

-

... More
Coursed rubble masonry (first sort )

1.44

-

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

10

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification

-

-

-

... More
Granular material

4.55

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.